Process Flow Diagram (BPMN)

NP-SP-07 BPMN diagram
📋

L4 Process Steps

StepStep NameRole / Swim LaneSystem InputOutputKPIDec?Exc?
Phase 1
1.1
Extract historical O&D traffic data Network Planning Analyst Amadeus SkyCAST Planning cycle trigger; 24-month O&D booking history Baseline O&D traffic dataset by market and quarter Data completeness ≥98% of active markets N N
1.2 Run demand forecast for planning horizon Demand Forecasting Analyst Amadeus SkyCAST Historical O&D dataset; macro-economic indices; event calendar 12-month segment-level demand forecast by frequency band Forecast MAPE ≤8% at 90-day horizon N N
1.3 Validate forecast variance against prior cycle Network Planning Analyst Amadeus SkyCAST Current forecast; prior planning cycle forecast Variance report flagging markets with >5% deviation Forecast variance report produced within 2 business days of data extraction Y N
1.4 Identify routes requiring capacity uplift Network Planning Analyst Amadeus SkySYM Validated demand forecast; current schedule frequencies Prioritised list of routes with capacity gap ≥10 seats/day average Capacity gap identification covering 100% of markets with forecast load factor ≥85% N N
Phase 2
2.1
Run initial fleet assignment optimisation Fleet Assignment Analyst Amadeus SkyMAX Capacity gap list; available fleet inventory by subfleet Draft fleet assignment plan with gauge per rotation Fleet utilisation ≥13.5 block hours/aircraft/day across active rotations N N
2.2 Detect constraint violations in fleet plan Fleet Assignment Analyst Amadeus SkyMAX Draft fleet assignment plan Constraint violation report (turn-time, gauge, balance) Zero hard constraint violations (MTOW, turn-time) in approved plan Y Y
2.3 Adjust gauge on constrained rotations Fleet Assignment Analyst Amadeus SkyWORKS Constraint violation report; alternate fleet availability Revised gauge assignments with documented trade-off notes All gauge adjustments resolved and re-optimised within 3 business days N N
2.4 Validate tail-count balance across network Network Operations Analyst Amadeus SkyMAX Revised fleet assignment plan; overnight parking constraints by station Balanced fleet assignment confirming overnight positions by station Overnight positioning plan with zero unresolved imbalances before SSIM submission N Y
Phase 3
3.1
Assess slot and gate availability constraints Slot Coordination Analyst IATA CRS (Coordinated Reservation System) Validated fleet assignment plan; airport coordination level classifications Slot availability matrix for Level 2/3 airports 100% of Level 3 coordinated airports reviewed before SSIM submission Y Y
3.2 Review maintenance capacity windows Line Maintenance Planner AMOS by Swiss AviationSoftware Fleet assignment plan; upcoming A/C-check and C-check schedules Maintenance conflict report showing aircraft unavailability periods Zero unplanned maintenance conflicts in 90-day rolling capacity plan N Y
3.3 Validate crew availability against planned capacity Crew Planning Analyst Jeppesen Crew Management Validated fleet assignment plan; crew headcount and qualification data Crew coverage report by base and crew position Crew coverage ratio ≥105% (buffer above minimum legal complement) Y Y
3.4 Resolve crew or slot deficits via capacity swap Network Planner Amadeus SkyWORKS Crew coverage report; slot availability matrix; maintenance conflict report Revised capacity plan with documented frequency or gauge reductions All crew and slot deficits resolved before SSIM filing deadline N N
Phase 4
4.1
Generate SSIM schedule file for submission Schedule Planning Analyst Amadeus SkyWORKS Approved capacity plan; airline designator codes and flight number series SSIM Chapter 7 formatted schedule file SSIM file generated within 1 business day of capacity plan sign-off N N
4.2 Validate SSIM file against IATA standards Schedule Coordinator OAG Schedule Analyser SSIM Chapter 7 file Validation report; corrected SSIM file if errors found Zero critical SSIM errors at point of GDS submission Y Y
4.3 Submit validated schedule to GDS and NDC channels Distribution Analyst Amadeus GDS / Sabre GDS / NDC API Gateway Validated SSIM file Schedule live in Amadeus, Sabre, Travelport, and NDC channel Schedule available in all GDS channels within 4 hours of SSIM submission; NDC availability within 2 hours N Y
Phase 5
5.1
Monitor in-period seat utilization vs forecast Revenue Management Analyst Amadeus Revenue Management (NRM / AltéaRM) Live booking data; capacity plan baseline Weekly utilization dashboard by market and departure date System load factor ≥83% on average across active network; individual market load factor reviewed weekly Y N
5.2 Trigger capacity reoptimisation for underperforming routes Network Planning Analyst Amadeus SkyCAST Utilization dashboard; routes with load factor <78% within 60 days of departure Reoptimisation recommendation: frequency reduction, gauge swap, or fare stimulus Reoptimisation recommendation issued within 48 hours of load factor breach trigger N Y
5.3 Log final utilization KPIs and close planning cycle Network Planning Analyst Tableau / AWS Redshift Post-departure load factor actuals; forecast baseline Post-cycle capacity utilization report with variance analysis Post-cycle report published within 5 business days of season end; forecast vs actual load factor variance documented for model calibration N N
📋

