Capacity Planning & Utilization
Network Planning & Scheduling › Schedule Planning · 18 L4 steps · 5 phases · 6 decision gates · Updated 2026-03-18 17:49
📊
Process Flow Diagram (BPMN)
📋
L4 Process Steps
| Step | Step Name | Role / Swim Lane | System | Input | Output | KPI | Dec? | Exc? |
|---|---|---|---|---|---|---|---|---|
Phase 1 1.1 |
Extract historical O&D traffic data | Network Planning Analyst | Amadeus SkyCAST | Planning cycle trigger; 24-month O&D booking history | Baseline O&D traffic dataset by market and quarter | Data completeness ≥98% of active markets | N | N |
| 1.2 | Run demand forecast for planning horizon | Demand Forecasting Analyst | Amadeus SkyCAST | Historical O&D dataset; macro-economic indices; event calendar | 12-month segment-level demand forecast by frequency band | Forecast MAPE ≤8% at 90-day horizon | N | N |
| 1.3 | Validate forecast variance against prior cycle | Network Planning Analyst | Amadeus SkyCAST | Current forecast; prior planning cycle forecast | Variance report flagging markets with >5% deviation | Forecast variance report produced within 2 business days of data extraction | Y | N |
| 1.4 | Identify routes requiring capacity uplift | Network Planning Analyst | Amadeus SkySYM | Validated demand forecast; current schedule frequencies | Prioritised list of routes with capacity gap ≥10 seats/day average | Capacity gap identification covering 100% of markets with forecast load factor ≥85% | N | N |
Phase 2 2.1 |
Run initial fleet assignment optimisation | Fleet Assignment Analyst | Amadeus SkyMAX | Capacity gap list; available fleet inventory by subfleet | Draft fleet assignment plan with gauge per rotation | Fleet utilisation ≥13.5 block hours/aircraft/day across active rotations | N | N |
| 2.2 | Detect constraint violations in fleet plan | Fleet Assignment Analyst | Amadeus SkyMAX | Draft fleet assignment plan | Constraint violation report (turn-time, gauge, balance) | Zero hard constraint violations (MTOW, turn-time) in approved plan | Y | Y |
| 2.3 | Adjust gauge on constrained rotations | Fleet Assignment Analyst | Amadeus SkyWORKS | Constraint violation report; alternate fleet availability | Revised gauge assignments with documented trade-off notes | All gauge adjustments resolved and re-optimised within 3 business days | N | N |
| 2.4 | Validate tail-count balance across network | Network Operations Analyst | Amadeus SkyMAX | Revised fleet assignment plan; overnight parking constraints by station | Balanced fleet assignment confirming overnight positions by station | Overnight positioning plan with zero unresolved imbalances before SSIM submission | N | Y |
Phase 3 3.1 |
Assess slot and gate availability constraints | Slot Coordination Analyst | IATA CRS (Coordinated Reservation System) | Validated fleet assignment plan; airport coordination level classifications | Slot availability matrix for Level 2/3 airports | 100% of Level 3 coordinated airports reviewed before SSIM submission | Y | Y |
| 3.2 | Review maintenance capacity windows | Line Maintenance Planner | AMOS by Swiss AviationSoftware | Fleet assignment plan; upcoming A/C-check and C-check schedules | Maintenance conflict report showing aircraft unavailability periods | Zero unplanned maintenance conflicts in 90-day rolling capacity plan | N | Y |
| 3.3 | Validate crew availability against planned capacity | Crew Planning Analyst | Jeppesen Crew Management | Validated fleet assignment plan; crew headcount and qualification data | Crew coverage report by base and crew position | Crew coverage ratio ≥105% (buffer above minimum legal complement) | Y | Y |
| 3.4 | Resolve crew or slot deficits via capacity swap | Network Planner | Amadeus SkyWORKS | Crew coverage report; slot availability matrix; maintenance conflict report | Revised capacity plan with documented frequency or gauge reductions | All crew and slot deficits resolved before SSIM filing deadline | N | N |
Phase 4 4.1 |
Generate SSIM schedule file for submission | Schedule Planning Analyst | Amadeus SkyWORKS | Approved capacity plan; airline designator codes and flight number series | SSIM Chapter 7 formatted schedule file | SSIM file generated within 1 business day of capacity plan sign-off | N | N |
| 4.2 | Validate SSIM file against IATA standards | Schedule Coordinator | OAG Schedule Analyser | SSIM Chapter 7 file | Validation report; corrected SSIM file if errors found | Zero critical SSIM errors at point of GDS submission | Y | Y |
| 4.3 | Submit validated schedule to GDS and NDC channels | Distribution Analyst | Amadeus GDS / Sabre GDS / NDC API Gateway | Validated SSIM file | Schedule live in Amadeus, Sabre, Travelport, and NDC channel | Schedule available in all GDS channels within 4 hours of SSIM submission; NDC availability within 2 hours | N | Y |
Phase 5 5.1 |
Monitor in-period seat utilization vs forecast | Revenue Management Analyst | Amadeus Revenue Management (NRM / AltéaRM) | Live booking data; capacity plan baseline | Weekly utilization dashboard by market and departure date | System load factor ≥83% on average across active network; individual market load factor reviewed weekly | Y | N |
| 5.2 | Trigger capacity reoptimisation for underperforming routes | Network Planning Analyst | Amadeus SkyCAST | Utilization dashboard; routes with load factor <78% within 60 days of departure | Reoptimisation recommendation: frequency reduction, gauge swap, or fare stimulus | Reoptimisation recommendation issued within 48 hours of load factor breach trigger | N | Y |
| 5.3 | Log final utilization KPIs and close planning cycle | Network Planning Analyst | Tableau / AWS Redshift | Post-departure load factor actuals; forecast baseline | Post-cycle capacity utilization report with variance analysis | Post-cycle report published within 5 business days of season end; forecast vs actual load factor variance documented for model calibration | N | N |
📋