Deadhead & Positioning Management
Crew Management › Crew Day-of-Operations · 15 L4 steps · 6 phases · 7 decision gates · Updated 2026-03-19 13:42
📊
Process Flow Diagram (BPMN)
📋
L4 Process Steps
| Step | Step Name | Role / Swim Lane | System | Input | Output | KPI | Dec? | Exc? |
|---|---|---|---|---|---|---|---|---|
Phase 1 1.1 |
Detect Open Crew Position Requiring Deadhead | Crew Scheduling Coordinator | Jeppesen Crew Management | Schedule change event, crew absence report, or pairing modification trigger | Open position flag with required report time and destination station | Position detected within 30 min of trigger event; 95th-percentile detection latency | N | N |
| 1.2 | Calculate Deadhead Eligibility & Rest Window | Crew Scheduling Coordinator | Jeppesen Crew Management | Crew member duty history, block hours, and rest timestamps from pairing record | Earliest legal report time per FAR Part 117 / EASA FTL; rest compliance flag | 100% FAR Part 117 compliance on all deadhead assignments; 0 regulatory violations | Y | Y |
| 1.3 | Identify Available Positioning Flight Options | Crew Scheduling Coordinator | Amadeus Altéa PSS | Origin station, destination station, required arrival window | Ranked list of viable positioning flights with seat availability and timing feasibility | ≥3 routing options identified per positioning requirement; identification completed ≤15 min | N | N |
Phase 2 2.1 |
Check Own-Airline Seat Availability | Crew Scheduling Coordinator | Amadeus Altéa PSS | Positioning flight options list, cabin inventory snapshot | Seat availability confirmation per candidate flight | Own-carrier deadhead utilisation rate ≥85% of all positioning trips | Y | N |
| 2.2 | Request Interline or Charter Positioning | Crew Travel Coordinator | Sabre GDS | No own-carrier availability confirmed; positioning deadline and budget ceiling | Interline booking confirmation or charter request raised with vendor | Interline deadhead cost ≤$500 per segment average; charter approval ≤60 min | N | Y |
| 2.3 | Book Deadhead Seat & Issue Travel Document | Crew Scheduling Coordinator | Amadeus Altéa PSS | Confirmed flight selection, crew ID and employee number | PNR booking record, crew boarding pass, travel authorisation number | Booking confirmed ≥4 hours before positioning flight departure; 98% booking success rate | N | N |
| 2.4 | Notify Crew of Deadhead Assignment via App | Crew Scheduling Coordinator | SITA CrewConnect | Confirmed PNR, flight details, report time, and destination duty assignment | Push notification delivered to crew mobile app; acknowledgment receipt logged | Crew notification issued ≥3 hours before check-in; acknowledgment rate ≥95% within 30 min | Y | Y |
Phase 3 3.1 |
Coordinate Priority Boarding with Departure Gate | Crew Scheduling Coordinator | SITA Airport Management System (AMS) | Crew PNR, flight gate assignment, boarding time | Priority boarding flag applied to PNR; gate agent briefed on crew presence | Deadhead crew boarded before door close 100% of trips; 0 involuntary offloads | N | N |
| 3.2 | Verify Crew Check-In Within Required Window | Crew Travel Coordinator | Amadeus Altéa PSS | Check-in event, seat map, boarding pass issuance status | Boarding pass issued; seat confirmed; check-in timestamp logged | Check-in completed ≥90 min before STD (international) or ≥60 min (domestic) — 100% compliance | Y | Y |
Phase 4 4.1 |
Monitor Positioning Flight Departure Status | Crew Scheduling Coordinator | Jeppesen Crew Management | STD, real-time flight status feed from OAG Flight Status API | Departure alert triggered if delay ≥30 min detected against crew arrival window | Delay alert generated within 5 min of ATD divergence; monitoring coverage 100% of active deadheads | Y | N |
| 4.2 | Confirm Crew Boarded on Positioning Flight | Crew Scheduling Coordinator | Amadeus Altéa PSS | Boarding scan data from gate reader | Crew-on-board confirmation record with timestamp | On-board confirmation received ≥15 min before block-out; 100% of tracked deadheads | N | Y |
Phase 5 5.1 |
Confirm Crew Arrival at Destination Station | Crew Scheduling Coordinator | SITA CrewConnect | Positioning flight block-in time, crew self-report via mobile app | Arrival confirmation timestamp logged in pairing record | Arrival confirmed within 15 min of block-in; 100% of active positioning trips | N | N |
| 5.2 | Validate Rest Compliance Before Activating Duty | Crew Compliance Analyst | Jeppesen Crew Management | Arrival timestamp, cumulative duty history, transport time log, FAR Part 117 rule set | Go / No-Go duty eligibility decision; compliance audit record | 0 FAR Part 117 violations; 100% FTL compliance audit pass rate; review completed ≤10 min | Y | Y |
| 5.3 | Activate Crew for Assigned Duty Pairing | Crew Scheduling Coordinator | Jeppesen Crew Management | Go decision from compliance check; destination duty pairing details | Crew activated in system; pairing record updated; downstream operations notified | Crew activation completed ≥45 min before STD of first duty leg; 98% on-time activation rate | N | N |
Phase 6 6.1 |
Initiate Disruption Recovery for Failed Positioning | Crew Controller | Jeppesen Crew Management | Missed or critically delayed positioning flight; unresolved open crew position | Alternative coverage plan: standby activation, crew reassignment, or re-deadhead routing | Alternative solution identified within 20 min of confirmed disruption; 0 flights cancelled solely due to unresolved crew positioning failure | Y | Y |
📋