Process Flow Diagram (BPMN)

NP-SP-06 BPMN diagram
📋

L4 Process Steps

StepStep NameRole / Swim LaneSystem InputOutputKPIDec?Exc?
Phase 1
1.1
Capture schedule change request in SkyWORKS Schedule Planning Analyst Amadeus SkyWORKS Change trigger: demand signal, slot relinquishment, aircraft swap, regulatory requirement, or commercial request Change request record with originating source, affected flights, and proposed effective date Request logged within 2 hours of trigger receipt N N
1.2 Classify change type, scope, and urgency Schedule Planning Manager Amadeus SkyWORKS Change request record Classification: seasonal adjustment, IRROP-driven, equipment swap, slot relinquishment, or capacity change; urgency tier (P1/P2/P3) Classification completed within 4 hours of request capture N N
1.3 Confirm route licence and fleet authority Schedule Planning Analyst Amadeus SkyWORKS Change classification, proposed route/frequency Go/No-Go on initial feasibility: route DOT-licensed, aircraft type authorised for airport pair, bilateral traffic rights confirmed Feasibility gate cleared within 1 business day; 100% of changes with regulatory exposure escalated before modelling Y Y
Phase 2
2.1
Simulate O&D demand for proposed schedule Demand Forecasting Analyst Amadeus SkyCAST Proposed flight itinerary changes, historical booking curves, competitive schedule data from OAG Schedule Analyser Projected O&D demand, expected load factor, and unconstrained demand estimate for affected markets Forecast MAPE ≤8% on 90-day horizon; load factor projection ≥83% for change to proceed N N
2.2 Model network-wide ripple effects in SkySYM Network Simulation Analyst Amadeus SkySYM Proposed schedule delta, current published schedule, connecting flow data Connecting passenger impact report, minimum connect time (MCT) violations, spill/recapture estimates for disrupted flows Zero MCT violations in output schedule; connecting flow spill ≤2% of total affected O&D N N
2.3 Run fleet assignment optimisation to resolve conflicts Fleet Assignment Analyst Amadeus SkyMAX Network simulation output, available fleet positions, maintenance reservation blocks Revised fleet assignment plan resolving aircraft-type conflicts; identified tail-swap or substitution options Fleet conflict resolution rate ≥95% within 24 hours; gauge utilisation variance ≤5% vs. baseline plan N Y
2.4 Gate: validate change against network thresholds Schedule Planning Manager Amadeus SkySYM Demand simulation, ripple effect report, fleet assignment plan Approval to proceed to slot/infrastructure assessment, or rejection with required redesign Gate review completed within 1 business day; ≥90% of changes pass gate on first submission Y N
Phase 3
3.1
Check slot availability and filing deadlines Slot Coordination Specialist IATA CRS (Coordinated Reservation System) Proposed departure/arrival times, airport coordination level (L1/L2/L3), current season's slot holdings Slot availability confirmation or conflict flag; applicable SCR/ACR filing deadline 100% of slot change requests filed before IATA deadline; slot return compliance rate ≥98% N N
3.2 Validate gate and terminal capacity at affected airports Airport Operations Coordinator SITA Airport Management System (AMS) Proposed schedule change, airport gate inventory, aircraft type (narrowbody vs. widebody) Gate assignment confirmation or conflict flag; ground time adequacy assessment Gate conflict resolution within 48 hours of identification; turnaround time ≥25 min protected for all affected rotations N Y
3.3 Gate: confirm slot and infrastructure availability Schedule Planning Manager IATA CRS (Coordinated Reservation System) Slot confirmation or conflict report, gate capacity assessment Infrastructure green-light or escalation to airport/slot coordinator for resolution Slot and gate confirmation within 5 business days of change initiation; escalation resolved within 10 business days Y Y
Phase 4
4.1
Model revenue and displacement impact in Amadeus NRM Revenue Management Analyst Amadeus Revenue Management (NRM) Approved schedule delta, current booking state for affected flights, O&D demand forecasts Revenue impact projection: incremental revenue, displacement cost, net contribution vs. status quo Net revenue impact calculated within 2 business days; minimum threshold: net contribution change ≥ -$25K per changed rotation N N
4.2 Assess fare structure and pricing impact via ATPCO Pricing Analyst ATPCO Revenue impact projection, current fare rules for affected markets, competitive pricing benchmarks Fare rule amendment requirements; identification of fares requiring re-filing if schedule change breaches permitted connections or routing rules 100% of fares requiring re-filing identified before SSIM submission; fare amendment cycle ≤48 hours N Y
4.3 Gate: commercial approval of net revenue impact VP Network Planning Amadeus Revenue Management (NRM) Revenue impact projection, fare amendment requirements, infrastructure cost estimates Executive approval to proceed to filing, or directive to redesign change to improve commercial outcome Commercial gate decision within 2 business days; ≤15% of changes recycled at this gate Y N
Phase 5
5.1
Update master schedule and generate SSIM file Schedule Planning Analyst Amadeus SkyWORKS Approved schedule change, fleet assignment plan, effective date range Updated published schedule in SkyWORKS; SSIM Chapter 7 message file for distribution SSIM generated within 4 hours of commercial approval; zero data integrity errors in SSIM validation report N N
5.2 Submit SSIM to GDS channels and NDC API Gateway Distribution Operations Analyst Sabre GDS SSIM Chapter 7 file, NDC schedule change notification payload Schedule update acknowledgement from Sabre GDS, Travelport GDS, Amadeus GDS, and NDC API Gateway; error report for failed segments GDS schedule propagation within 24 hours of SSIM submission; NDC channel update within 4 hours; zero unacknowledged submissions N Y
5.3 Gate: validate schedule accuracy across all channels Distribution Operations Analyst OAG Schedule Analyser Live GDS schedule data, published SkyWORKS schedule, NDC content feed Channel accuracy report; confirmed schedule match or list of discrepancies requiring re-submission Schedule accuracy ≥99.5% across all channels within 48 hours of submission; zero flight-level discrepancies in departure time or equipment type Y N
Phase 6
6.1
Trigger involuntary change notifications via Altéa PSS Customer Experience Operations Specialist Amadeus Altéa PSS Confirmed schedule change, affected PNR list, change type (significant vs. minor per DOT thresholds) Passenger notification emails/SMS sent; re-accommodation offers generated for significantly affected itineraries (>90 min departure change) 100% of affected passengers notified within 24 hours of schedule change publication; DOT significant change threshold compliance rate 100% N Y
6.2 Process re-accommodation requests and fee waivers Customer Experience Operations Specialist Amadeus Altéa PSS Passenger rebooking requests, waiver policy (significant change = full flexibility), alternative flight inventory Rebooked PNRs; refund transactions for passengers who opt out; waiver codes applied Re-accommodation rate ≥92% on same-day alternatives; average re-booking handle time ≤8 minutes; refund processing within DOT 7-day credit card window N Y
6.3 Monitor post-implementation KPIs and close change record Schedule Planning Analyst Tableau / AWS Redshift Live booking data (Altéa), load factor actuals, OTP data, re-accommodation completion rate Post-implementation review report; change record closed in SkyWORKS with outcome classification (successful / modified / reversed) Load factor on changed flights ≥83% within 30 days; OTP ≥78% D0; re-accommodation completion rate ≥98% within 72 hours of notification N N
📋

