MR-14 BPMN diagram
📋

L4 Process Steps

StepStep NameRole / Swim LaneSystem InputOutputKPIDec?Exc?
Phase 1
1.1
Extract historical MRO spend from SAP S/4HANA MRO Finance Controller SAP S/4HANA Finance (FI/CO) Prior-year actuals, cost centre hierarchy, work order history 3-year MRO spend baseline by category (line, heavy, components, engines) Baseline accuracy ≥98% vs audited actuals N N
1.2 Validate cost centre structure for MRO domains MRO Finance Controller SAP S/4HANA Finance (FI/CO) Chart of accounts, maintenance cost centre master data Validated cost centre tree mapped to AMOS task-card categories 100% of AMOS work order types mapped to SAP cost centre before budget lock N Y
1.3 Set annual MRO budget targets by category VP Engineering & Maintenance SAP S/4HANA Finance (FI/CO) Baseline spend, fleet plan, planned utilisation hours, escalation indices Approved annual MRO budget with monthly phasing per cost centre Budget submission on time (T-60 days before fiscal year start) Y N
Phase 2
2.1
Record labour and material costs to work orders Maintenance Planner AMOS by Swiss AviationSoftware Signed-off task cards, parts consumption records, technician time sheets Costed work orders with labour hours, part numbers, and unit prices Work order cost closure within 48 hours of task completion; <2% late-closure rate N Y
2.2 Allocate vendor costs to work orders via SAP Ariba MRO Procurement Analyst SAP Ariba PO line items for outsourced maintenance, AMOS work order references Work orders with vendor cost allocations and PO cross-references 100% of vendor POs linked to a work order before invoice approval N Y
2.3 Validate work order cost allocation completeness MRO Finance Controller AMOS by Swiss AviationSoftware Open and closed work orders for the reporting period Allocation validation report; unallocated cost exception list ≤1% of period spend unallocated at month-end close Y N
Phase 3
3.1
Receive and register vendor invoices in SAP Ariba Accounts Payable Specialist SAP Ariba Vendor invoice (PDF/EDI), purchase order number, goods receipt note Registered invoice with PO and GRN cross-references in SAP Ariba Invoice registration within 24 hours of receipt; e-invoice adoption ≥70% of MRO vendors N N
3.2 Execute 3-way match: PO vs GRN vs invoice Accounts Payable Specialist SAP S/4HANA Finance (FI/CO) Registered invoice, SAP Ariba PO, AMOS goods receipt note 3-way match result: matched, price variance, or quantity variance First-pass 3-way match success rate ≥85%; invoice cycle time ≤10 days N Y
3.3 Validate invoice scope against approved work order MRO Contract Manager AMOS by Swiss AviationSoftware 3-way match result, approved work scope from AMOS work order Invoice approval decision: approved, disputed, or escalated Invoice dispute rate ≤5% of total MRO invoices per month Y Y
3.4 Post approved vendor invoices in SAP AP Accounts Payable Specialist SAP S/4HANA Finance (FI/CO) Approved invoice from MRO Contract Manager Posted AP document; payment scheduled per vendor payment terms On-time payment rate ≥95%; early payment discount capture ≥80% where applicable N N
Phase 4
4.1
Extract cost and utilisation data for KPI calculation MRO Data Analyst AWS S3 / Redshift AMOS work order actuals, SAP cost postings, flight operations utilisation data Consolidated MRO cost and utilisation dataset in Redshift analytics schema Data pipeline refresh completed by Day 3 of month following reporting period N Y
4.2 Calculate CPFH, cost-per-cycle and maintenance cost ratio MRO Data Analyst AWS S3 / Redshift Consolidated cost dataset, fleet utilisation hours and cycles from Jeppesen FliteDeck KPI scorecard: CPFH by fleet type, CPD, maintenance cost as % of total operating cost CPFH variance vs budget ≤±5%; maintenance cost ratio ≤15% of total operating cost N N
4.3 Publish KPI dashboard to Power BI for stakeholders MRO Data Analyst Power BI KPI scorecard dataset from Redshift Published Power BI dashboard with trend lines, budget vs actual, and drill-through by vendor Dashboard published by Day 5 of the following month; stakeholder satisfaction score ≥4/5 N N
4.4 Review KPIs against thresholds and alert on breaches Director of MRO Power BI Published KPI dashboard, approved threshold parameters KPI status: Green / Amber / Red per metric; variance alert issued for Amber/Red items All Red-threshold KPIs reviewed and actioned within 5 business days Y N
Phase 5
5.1
Conduct root-cause analysis for cost overruns MRO Finance Controller AMOS by Swiss AviationSoftware Variance alert, work order drill-through from Power BI, vendor invoice details Root-cause analysis report identifying driver of overrun (scope, price, volume, mix) Root-cause report issued within 10 business days of period close Y N
5.2 Issue corrective action plan and assign owners Director of MRO SAP S/4HANA Finance (FI/CO) Root-cause analysis report, budget variance magnitude Corrective action plan (CAP) with owner, action, and target completion date CAP issued within 5 business days of root-cause sign-off; ≥80% of CAP actions closed on time N N
5.3 Update rolling MRO cost forecast in SAP CO MRO Finance Controller SAP S/4HANA Finance (FI/CO) Approved CAP, revised cost assumptions, updated utilisation forecast from Amadeus SkyWORKS Revised rolling 12-month MRO cost forecast posted in SAP Controlling Forecast accuracy (latest estimate vs actual at year-end) ≤±3% N Y
Phase 6
6.1
Prepare monthly MRO cost report for leadership MRO Finance Controller Power BI Finalised KPI dashboard, CAP status, forecast update Executive MRO Cost Report (PDF): actuals, budget variance, CPFH trend, top 5 vendor spend Report distributed by Day 7 of following month to CFO, VP Engineering, and CEO N N
📋

