v1.0
Home Flight Operations ⭐ GitHub
📊

Process Flow Diagram (BPMN)

FO-07 BPMN diagram
📋

L4 Process Steps

StepStep NameRole / Swim LaneSystem InputOutputKPIDec?Exc?
Phase 1
1.1
Obtain ATIS & meteorological briefing Flight Dispatcher Honeywell GoDirect Weather Scheduled departure time, origin/destination airport pair Current ATIS information code, wx briefing package Briefing completed ≥45 min before STD; 100% crew acknowledgement rate N N
1.2 File IFR flight plan with ANSP Flight Dispatcher NAVBLUE Flight Planning Optimised route, fuel load, aircraft type, SELCAL code Filed ICAO flight plan (FPL message) accepted by ANSP Flight plan filed ≥60 min before STD per ICAO Doc 4444; acceptance rate ≥99% N N
1.3 Request CTOT/EDCT slot from ATFM system Flight Dispatcher FAA Traffic Flow Management System (TFMS) Filed flight plan, GDP/GS advisory for destination or en-route ARTCC EDCT (Expect Departure Clearance Time) slot assignment EDCT compliance rate ≥95%; slot deviation window ±5 min Y N
1.4 Negotiate revised slot if CTOT unacceptable Flight Dispatcher FAA Traffic Flow Management System (TFMS) Initial EDCT that conflicts with operational constraints or crew duty limits Revised EDCT or cancellation/delay decision logged in NAVBLUE Slot substitution request processed within 10 min of receipt; substitution approval rate ~60% per FAA ATCSCC data N Y
Phase 2
2.1
Request IFR departure clearance from ATC Flight Crew / Dispatcher Telex / SITA ACARS Filed route, EDCT window, current ATIS code ATC clearance (SID, squawk code, initial altitude, departure frequency) Clearance received ≥15 min before EDCT; clearance readback accuracy 100% Y N
2.2 Verify clearance against filed route & amend if needed Flight Dispatcher NAVBLUE Flight Planning Received ATC clearance text, original filed IFR route Amended flight plan accepted by ATC or confirmation of route match Route amendment turnaround <5 min; zero departures on unapproved route N Y
2.3 Coordinate pushback & engine start with ground ATC Flight Crew SITA Airport Management System (AMS) Approved clearance, gate status from AMS, ramp clearance Pushback approval, engine start time logged in AMS Pushback-to-wheels-up compliance with EDCT ±5 min; gate conflict rate <2% N N
2.4 Obtain taxi clearance & confirm runway assignment Flight Crew Jeppesen FliteDeck Engine start confirmation, active runways, NOTAMs from FliteDeck Taxi route confirmed on EFB moving map; runway assignment accepted Taxi time within airline benchmark (e.g. ≤12 min at focus cities); runway incursion events = 0 N N
Phase 3
3.1
Monitor ATC sector handoffs & frequency changes Flight Crew / Dispatcher Telex / SITA ACARS Departure from origin TRACON, en-route ARTCC sector list from NAVBLUE ACARS position reports at waypoints; sector contact log ACARS position report every 30 min or at each waypoint; missed report alert <2 min N N
3.2 Receive & assess TFMS en-route flow advisories Flight Dispatcher FAA Traffic Flow Management System (TFMS) En-route Miles-in-Trail (MIT) restrictions, Airspace Flow Program (AFP) advisories Compliance assessment; amended release or hold action if needed AFP compliance rate ≥97%; dispatcher response to advisory <10 min Y N
3.3 Coordinate weather deviation or reroute with ATC Flight Crew / Dispatcher Honeywell GoDirect Weather Onboard weather radar data, GoDirect TurbCast/convective sigmets ATC-approved route deviation or altitude change; updated NAVBLUE flight plan Deviation request approval by ATC <3 min after pilot request; fuel impact assessed 100% of deviations Y Y
Phase 4
4.1
Obtain destination ATIS & update approach briefing Flight Crew / Dispatcher Honeywell GoDirect Weather Current destination ATIS (D-ATIS), TAF, PIREP data from GoDirect Updated approach briefing; alternate airport confirmed if wx below minima ATIS update obtained ≥30 min before TOD; alternate fuel carried 100% when wx within 3h of approach minima N N
4.2 Sequence into STAR & configure for arrival flow Flight Crew Jeppesen FliteDeck ATC-assigned STAR, speed/altitude restrictions, runway in use FMS programmed with STAR; compliance with ATC sequence instructions confirmed STAR compliance rate ≥99%; speed restriction deviation events <0.5% of arrivals N N
4.3 Execute holding pattern if ATC flow delay required Flight Crew / Dispatcher NAVBLUE Flight Planning ATC holding instruction, current fuel state vs NAVBLUE holding fuel reserves Holding entry flown or divert decision made; dispatcher notified of fuel state Holding fuel contingency ≥30 min per FAR 121.639; divert decision made before minimum divert fuel threshold Y Y
4.4 Coordinate gate & stand assignment with airport ops Flight Dispatcher / Station Ops SITA Airport Management System (AMS) ETA update from ACARS, gate availability from AMS, inbound connection data Confirmed gate assignment published in AMS; ground handling notified Gate assignment confirmed ≥20 min before ETA; gate conflict rate <1% N N
Phase 5
5.1
Close flight plan & confirm arrival report Flight Dispatcher NAVBLUE Flight Planning Block-in time from AMS, ATC arrival message Flight plan closed in NAVBLUE; OOOI times recorded (Out/Off/On/In) Flight plan closure within 5 min of block-in; OOOI data accuracy 100% N N
5.2 Review ATC communications log for deviations Flight Dispatcher Telex / SITA ACARS ACARS message archive, crew debrief notes Deviation log entry; flag for ASAP review if applicable Post-flight review completed within 2 hours of block-in for all flagged flights Y N
5.3 File ASAP/MOR report for ATC deviation or incident Flight Dispatcher / Safety Officer NAVBLUE Flight Planning Deviation flag from step 5.2, crew narrative, ATC incident reference number ASAP report submitted to airline safety program; MOR filed with ANSP if required ASAP report filed within 24 hours of incident per FAA AC 120-66B; 100% of flagged deviations reported N Y
📋

