Process Flow Diagram (BPMN)

GO-05 BPMN diagram
📋

L4 Process Steps

StepStep NameRole / Swim LaneSystem InputOutputKPIDec?Exc?
Phase 1
1.1
Receive inbound flight movement data Stand Allocation Manager SITA Airport Management System (AMS) Inbound OOOI messages and updated ETA from ACARS Confirmed stand assignment and estimated on-block time Stand assignment confirmed ≥30 min before ETA N N
1.2 Allocate ramp resources to inbound flight Ramp Resource Planner Inform GroundStar Stand assignment, aircraft type, turnaround time target GSE allocation plan (GPU, belt loaders, pushback tug, stairs/JBs) Resource plan published ≥20 min before on-block; GSE utilisation ≥75% N N
1.3 Confirm stand readiness and brief ramp team Ramp Duty Manager SITA Airport Management System (AMS) Incoming stand occupancy status, previous turn clearance confirmation Stand ready flag set; ramp crew briefed on aircraft type, turn time, and special loads Stand cleared ≥10 min before on-block for 95% of turns Y Y
Phase 2
2.1
Marshal aircraft to allocated stand Marshaller / Follow-Me Driver SITA Airport Management System (AMS) Stand ready confirmation, aircraft taxiing signal from Tower Aircraft parked on stand with wheel position confirmed On-block within 2 min of scheduled on-block time for 80% of turns N N
2.2 Position chocks, connect GPU and air bridge Ground Equipment Operator Inform GroundStar Aircraft on-block confirmation from marshaller Chocks placed, GPU connected, aircraft on external power, air bridge docked GPU connected within 3 min of on-block; APU off within 5 min of on-block N N
2.3 Conduct FOD check and open aircraft holds Ramp Safety Agent Inform GroundStar Aircraft chocked and powered; airside safety clearance FOD-clear certification logged; hold doors open and belt loaders positioned FOD check completed within 5 min of chocking; zero FOD incidents per 10,000 turns Y Y
2.4 Offload passenger baggage and ULDs Ramp Agent SITA LoadPlanner Offload sequence from LoadPlanner; ULD manifest from originating station All baggage and ULDs offloaded and sorted to arrivals belt or transfer make-up area First bag on belt ≤20 min after on-block; last bag ≤35 min for narrow-body N Y
2.5 Offload cargo and mail per cargo manifest Cargo Ramp Agent SITA LoadPlanner Cargo manifest (AWBs, special load codes), ULD positions from LoadPlanner Cargo offloaded to bonded shed or transfer unit; DG and live animal loads handled per IATA DGR Cargo offload complete within 30 min of on-block; 100% DG loads documented per IATA DGR N Y
Phase 3
3.1
Perform lavatory and potable water servicing Ground Service Agent Inform GroundStar Aircraft offload complete signal; lavatory service task assigned in GroundStar Lavatory tanks emptied and rinsed; potable water tank filled to required level Lavatory service complete within 15 min of task start; zero potable water contamination events N N
3.2 Calculate and uplift fuel per dispatch release Fueling Agent Into-Plane Fuel Management System Fuel uplift order from dispatch release (Jeppesen FliteDeck / NAVBLUE); aircraft fuel gauges Fuel uplifted to required quantity; fuel receipt signed and data transmitted Fueling complete ≥15 min before scheduled departure; fuel quantity variance ≤50 kg vs. dispatch order Y Y
3.3 Complete aircraft interior cleaning Cabin Cleaning Crew Supervisor Inform GroundStar Cabin cleaning task released in GroundStar after passenger deplane confirmed Cabin cleaned, seat pockets restocked, galleys reset; cleaning sign-off in GroundStar Cleaning complete within allocated turn time window; cabin cleanliness score ≥4.2/5 in post-flight survey N N
Phase 4
4.1
Load catering and provisioning per galley plan Catering Supervisor Inform GroundStar Catering uplift order from catering management system; galley configuration file All trolleys and supplies loaded to correct galley positions; catering doors secured Catering loading complete ≥20 min before STD; zero missing trolley events per 1,000 turns Y Y
4.2 Verify catering counts against flight specification Load Controller Inform GroundStar Catering delivery notes; passenger load forecast from Amadeus Altéa PSS Catering verification sign-off; discrepancy report raised if counts mismatch Catering verification complete within 5 min of loading; discrepancy rate <0.5% of turns N Y
Phase 5
5.1
Receive final pax load and generate load plan Load Controller SITA LoadPlanner Final check-in closure data from Amadeus Altéa PSS; baggage weight data; cargo manifest Load instruction report (LIR) with ULD build plan and position assignments Load plan generated ≤10 min after check-in closure; load factor accuracy ±1% of actual Y Y
5.2 Load passenger baggage per approved load plan Ramp Agent SITA LoadPlanner Approved LIR with ULD positions and weight targets per hold zone Baggage loaded and locked in correct positions; actual weights per hold recorded in LoadPlanner Baggage loaded per plan with ≤2% position deviation; loading complete ≥15 min before STD N Y
5.3 Load outbound cargo and mail per manifest Cargo Ramp Agent SITA LoadPlanner Cargo manifest (AWBs); DG declarations; ULD build instructions from LoadPlanner Cargo loaded per IATA ULD regulations; high-value and DG loads segregated and documented Cargo loading complete ≥20 min before STD; 100% DG segregation compliance per IATA DGR N Y
Phase 6
6.1
Calculate final weight and balance Load Controller SITA LoadPlanner Final pax count and weights, actual baggage and cargo weights, fuel uplift confirmation Final loadsheet with ZFW, TOW, CG% MAC, and trim setting Loadsheet issued ≥10 min before STD; CG within certified envelope 100% of departures Y Y
6.2 Transmit loadsheet to flight crew via ACARS Load Controller Telex / SITA ACARS Approved final loadsheet from SITA LoadPlanner Loadsheet transmitted and acknowledged by flight deck; printed copy retained per regulatory requirement ACARS loadsheet transmission ≥8 min before STD; crew acknowledgement within 2 min N Y
6.3 Disconnect all GSE and confirm all-clear Ground Equipment Operator Inform GroundStar Doors-closed signal from cabin crew; loadsheet acknowledgement from flight deck GPU disconnected, chocks removed, all GSE clear of aircraft; all-clear signal given to flight deck All GSE cleared ≥3 min before off-block; zero FOD events during pushback phase Y Y
6.4 Coordinate pushback and engine start with ATC Pushback Supervisor Telex / SITA ACARS All-clear confirmed; ATIS and pushback clearance from ATC via VHF Aircraft pushed back to runway heading; engine start sequence complete; pushback crew clear Off-block within 1 min of target off-block time (TOBT) for 78% of departures N Y
📋