Process Attributes

Identification

Process IDNP-SP-06
L1 DomainNetwork Planning & Scheduling
L2 ProcessSchedule Planning
L3 NameSchedule Change Management
L4 Steps19 across 6 phases
Decision Gates5 (all with iteration loops)
Exceptions8 documented

Swim Lanes (Roles)

Schedule Planning Analyst
Schedule Planning Manager
Demand Forecasting Analyst
Network Simulation Analyst
Fleet Assignment Analyst
Slot Coordination Specialist
Airport Operations Coordinator
Revenue Management Analyst
Pricing Analyst
VP Network Planning
Distribution Operations Analyst
Customer Experience Operations Specialist

Systems & Tools

Amadeus SkyWORKSAmadeus SkyCASTAmadeus SkySYMAmadeus SkyMAXIATA CRS (Coordinated Reservation System)SITA Airport Management System (AMS)Amadeus Revenue Management (NRM)ATPCOSabre GDSOAG Schedule AnalyserAmadeus Altéa PSSTableau / AWS Redshift

Key Performance Indicators

Capture schedule change request in SkyWORKSRequest logged within 2 hours of trigger receipt
Classify change type, scope, and urgencyClassification completed within 4 hours of request capture
Confirm route licence and fleet authorityFeasibility gate cleared within 1 business day; 100% of changes with regulatory exposure escalated before modelling
Simulate O&D demand for proposed scheduleForecast MAPE ≤8% on 90-day horizon; load factor projection ≥83% for change to proceed
Model network-wide ripple effects in SkySYMZero MCT violations in output schedule; connecting flow spill ≤2% of total affected O&D
Run fleet assignment optimisation to resolve conflictsFleet conflict resolution rate ≥95% within 24 hours; gauge utilisation variance ≤5% vs. baseline plan
Gate: validate change against network thresholdsGate review completed within 1 business day; ≥90% of changes pass gate on first submission
Check slot availability and filing deadlines100% of slot change requests filed before IATA deadline; slot return compliance rate ≥98%

Airline-Specific Risks & Pain Points

Change requests arrive via email, Slack, and verbal channels with no single intake system — risk of duplicate or conflicting change records in SkyWORKS
Seasonal vs. irregular-operations changes require different downstream workflows; mis-classification delays IATA slot filing deadlines (SCR/ACR windows)
International route authority changes require DOT/foreign CAA coordination with 30–90 day lead times — late identification blocks schedule publication
SkyCAST demand models are calibrated on historical actuals — new or thin markets with <12 months of data produce unreliable forecasts, requiring manual analyst override
SkySYM scenario runs can take 45–90 minutes for full network simulation — time pressure during irregular operations compresses analysis window and increases error risk
Fleet-constrained periods (peak summer, MAX grounding scenarios) leave SkyMAX with limited substitution options — manual intervention required and risks cascading reassignments

Inputs / Outputs

Primary InputChange trigger: demand signal, slot relinquishment, aircraft swap, regulatory requirement, or commercial request
Primary OutputPost-implementation review report; change record closed in SkyWORKS with outcome classification (successful / modified / reversed)