Process Attributes

Identification

Process IDFO-07
L1 DomainFlight Operations
L2 ProcessFlight Dispatch & Control
L3 NameAir Traffic Control Coordination
L4 Steps18 across 5 phases
Decision Gates6 (all with iteration loops)
Exceptions5 documented

Swim Lanes (Roles)

Flight Dispatcher
Flight Crew / Dispatcher
Flight Crew
Flight Dispatcher / Station Ops
Flight Dispatcher / Safety Officer

Systems & Tools

Honeywell GoDirect WeatherNAVBLUE Flight PlanningFAA Traffic Flow Management System (TFMS)Telex / SITA ACARSSITA Airport Management System (AMS)Jeppesen FliteDeck

Key Performance Indicators

Obtain ATIS & meteorological briefingBriefing completed ≥45 min before STD; 100% crew acknowledgement rate
File IFR flight plan with ANSPFlight plan filed ≥60 min before STD per ICAO Doc 4444; acceptance rate ≥99%
Request CTOT/EDCT slot from ATFM systemEDCT compliance rate ≥95%; slot deviation window ±5 min
Negotiate revised slot if CTOT unacceptableSlot substitution request processed within 10 min of receipt; substitution approval rate ~60% per FAA ATCSCC data
Request IFR departure clearance from ATCClearance received ≥15 min before EDCT; clearance readback accuracy 100%
Verify clearance against filed route & amend if neededRoute amendment turnaround <5 min; zero departures on unapproved route
Coordinate pushback & engine start with ground ATCPushback-to-wheels-up compliance with EDCT ±5 min; gate conflict rate <2%
Obtain taxi clearance & confirm runway assignmentTaxi time within airline benchmark (e.g. ≤12 min at focus cities); runway incursion events = 0

Airline-Specific Risks & Pain Points

GoDirect ATIS latency can lag live tower broadcasts by 3–5 min during high-volume periods, risking crew departure on stale altimeter settings
NAVBLUE route optimisation does not automatically incorporate FAA Coded Departure Routes (CDRs) during Ground Delay Programs, requiring manual dispatcher override
TFMS EDCT updates can arrive with <15 min notice, making ground crew coordination nearly impossible during high-frequency departure banks at focus cities
FAA does not guarantee slot substitution approval; carriers without dedicated ATC coordination desk (like low-cost carriers) suffer higher rejection rates
Voice clearance delivery congestion at Class B airports (ORD, ATL, LAX) causes average 8–12 min clearance delays during push banks; PDC via ACARS not universally available
ATC short-notice route amendments (e.g. miles-in-trail restrictions) require rapid NAVBLUE recalculation that may invalidate pre-filed fuel load, triggering re-release

Inputs / Outputs

Primary InputScheduled departure time, origin/destination airport pair
Primary OutputASAP report submitted to airline safety program; MOR filed with ANSP if required
PreviousFO-06 · Weather Monitoring & Decision SupportNextFO-08 · Network Operations Control (NOC)