Air Traffic Control Coordination
Flight Operations › Flight Dispatch & Control · 18 L4 steps · 5 phases · 6 decision gates · Updated 2026-03-18 22:51
📊
Process Flow Diagram (BPMN)
📋
L4 Process Steps
| Step | Step Name | Role / Swim Lane | System | Input | Output | KPI | Dec? | Exc? |
|---|---|---|---|---|---|---|---|---|
Phase 1 1.1 |
Obtain ATIS & meteorological briefing | Flight Dispatcher | Honeywell GoDirect Weather | Scheduled departure time, origin/destination airport pair | Current ATIS information code, wx briefing package | Briefing completed ≥45 min before STD; 100% crew acknowledgement rate | N | N |
| 1.2 | File IFR flight plan with ANSP | Flight Dispatcher | NAVBLUE Flight Planning | Optimised route, fuel load, aircraft type, SELCAL code | Filed ICAO flight plan (FPL message) accepted by ANSP | Flight plan filed ≥60 min before STD per ICAO Doc 4444; acceptance rate ≥99% | N | N |
| 1.3 | Request CTOT/EDCT slot from ATFM system | Flight Dispatcher | FAA Traffic Flow Management System (TFMS) | Filed flight plan, GDP/GS advisory for destination or en-route ARTCC | EDCT (Expect Departure Clearance Time) slot assignment | EDCT compliance rate ≥95%; slot deviation window ±5 min | Y | N |
| 1.4 | Negotiate revised slot if CTOT unacceptable | Flight Dispatcher | FAA Traffic Flow Management System (TFMS) | Initial EDCT that conflicts with operational constraints or crew duty limits | Revised EDCT or cancellation/delay decision logged in NAVBLUE | Slot substitution request processed within 10 min of receipt; substitution approval rate ~60% per FAA ATCSCC data | N | Y |
Phase 2 2.1 |
Request IFR departure clearance from ATC | Flight Crew / Dispatcher | Telex / SITA ACARS | Filed route, EDCT window, current ATIS code | ATC clearance (SID, squawk code, initial altitude, departure frequency) | Clearance received ≥15 min before EDCT; clearance readback accuracy 100% | Y | N |
| 2.2 | Verify clearance against filed route & amend if needed | Flight Dispatcher | NAVBLUE Flight Planning | Received ATC clearance text, original filed IFR route | Amended flight plan accepted by ATC or confirmation of route match | Route amendment turnaround <5 min; zero departures on unapproved route | N | Y |
| 2.3 | Coordinate pushback & engine start with ground ATC | Flight Crew | SITA Airport Management System (AMS) | Approved clearance, gate status from AMS, ramp clearance | Pushback approval, engine start time logged in AMS | Pushback-to-wheels-up compliance with EDCT ±5 min; gate conflict rate <2% | N | N |
| 2.4 | Obtain taxi clearance & confirm runway assignment | Flight Crew | Jeppesen FliteDeck | Engine start confirmation, active runways, NOTAMs from FliteDeck | Taxi route confirmed on EFB moving map; runway assignment accepted | Taxi time within airline benchmark (e.g. ≤12 min at focus cities); runway incursion events = 0 | N | N |
Phase 3 3.1 |
Monitor ATC sector handoffs & frequency changes | Flight Crew / Dispatcher | Telex / SITA ACARS | Departure from origin TRACON, en-route ARTCC sector list from NAVBLUE | ACARS position reports at waypoints; sector contact log | ACARS position report every 30 min or at each waypoint; missed report alert <2 min | N | N |
| 3.2 | Receive & assess TFMS en-route flow advisories | Flight Dispatcher | FAA Traffic Flow Management System (TFMS) | En-route Miles-in-Trail (MIT) restrictions, Airspace Flow Program (AFP) advisories | Compliance assessment; amended release or hold action if needed | AFP compliance rate ≥97%; dispatcher response to advisory <10 min | Y | N |
| 3.3 | Coordinate weather deviation or reroute with ATC | Flight Crew / Dispatcher | Honeywell GoDirect Weather | Onboard weather radar data, GoDirect TurbCast/convective sigmets | ATC-approved route deviation or altitude change; updated NAVBLUE flight plan | Deviation request approval by ATC <3 min after pilot request; fuel impact assessed 100% of deviations | Y | Y |
Phase 4 4.1 |
Obtain destination ATIS & update approach briefing | Flight Crew / Dispatcher | Honeywell GoDirect Weather | Current destination ATIS (D-ATIS), TAF, PIREP data from GoDirect | Updated approach briefing; alternate airport confirmed if wx below minima | ATIS update obtained ≥30 min before TOD; alternate fuel carried 100% when wx within 3h of approach minima | N | N |
| 4.2 | Sequence into STAR & configure for arrival flow | Flight Crew | Jeppesen FliteDeck | ATC-assigned STAR, speed/altitude restrictions, runway in use | FMS programmed with STAR; compliance with ATC sequence instructions confirmed | STAR compliance rate ≥99%; speed restriction deviation events <0.5% of arrivals | N | N |
| 4.3 | Execute holding pattern if ATC flow delay required | Flight Crew / Dispatcher | NAVBLUE Flight Planning | ATC holding instruction, current fuel state vs NAVBLUE holding fuel reserves | Holding entry flown or divert decision made; dispatcher notified of fuel state | Holding fuel contingency ≥30 min per FAR 121.639; divert decision made before minimum divert fuel threshold | Y | Y |
| 4.4 | Coordinate gate & stand assignment with airport ops | Flight Dispatcher / Station Ops | SITA Airport Management System (AMS) | ETA update from ACARS, gate availability from AMS, inbound connection data | Confirmed gate assignment published in AMS; ground handling notified | Gate assignment confirmed ≥20 min before ETA; gate conflict rate <1% | N | N |
Phase 5 5.1 |
Close flight plan & confirm arrival report | Flight Dispatcher | NAVBLUE Flight Planning | Block-in time from AMS, ATC arrival message | Flight plan closed in NAVBLUE; OOOI times recorded (Out/Off/On/In) | Flight plan closure within 5 min of block-in; OOOI data accuracy 100% | N | N |
| 5.2 | Review ATC communications log for deviations | Flight Dispatcher | Telex / SITA ACARS | ACARS message archive, crew debrief notes | Deviation log entry; flag for ASAP review if applicable | Post-flight review completed within 2 hours of block-in for all flagged flights | Y | N |
| 5.3 | File ASAP/MOR report for ATC deviation or incident | Flight Dispatcher / Safety Officer | NAVBLUE Flight Planning | Deviation flag from step 5.2, crew narrative, ATC incident reference number | ASAP report submitted to airline safety program; MOR filed with ANSP if required | ASAP report filed within 24 hours of incident per FAA AC 120-66B; 100% of flagged deviations reported | N | Y |
📋