v1.0
Home Network Planning & Scheduling ⭐ GitHub
📊

Process Flow Diagram (BPMN)

NP-SP-11 BPMN diagram
📋

L4 Process Steps

StepStep NameRole / Swim LaneSystem InputOutputKPIDec?Exc?
Phase 1
1.1
Initiate seasonal schedule freeze in SkyWORKS Schedule Planning Manager Amadeus SkyWORKS Board-approved seasonal schedule (IATA season S26/W26) Frozen schedule record with freeze timestamp and version lock Schedule frozen ≥330 days before season start per IATA standard N N
1.2 Validate schedule against airport slot constraints Slot Coordination Analyst IATA CRS (Coordinated Reservation System) Frozen schedule from SkyWORKS, IATA slot declarations for coordinated airports Slot validation report with conflict flag per airport 100% slot compliance achieved before SSIM generation; zero unresolved conflicts at freeze Y Y
1.3 Resolve slot conflicts and revalidate schedule Slot Coordination Analyst Amadeus SkyWORKS Slot validation report listing conflicting departure/arrival windows Revised schedule with adjusted slot times, resubmitted to IATA CRS Slot conflict resolution within 5 business days of detection N Y
Phase 2
2.1
Generate SSIM Chapter 7 file from frozen schedule Schedule Data Analyst Amadeus SkyWORKS Validated, slot-compliant frozen schedule SSIM Chapter 7 flat file (.ssim) containing all flight records for the season SSIM generated within 2 hours of freeze confirmation; file size validated within expected range N N
2.2 Validate SSIM file against IATA format standards Schedule Data Analyst OAG Schedule Analyser Generated SSIM Chapter 7 file SSIM validation report detailing field-level errors, warnings, and record counts Zero format errors before transmission; validation run completed in <30 minutes Y Y
2.3 Correct SSIM errors and regenerate file Schedule Data Analyst Amadeus SkyWORKS SSIM validation error report with specific record and field references Corrected SSIM file ready for re-validation Correction and regeneration cycle completed in ≤4 hours per iteration N Y
Phase 3
3.1
Submit validated SSIM to OAG for GDS distribution Distribution Coordinator OAG Schedule Analyser Validated SSIM Chapter 7 file with zero format errors OAG submission confirmation with distribution ticket ID and estimated processing completion time SSIM submitted to OAG ≥12 months before season start for initial seasonal load; re-submissions within 4 hours of correction sign-off N N
3.2 Monitor Sabre GDS schedule ingestion and loading Distribution Coordinator Sabre GDS OAG distribution confirmation, Sabre loading status feed Sabre loading confirmation report; discrepancy log if mismatches detected Sabre schedule parity ≥99.5% within 72 hours of SSIM submission Y Y
3.3 Monitor Travelport GDS schedule ingestion and loading Distribution Coordinator Travelport GDS OAG distribution confirmation, Travelport Apollo/Galileo loading status Travelport loading confirmation report across Apollo and Galileo sub-platforms Travelport schedule parity ≥99.5% within 72 hours; Apollo/Galileo consistency 100% N Y
3.4 Monitor Amadeus GDS schedule loading across all PCCs Distribution Coordinator Amadeus GDS OAG distribution confirmation, Amadeus PCC propagation status Amadeus parity report; consolidated GDS parity sign-off across Sabre, Travelport, and Amadeus Amadeus schedule parity ≥99.5% within 72 hours; full PCC propagation confirmed within 96 hours Y Y
Phase 4
4.1
Publish schedule to NDC API Gateway for OTA partners Digital Distribution Analyst NDC API Gateway Validated SSIM, approved fare inventory from Amadeus NRM NDC offer catalog updated; API endpoint live for OTA and metasearch partners NDC schedule availability within 4 hours of SSIM freeze confirmation; API offer response latency <200ms at P99 N Y
4.2 Update airline.com booking engine via Altéa PSS Digital Distribution Analyst Amadeus Altéa PSS Published SSIM, live fare inventory, NDC offer catalog Live schedule displayed in airline.com booking flow with correct availability and pricing Direct channel schedule accuracy 100%; booking engine page response time <3 seconds; availability parity with GDS within 1 hour of schedule publication Y Y
Phase 5
5.1
Execute cross-channel schedule parity audit Revenue Integrity Analyst OAG Schedule Analyser Published schedules from Sabre GDS, Travelport GDS, Amadeus GDS, NDC API, and airline.com; master SSIM as reference Cross-channel parity audit report with discrepancy log (flight number, date, affected channel, nature of mismatch) Cross-channel schedule parity ≥99.8% within 5 business days of initial load; audit covering 100% of new and changed flights Y Y
5.2 Issue SSIM delta file and re-submit for channel correction Schedule Data Analyst Amadeus SkyWORKS Parity audit discrepancy log with channel-specific mismatch details SSIM delta file (update and cancel records) re-submitted to OAG; correction tracking ticket raised per affected channel Critical corrections (cancellations, departure time changes >15 min) re-distributed within 4 hours; all corrections confirmed propagated within 48 hours N Y
5.3 Notify Revenue Management and activate NRM inventory Schedule Planning Manager Amadeus Revenue Management (NRM) Final published schedule, parity audit sign-off document NRM inventory controls activated for all new and changed flights; RM team notified with flight list and opening load factors NRM inventory activation within 24 hours of schedule publication sign-off; 100% of new routes activated before booking opening date N N
📋