Process Attributes

Identification

Process IDNP-SP-07
L1 DomainNetwork Planning & Scheduling
L2 ProcessSchedule Planning
L3 NameCapacity Planning & Utilization
L4 Steps18 across 5 phases
Decision Gates6 (all with iteration loops)
Exceptions8 documented

Swim Lanes (Roles)

Network Planning Analyst
Demand Forecasting Analyst
Fleet Assignment Analyst
Network Operations Analyst
Slot Coordination Analyst
Line Maintenance Planner
Crew Planning Analyst
Network Planner
Schedule Planning Analyst
Schedule Coordinator
Distribution Analyst
Revenue Management Analyst

Systems & Tools

Amadeus SkyCASTAmadeus SkySYMAmadeus SkyMAXAmadeus SkyWORKSIATA CRS (Coordinated Reservation System)AMOS by Swiss AviationSoftwareJeppesen Crew ManagementOAG Schedule AnalyserAmadeus GDS / Sabre GDS / NDC API GatewayAmadeus Revenue Management (NRM / AltéaRM)Tableau / AWS Redshift

Key Performance Indicators

Extract historical O&D traffic dataData completeness ≥98% of active markets
Run demand forecast for planning horizonForecast MAPE ≤8% at 90-day horizon
Validate forecast variance against prior cycleForecast variance report produced within 2 business days of data extraction
Identify routes requiring capacity upliftCapacity gap identification covering 100% of markets with forecast load factor ≥85%
Run initial fleet assignment optimisationFleet utilisation ≥13.5 block hours/aircraft/day across active rotations
Detect constraint violations in fleet planZero hard constraint violations (MTOW, turn-time) in approved plan
Adjust gauge on constrained rotationsAll gauge adjustments resolved and re-optimised within 3 business days
Validate tail-count balance across networkOvernight positioning plan with zero unresolved imbalances before SSIM submission

Airline-Specific Risks & Pain Points

SkyCAST data feeds depend on Altéa PSS booking exports; delays in PSS batch jobs cause stale baseline traffic inputs, distorting forecasts for thin markets
Thin LCC markets and new routes lack sufficient booking history; SkyCAST model defaults to industry averages, understating demand elasticity for fare-sensitive leisure segments
Manual comparison between planning cycles is error-prone; no automated delta alerting in SkyCAST baseline module — analyst must export to Excel for comparison
SkySYM network simulation does not natively import SkyCAST output in real time; manual CSV handoff between tools introduces reconciliation lag of 1–2 days
SkyMAX optimiser is sensitive to input parameter sequencing; incorrect fleet availability seeding (e.g., aircraft in scheduled maintenance not flagged) generates infeasible rotations that require manual correction
SkyMAX surface-level constraint checker does not model real-time gate availability at congested airports (e.g., LHR, JFK slots); gate conflicts surface only post-filing via airport coordination

Inputs / Outputs

Primary InputPlanning cycle trigger; 24-month O&D booking history
Primary OutputPost-cycle capacity utilization report with variance analysis
PreviousNP-SP-06 · Schedule Change ManagementNextNP-SP-08 · New Market Entry Feasibility