US Class I Rail Process Wiki Service Design & Network Planning › Line Capacity & Route Planning
🗺 BPMN Process Flow
RR-01-05-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-01-05-02
Domain FamilyNETWORK & PLANNING
L1 DomainService Design & Network Planning
L2 Process GroupLine Capacity & Route Planning
TriggerInitiated by a Service Design / Network Planning Analyst upon receiving updated traffic forecasts or changes in network conditions.
OutcomeSuccessful completion results in an optimized line capacity plan that maximizes throughput, minimizes delays, and adheres to all relevant regulations.
SystemsUnified Plan 2020 NetControl CADx I-ETMS
Regulatory Hooks49 CFR Part 232 GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Data Collection and Analysis Service Design / Network Planning Analyst Unified Plan 2020; NetControl Traffic forecasts, historical data, network conditions Capacity analysis report Accuracy of traffic forecast (95%) Inaccurate traffic data leading to suboptimal planning N Y
1.2 Route Selection VP Network Planning & Operations Unified Plan 2020; NetControl Capacity analysis report Selected routes and capacity allocation plan Number of trains per hour on selected routes (target: 15 trains/hour) Conflicting route demands leading to congestion Y N
1.3 Regulatory Compliance Review Service Design / Network Planning Analyst Unified Plan 2020; NetControl Selected routes and capacity allocation plan Compliance report Regulatory compliance rate (100%) Non-compliance with 49 CFR Part 232 Y Y
1.4 Implementation Plan Development VP Network Planning & Operations Unified Plan 2020; NetControl Compliance report Implementation plan Plan development time (target: 3 days) Delays in implementation due to unforeseen issues N Y
1.5 Resource Allocation Service Design / Network Planning Analyst Unified Plan 2020; NetControl Implementation plan Allocated resources report Efficiency of resource utilization (target: 85%) Over-allocation or under-allocation of resources Y N
1.6 Dispatching Instructions Preparation Train Dispatcher NetControl; CADx Allocated resources report Dispatching instructions Accuracy of dispatching instructions (98%) Incorrect dispatching leading to delays N Y
1.7 Train Monitoring and Adjustment Chief Dispatcher NetControl; I-ETMS Dispatching instructions Adjusted dispatching plan Number of adjustments (target: <5 per day) Frequent adjustments causing operational inefficiencies Y N
1.8 Post-Implementation Review Service Design / Network Planning Analyst Unified Plan 2020; NetControl Adjusted dispatching plan Review report Effectiveness of implementation (target: 90% satisfaction) Unmet expectations leading to dissatisfaction Y Y
1.9 Feedback Loop Integration VP Network Planning & Operations Unified Plan 2020; NetControl Review report Updated capacity plan Integration time (target: 1 week) Delayed integration causing further inefficiencies N Y
1.10 Continuous Improvement Planning Service Design / Network Planning Analyst Unified Plan 2020; NetControl Updated capacity plan Improvement plan Number of improvements (target: >=3 per month) Lack of continuous improvement leading to stagnation Y N
1.11 Regulatory Update Review Service Design / Network Planning Analyst Unified Plan 2020; NetControl Improvement plan Updated compliance report Regulatory adherence rate (target: 100%) Non-compliance with updated regulations Y Y
1.12 Final Implementation and Monitoring Train Dispatcher NetControl; CADx Updated compliance report Final dispatching instructions Overall operational efficiency (target: 95%) Operational inefficiencies due to final adjustments N Y
📊 KPIs & Risk Register

KPIs

Accuracy of traffic forecast (95%) Number of trains per hour on selected routes (target: 15 trains/hour) Regulatory compliance rate (100%) Plan development time (target: 3 days) Efficiency of resource utilization (target: 85%) Accuracy of dispatching instructions (98%) Number of adjustments (target: <5 per day) Effectiveness of implementation (target: 90% satisfaction) Integration time (target: 1 week) Number of improvements (target: >=3 per month) Regulatory adherence rate (target: 100%) Overall operational efficiency (target: 95%)

Key Risks

Non-compliance with 49 CFR Part 232 Delays in implementation due to unforeseen issues Over-allocation or under-allocation of resources Incorrect dispatching leading to delays Frequent adjustments causing operational inefficiencies

Swim Lanes

Service Design / Network Planning Analyst · 1.1, 1.3, 1.5, 1.8, 1.10, 1.11 VP Network Planning & Operations · 1.2, 1.4, 1.9 Train Dispatcher · 1.6, 1.12 Chief Dispatcher · 1.7