Irregular Operations Recovery Planning
Network Planning & Scheduling › Schedule Planning · 18 L4 steps · 6 phases · 9 decision gates · Updated 2026-03-18 18:02
📊
Process Flow Diagram (BPMN)
📋
L4 Process Steps
| Step | Step Name | Role / Swim Lane | System | Input | Output | KPI | Dec? | Exc? |
|---|---|---|---|---|---|---|---|---|
Phase 1 1.1 |
Ingest real-time disruption alerts from ops systems | Network Operations Controller | SITA Airport Management System (AMS) | Weather service alerts, ATC NOTAMs, aircraft technical fault reports | Unified disruption notification log with timestamp and source | Alert-to-acknowledgement time ≤5 min | N | N |
| 1.2 | Classify IROPS trigger type and severity tier | Network Operations Controller | Amadeus Airport Management | Disruption notification log, affected airport and flight list | IROPS classification (weather / ATC / technical / security / crew) and severity tier (1=local, 2=regional, 3=network-wide) | Classification accuracy ≥95%; mis-classification rate <5% | Y | N |
| 1.3 | Activate IROPS command structure and war room | VP Network Operations | Telex / SITA ACARS | Severity tier, affected station list, initial disruption scope | IROPS war room activated; stakeholder notifications sent to crew, commercial, ground ops, and customer relations leads | War room activation time ≤15 min from trigger classification | N | Y |
Phase 2 2.1 |
Model affected flight propagation in network simulator | Schedule Planning Analyst | Amadeus SkySYM | IROPS classification, affected airports, time window of disruption | Affected flight list with downstream propagation map showing knock-on cancellation risk | Network impact model run time ≤30 min; propagation accuracy ≥90% | N | N |
| 2.2 | Identify aircraft and crew positioning conflicts | Crew Planning Analyst | Jeppesen Crew Management | Affected flight list, current crew duty records, aircraft position data | Crew duty conflict report; aircraft position conflict map with stranded-asset flags | Conflict identification complete ≤20 min; coverage of 100% of affected pairings | Y | Y |
| 2.3 | Estimate disrupted passenger volume and missed connections | Revenue Management Analyst | Amadeus Revenue Management (NRM / AltéaRM) | Affected flight booking data from Altéa PSS, connection itinerary records | Disrupted passenger count by segment, missed connection tally, estimated rebooking inventory gap | Passenger impact estimate accuracy ≥85%; model run time ≤10 min | N | N |
| 2.4 | Assess slot and regulatory constraints at affected airports | Slot Coordinator | IATA CRS (Coordinated Reservation System) | Affected slot portfolio, airport coordination contacts, no-fly window data | Waiveable slot list, regulatory no-fly windows, ATC Ground Delay Program parameters | Slot waiver request accuracy ≥98%; assessment complete ≤15 min | Y | N |
Phase 3 3.1 |
Generate recovery schedule scenarios in SkyWORKS | Schedule Planning Manager | Amadeus SkyWORKS | Impact assessment outputs, available aircraft count, crew availability, slot constraints | 2–3 recovery schedule options with trade-off analysis (cost vs. OTP vs. coverage) | Scenario generation time ≤45 min; minimum 2 viable options produced | N | N |
| 3.2 | Evaluate aircraft swap and ferry flight feasibility | Fleet Planning Analyst | Amadeus SkyMAX | Aircraft availability roster, maintenance status from AMOS, ferry routing options, positioning cost estimates | Approved ferry/swap plan or rejection rationale with cost-benefit summary | Ferry cost vs. delay cost ratio assessed within 30 min; SkyMAX fleet assignment feasibility score ≥0.85 | Y | Y |
| 3.3 | Validate crew legality for full recovery plan | Crew Planning Analyst | Jeppesen Crew Management | Proposed recovery schedule, current crew duty and rest records, reserve availability | Crew-legal recovery schedule or exception list requiring reserve activation | 100% FAR Part 117 compliance validated before plan publication; legality check ≤20 min | Y | Y |
Phase 4 4.1 |
Publish revised recovery schedule to PSS and GDS | Schedule Distribution Analyst | Amadeus SkyWORKS → Amadeus Altéa PSS → Sabre GDS / Travelport GDS | Approved, crew-legal recovery schedule | Updated schedules live in Altéa PSS, Sabre GDS, Travelport GDS, and NDC API Gateway | GDS schedule update latency ≤30 min from approval; distribution completeness 100% of active channels | N | Y |
| 4.2 | File slot waivers and coordinate ATC ground delay program | Slot Coordinator | IATA CRS + Jeppesen FliteDeck | Waiveable slot list, ATC GDP parameters, airport authority contacts | Confirmed slot waivers, revised approved departure windows per airport | Slot waiver approval rate ≥90%; ATC GDP compliance 100% | Y | N |
| 4.3 | Confirm and dispatch aircraft ferry repositioning flights | Flight Dispatcher | NAVBLUE + Jeppesen FliteDeck | Approved swap/ferry plan, ATC clearances, confirmed slot windows | Filed flight plans for ferry flights, repositioning confirmation messages to stations | Ferry flight OTP ≥75%; repositioning within ±2 hrs of recovery plan target | N | Y |
Phase 5 5.1 |
Initiate automated passenger rebooking | Customer Operations Manager | Amadeus Altéa PSS + NDC API Gateway | Disrupted passenger list, recovery flight inventory, passenger tier (FFP status) | Rebooking confirmations sent to passengers; exception queue for manual handling | Automated rebooking rate ≥70%; passenger notification delivered ≤30 min of flight cancellation | Y | Y |
| 5.2 | Activate reserve crew and complete crew reassignments | Crew Scheduling Manager | Jeppesen Crew Management | Recovery schedule, crew conflict report, reserve crew availability and location | Final crew assignments for all recovery flights; reserve activation orders issued | Reserve activation time ≤45 min; crew coverage rate ≥98% of recovery flights | Y | Y |
| 5.3 | Issue passenger care and compensation entitlements | Customer Relations Manager | Amadeus Altéa PSS | Delay/cancellation duration, disruption cause classification, passenger loyalty tier | Meal vouchers, hotel authorisations, transport allowances, and DOT/EU261 compensation notices | DOT / EU261 compensation filing accuracy ≥99%; voucher issuance within 60 min of entitlement trigger | N | Y |
Phase 6 6.1 |
Conduct post-IROPS cost and performance analysis | Finance Controller (Commercial) | SAP S/4HANA Finance (FI/CO) + AWS Redshift | Ferry fuel invoices, compensation payouts, rebooking costs, OTP and cancellation data | IROPS total cost report, OTP and cancellation deviation analysis vs. plan | Report delivered ≤72 hrs post-event; cost capture accuracy ±2% | N | N |
| 6.2 | Update IROPS recovery playbooks and SkySYM scenario library | Schedule Planning Manager | Amadeus SkySYM + Confluence | Post-event debrief findings, scenario performance data, cost report | Updated recovery playbook version; new scenario added to SkySYM IROPS library for future use | Playbook updated within 30 days of event; ≥1 new SkySYM scenario created per Tier 2+ IROPS | Y | N |
📋