Crew Hotel & Transportation Management
Crew Management › Crew Day-of-Operations · 14 L4 steps · 5 phases · 5 decision gates · Updated 2026-03-19 10:36
📊
Process Flow Diagram (BPMN)
📋
L4 Process Steps
| Step | Step Name | Role / Swim Lane | System | Input | Output | KPI | Dec? | Exc? |
|---|---|---|---|---|---|---|---|---|
Phase 1 1.1 |
Extract layover schedule by station and date | Crew Scheduling Analyst | Jeppesen Crew Management Suite | Published crew pairings for 14-day rolling window | Layover demand matrix by city, date, and crew count | Schedule extraction latency <15 min after pairing publish | N | N |
| 1.2 | Forecast hotel room demand by city | Crew Logistics Coordinator | AWS Crew Operations System | Layover demand matrix, historical IROPS uplift factors by station | City-level room demand forecast with IROPS buffer (typically +15%) | Forecast accuracy ≥90% vs actual bookings week-over-week | N | N |
| 1.3 | Validate contracted block vs demand forecast | Crew Logistics Manager | Crew Hotel Management System | Room demand forecast, contracted block inventory by hotel and city | Block gap report flagging cities with coverage <95% | Contracted block coverage ≥95% of forecasted demand | Y | Y |
Phase 2 2.1 |
Auto-generate hotel reservations for pairings | Crew Logistics Coordinator | Crew Hotel Management System | Approved layover schedule, contracted hotel inventory | Hotel confirmation records with room type, check-in/out times | Auto-booking rate ≥98% for standard layovers; zero manual entry for pairings >48 hrs out | N | N |
| 2.2 | Book ground transport for crew arrival and departure | Crew Transport Coordinator | Ground Transport Dispatch System | Hotel confirmation records, scheduled flight arrival/departure times | Transport schedule with vendor assignment, vehicle type, and pickup windows | Transport booking confirmed ≥4 hrs before crew arrival; on-time pickup rate ≥97% | N | Y |
| 2.3 | Validate hotel transit time vs FAR 117 rest period | Crew Logistics Manager | Jeppesen Crew Management Suite | Hotel address, transport time estimate, crew report time for next leg | FAR Part 117 §117.25 compliance flag per crew member | 100% of layovers validated against FAR Part 117 before booking confirmation | Y | Y |
Phase 3 3.1 |
Monitor real-time schedule changes affecting layovers | Crew Control Officer | AWS Crew Operations System | Live flight operations feed, crew schedule update events | Change alerts for affected hotel and transport bookings | Change detection latency <5 min from schedule update event | N | N |
| 3.2 | Amend hotel and transport bookings for disruptions | Crew Logistics Coordinator | Crew Hotel Management System | Change alert with new layover city, arrival time, or cancellation flag | Amended or cancelled booking confirmations sent to hotel and transport vendor | Amendment completion within 30 min of schedule change notification | Y | Y |
| 3.3 | Push updated crew itinerary to mobile devices | Crew Control Officer | Jeppesen CrewConnect Mobile | Amended booking confirmations, crew contact roster | Push notification with hotel name, address, transport pickup time, and confirmation number | Notification delivery rate ≥99.5%; crew acknowledgement ≥95% within 30 min | N | N |
Phase 4 4.1 |
Dispatch transport on actual aircraft block-in | Crew Transport Coordinator | Ground Transport Dispatch System | ACARS actual gate arrival time, crew count from flight manifest | Driver dispatch instruction with ETA to gate | Transport wheels-rolling ≤20 min after block-in; crew at hotel ≤45 min after block-in | N | N |
| 4.2 | Confirm all crew aboard transport before departure | Crew Transport Coordinator | Ground Transport Dispatch System | Crew roster for arriving flight, driver headcount check | Departure confirmation or missing-crew alert | Crew accounting accuracy 100% before vehicle departs gate area | Y | Y |
| 4.3 | Source spot-rate hotel for IROPS overflow crew | Crew Logistics Manager | Crew Hotel Management System | Block gap report, IROPS declaration from Network Operations Control | Spot-rate hotel bookings for overflow crew with transport coordination | Overflow booking confirmed <2 hrs from IROPS declaration; spot rate ≤2.5x contracted rate | N | Y |
Phase 5 5.1 |
Reconcile hotel and transport invoices to bookings | Finance Analyst | SAP S/4HANA Finance (FI/CO) | Vendor invoices, hotel and transport booking confirmation records | Matched/unmatched line items and variance report by vendor | Invoice-to-booking match rate ≥97%; variance items resolved within 10 business days | Y | Y |
| 5.2 | Generate vendor performance scorecard | Crew Logistics Manager | Tableau / Power BI | Matched invoice data, crew feedback submissions, transport on-time records | Quarterly vendor scorecard covering cost compliance, service quality, and SLA adherence | Vendor SLA compliance ≥95%; crew accommodation satisfaction score ≥4.2 / 5.0 | N | N |
📋