Process Attributes

Identification

Process IDGO-05
L1 DomainGround Operations & Airport Services
L2 ProcessRamp & Turnaround Operations
L3 NameRamp & Turnaround Operations
L4 Steps20 across 6 phases
Decision Gates7 (all with iteration loops)
Exceptions14 documented

Swim Lanes (Roles)

Stand Allocation Manager
Ramp Resource Planner
Ramp Duty Manager
Marshaller / Follow-Me Driver
Ground Equipment Operator
Ramp Safety Agent
Ramp Agent
Cargo Ramp Agent
Ground Service Agent
Fueling Agent
Cabin Cleaning Crew Supervisor
Catering Supervisor
Load Controller
Pushback Supervisor

Systems & Tools

SITA Airport Management System (AMS)Inform GroundStarSITA LoadPlannerInto-Plane Fuel Management SystemTelex / SITA ACARS

Key Performance Indicators

Receive inbound flight movement dataStand assignment confirmed ≥30 min before ETA
Allocate ramp resources to inbound flightResource plan published ≥20 min before on-block; GSE utilisation ≥75%
Confirm stand readiness and brief ramp teamStand cleared ≥10 min before on-block for 95% of turns
Marshal aircraft to allocated standOn-block within 2 min of scheduled on-block time for 80% of turns
Position chocks, connect GPU and air bridgeGPU connected within 3 min of on-block; APU off within 5 min of on-block
Conduct FOD check and open aircraft holdsFOD check completed within 5 min of chocking; zero FOD incidents per 10,000 turns
Offload passenger baggage and ULDsFirst bag on belt ≤20 min after on-block; last bag ≤35 min for narrow-body
Offload cargo and mail per cargo manifestCargo offload complete within 30 min of on-block; 100% DG loads documented per IATA DGR

Airline-Specific Risks & Pain Points

Late gate changes due to ATC slot revisions or prior turn overrun cause cascading resource conflicts — AMS does not auto-trigger GSE reallocation
GSE availability gaps during peak banks — GroundStar planning horizon is 4 hours; sub-contracted handling agents may not sync real-time equipment status
Stand conflicts when previous turn is delayed — SITA AMS does not automatically notify ramp crew of stand swap; verbal communication gaps cause missed briefings
Tight apron geometry at congested airports leads to proximity incidents — SITA AMS does not provide real-time apron conflict alerting; relies on manual visual clearance
APU-off compliance is monitored manually — airlines incur fuel burn penalty and noise fines if APU is left running; GroundStar task completion is self-reported, not sensor-verified
FOD checks are paper-based at many stations — GroundStar task completion does not integrate with airside safety management system, preventing automated audit trail

Inputs / Outputs

Primary InputInbound OOOI messages and updated ETA from ACARS
Primary OutputAircraft pushed back to runway heading; engine start sequence complete; pushback crew clear
PreviousGO-04 · Gate Management & AssignmentNextGO-06 · Ground Handling Vendor Management