Process Attributes

Identification

Process IDMR-14
L1 DomainMaintenance, Repair & Overhaul
L2 ProcessMRO Vendor Management
L3 NameMaintenance Cost Control & KPI Reporting
L4 Steps18 across 6 phases
Decision Gates5 (all with iteration loops)
Exceptions7 documented

Swim Lanes (Roles)

MRO Finance Controller
VP Engineering & Maintenance
Maintenance Planner
MRO Procurement Analyst
Accounts Payable Specialist
MRO Contract Manager
MRO Data Analyst
Director of MRO

Systems & Tools

SAP S/4HANA Finance (FI/CO)AMOS by Swiss AviationSoftwareSAP AribaAWS S3 / RedshiftPower BI

Key Performance Indicators

Extract historical MRO spend from SAP S/4HANABaseline accuracy ≥98% vs audited actuals
Validate cost centre structure for MRO domains100% of AMOS work order types mapped to SAP cost centre before budget lock
Set annual MRO budget targets by categoryBudget submission on time (T-60 days before fiscal year start)
Record labour and material costs to work ordersWork order cost closure within 48 hours of task completion; <2% late-closure rate
Allocate vendor costs to work orders via SAP Ariba100% of vendor POs linked to a work order before invoice approval
Validate work order cost allocation completeness≤1% of period spend unallocated at month-end close
Receive and register vendor invoices in SAP AribaInvoice registration within 24 hours of receipt; e-invoice adoption ≥70% of MRO vendors
Execute 3-way match: PO vs GRN vs invoiceFirst-pass 3-way match success rate ≥85%; invoice cycle time ≤10 days

Airline-Specific Risks & Pain Points

AMOS work order costs and SAP cost centres may not be fully reconciled if interface mappings were altered during AMOS upgrades, producing baseline gaps
New regulatory requirements (EASA Part-145, FAR Part 145) occasionally introduce new work-scope categories with no corresponding SAP cost centre, delaying budget submission
Fleet utilisation assumptions from Amadeus SkyWORKS schedule plan may diverge from finance model, requiring manual reconciliation loop between Planning and Engineering
Technician time entries in AMOS depend on line-station connectivity; remote outstations with poor VPN links accumulate backlog of uncosted work orders, distorting weekly cost reports
Ad-hoc AOG purchases placed verbally and backed by emergency POs are frequently missing work order references, requiring retrospective allocation that delays month-end close by 3–5 days
AMOS does not enforce mandatory cost-centre fields on all work order types; engineering change orders may slip through without allocation flags

Inputs / Outputs

Primary InputPrior-year actuals, cost centre hierarchy, work order history
Primary OutputExecutive MRO Cost Report (PDF): actuals, budget variance, CPFH trend, top 5 vendor spend
PreviousMR-13 · Quality Assurance & Safety Audits (CAMO)NextMR-15 · Warranty Claim Management