Process Attributes

Identification

Process IDNP-SP-11
L1 DomainNetwork Planning & Scheduling
L2 ProcessSchedule Planning
L3 NameSchedule Publication & GDS Loading
L4 Steps15 across 5 phases
Decision Gates6 (all with iteration loops)
Exceptions11 documented

Swim Lanes (Roles)

Schedule Planning Manager
Slot Coordination Analyst
Schedule Data Analyst
Distribution Coordinator
Digital Distribution Analyst
Revenue Integrity Analyst

Systems & Tools

Amadeus SkyWORKSIATA CRS (Coordinated Reservation System)OAG Schedule AnalyserSabre GDSTravelport GDSAmadeus GDSNDC API GatewayAmadeus Altéa PSSAmadeus Revenue Management (NRM)

Key Performance Indicators

Initiate seasonal schedule freeze in SkyWORKSSchedule frozen ≥330 days before season start per IATA standard
Validate schedule against airport slot constraints100% slot compliance achieved before SSIM generation; zero unresolved conflicts at freeze
Resolve slot conflicts and revalidate scheduleSlot conflict resolution within 5 business days of detection
Generate SSIM Chapter 7 file from frozen scheduleSSIM generated within 2 hours of freeze confirmation; file size validated within expected range
Validate SSIM file against IATA format standardsZero format errors before transmission; validation run completed in <30 minutes
Correct SSIM errors and regenerate fileCorrection and regeneration cycle completed in ≤4 hours per iteration
Submit validated SSIM to OAG for GDS distributionSSIM submitted to OAG ≥12 months before season start for initial seasonal load; re-submissions within 4 hours of correction sign-off
Monitor Sabre GDS schedule ingestion and loadingSabre schedule parity ≥99.5% within 72 hours of SSIM submission

Airline-Specific Risks & Pain Points

Late commercial decisions (new routes, frequency changes) force freeze date slippage, compressing the GDS loading window and risking incomplete availability at booking opening
Slot-constrained airports (LHR, JFK, CDG, NRT) require manual bilateral negotiation; automated IATA CRS checks surface conflicts but offer no resolution path, requiring scheduler intervention
Slot swaps require bilateral agreement with competing carriers; absence of a multilateral slot exchange platform means resolution depends on ad-hoc email negotiation with slot coordinators
Complex codeshare and interline agreements require precise segment-level carrier attribution in SSIM records; errors in marketing vs. operating carrier fields cause booking failures across all GDS channels
IATA SSIM Chapter 7 format is field-position-exact; minor field-length violations or non-standard aircraft type codes cause full file rejection by GDS ingest pipelines, requiring a complete regeneration cycle
Root cause of SSIM errors often lies in upstream schedule attributes (equipment codes, operating carrier flags); manual correction risks introducing new errors without an integrated diff-check tool

Inputs / Outputs

Primary InputBoard-approved seasonal schedule (IATA season S26/W26)
Primary OutputNRM inventory controls activated for all new and changed flights; RM team notified with flight list and opening load factors