v1.0
Home Crew Management ⭐ GitHub
📊

Process Flow Diagram (BPMN)

CM-13 BPMN diagram
📋

L4 Process Steps

StepStep NameRole / Swim LaneSystem InputOutputKPIDec?Exc?
Phase 1
1.1
Detect Open Crew Position Requiring Deadhead Crew Scheduling Coordinator Jeppesen Crew Management Schedule change event, crew absence report, or pairing modification trigger Open position flag with required report time and destination station Position detected within 30 min of trigger event; 95th-percentile detection latency N N
1.2 Calculate Deadhead Eligibility & Rest Window Crew Scheduling Coordinator Jeppesen Crew Management Crew member duty history, block hours, and rest timestamps from pairing record Earliest legal report time per FAR Part 117 / EASA FTL; rest compliance flag 100% FAR Part 117 compliance on all deadhead assignments; 0 regulatory violations Y Y
1.3 Identify Available Positioning Flight Options Crew Scheduling Coordinator Amadeus Altéa PSS Origin station, destination station, required arrival window Ranked list of viable positioning flights with seat availability and timing feasibility ≥3 routing options identified per positioning requirement; identification completed ≤15 min N N
Phase 2
2.1
Check Own-Airline Seat Availability Crew Scheduling Coordinator Amadeus Altéa PSS Positioning flight options list, cabin inventory snapshot Seat availability confirmation per candidate flight Own-carrier deadhead utilisation rate ≥85% of all positioning trips Y N
2.2 Request Interline or Charter Positioning Crew Travel Coordinator Sabre GDS No own-carrier availability confirmed; positioning deadline and budget ceiling Interline booking confirmation or charter request raised with vendor Interline deadhead cost ≤$500 per segment average; charter approval ≤60 min N Y
2.3 Book Deadhead Seat & Issue Travel Document Crew Scheduling Coordinator Amadeus Altéa PSS Confirmed flight selection, crew ID and employee number PNR booking record, crew boarding pass, travel authorisation number Booking confirmed ≥4 hours before positioning flight departure; 98% booking success rate N N
2.4 Notify Crew of Deadhead Assignment via App Crew Scheduling Coordinator SITA CrewConnect Confirmed PNR, flight details, report time, and destination duty assignment Push notification delivered to crew mobile app; acknowledgment receipt logged Crew notification issued ≥3 hours before check-in; acknowledgment rate ≥95% within 30 min Y Y
Phase 3
3.1
Coordinate Priority Boarding with Departure Gate Crew Scheduling Coordinator SITA Airport Management System (AMS) Crew PNR, flight gate assignment, boarding time Priority boarding flag applied to PNR; gate agent briefed on crew presence Deadhead crew boarded before door close 100% of trips; 0 involuntary offloads N N
3.2 Verify Crew Check-In Within Required Window Crew Travel Coordinator Amadeus Altéa PSS Check-in event, seat map, boarding pass issuance status Boarding pass issued; seat confirmed; check-in timestamp logged Check-in completed ≥90 min before STD (international) or ≥60 min (domestic) — 100% compliance Y Y
Phase 4
4.1
Monitor Positioning Flight Departure Status Crew Scheduling Coordinator Jeppesen Crew Management STD, real-time flight status feed from OAG Flight Status API Departure alert triggered if delay ≥30 min detected against crew arrival window Delay alert generated within 5 min of ATD divergence; monitoring coverage 100% of active deadheads Y N
4.2 Confirm Crew Boarded on Positioning Flight Crew Scheduling Coordinator Amadeus Altéa PSS Boarding scan data from gate reader Crew-on-board confirmation record with timestamp On-board confirmation received ≥15 min before block-out; 100% of tracked deadheads N Y
Phase 5
5.1
Confirm Crew Arrival at Destination Station Crew Scheduling Coordinator SITA CrewConnect Positioning flight block-in time, crew self-report via mobile app Arrival confirmation timestamp logged in pairing record Arrival confirmed within 15 min of block-in; 100% of active positioning trips N N
5.2 Validate Rest Compliance Before Activating Duty Crew Compliance Analyst Jeppesen Crew Management Arrival timestamp, cumulative duty history, transport time log, FAR Part 117 rule set Go / No-Go duty eligibility decision; compliance audit record 0 FAR Part 117 violations; 100% FTL compliance audit pass rate; review completed ≤10 min Y Y
5.3 Activate Crew for Assigned Duty Pairing Crew Scheduling Coordinator Jeppesen Crew Management Go decision from compliance check; destination duty pairing details Crew activated in system; pairing record updated; downstream operations notified Crew activation completed ≥45 min before STD of first duty leg; 98% on-time activation rate N N
Phase 6
6.1
Initiate Disruption Recovery for Failed Positioning Crew Controller Jeppesen Crew Management Missed or critically delayed positioning flight; unresolved open crew position Alternative coverage plan: standby activation, crew reassignment, or re-deadhead routing Alternative solution identified within 20 min of confirmed disruption; 0 flights cancelled solely due to unresolved crew positioning failure Y Y
📋

Process Attributes

Identification

Process IDCM-13
L1 DomainCrew Management
L2 ProcessCrew Day-of-Operations
L3 NameDeadhead & Positioning Management
L4 Steps15 across 6 phases
Decision Gates7 (all with iteration loops)
Exceptions7 documented

Swim Lanes (Roles)

Crew Scheduling Coordinator
Crew Travel Coordinator
Crew Compliance Analyst
Crew Controller

Systems & Tools

Jeppesen Crew ManagementAmadeus Altéa PSSSabre GDSSITA CrewConnectSITA Airport Management System (AMS)

Key Performance Indicators

Detect Open Crew Position Requiring DeadheadPosition detected within 30 min of trigger event; 95th-percentile detection latency
Calculate Deadhead Eligibility & Rest Window100% FAR Part 117 compliance on all deadhead assignments; 0 regulatory violations
Identify Available Positioning Flight Options≥3 routing options identified per positioning requirement; identification completed ≤15 min
Check Own-Airline Seat AvailabilityOwn-carrier deadhead utilisation rate ≥85% of all positioning trips
Request Interline or Charter PositioningInterline deadhead cost ≤$500 per segment average; charter approval ≤60 min
Book Deadhead Seat & Issue Travel DocumentBooking confirmed ≥4 hours before positioning flight departure; 98% booking success rate
Notify Crew of Deadhead Assignment via AppCrew notification issued ≥3 hours before check-in; acknowledgment rate ≥95% within 30 min
Coordinate Priority Boarding with Departure GateDeadhead crew boarded before door close 100% of trips; 0 involuntary offloads

Airline-Specific Risks & Pain Points

Late notification from operations control reduces available positioning flight windows, forcing costlier interline or charter options
Cumulative duty and transport time ambiguity under FAR Part 117 §117.25; manual override risk when schedulers bypass system warnings under pressure
Limited own-metal frequency on thin or spoke routes forces interline deadheads at significantly higher cost and approval overhead
High load factors on peak routes (>90% LF) eliminate deadhead seat inventory; conflicts arise with revenue upgrade requests in the same booking class
Absence of interline agreements with ultra-low-cost carriers limits competitive options; charter approvals require multi-level sign-off, slowing time-critical positioning
Deadhead bookings compete with upgrade inventory management; system priority rules inconsistently applied across stations, causing silent booking failures

Inputs / Outputs

Primary InputSchedule change event, crew absence report, or pairing modification trigger
Primary OutputAlternative coverage plan: standby activation, crew reassignment, or re-deadhead routing
PreviousCM-12 · Crew Recruitment & OnboardingNextCM-14 · Crew Performance Management