🗺 BPMN Process Flow
RR-06-11-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-06-11-02
Domain FamilyOPERATIONS
L1 DomainEngineering: Track, Structures & Signals
L2 Process GroupVegetation, Drainage and Environmental Field Work
TriggerScheduled maintenance cycle or detection of issues through track geometry cars or RailAI.
OutcomeA safe, compliant, and well-maintained railway environment that minimizes risks to operations and adheres to all relevant regulations.
SystemsUmler PS Technology Wabtrax Track geometry car RailAI NetControl
Regulatory Hooks49 CFR Part 213 49 CFR Part 236, Subpart I GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Initiate Vegetation Management Plan Track Supervisor Umler Scheduled maintenance schedule, track geometry car data Vegetation management plan Number of tracks inspected per day Inadequate resources for vegetation control N Y
1.2 Assign Crews and Equipment Assistant Foreman (track) PS Technology Vegetation management plan, crew availability Crew assignment and equipment checklist Time to assign crews Equipment malfunctions N Y
1.3 Conduct Vegetation Management Track Inspector Wabtrax Crew assignment and equipment checklist Vegetation management report Area covered per day Weather conditions affecting visibility Y N
1.4 Inspect Drainage Systems Roadmaster Track geometry car Vegetation management report Drainage inspection report Number of drainage systems inspected per day Access to remote areas Y N
1.5 Review Environmental Impact Signal Maintainer RailAI Drainage inspection report Environmental impact assessment Time to review environmental impact Data interpretation challenges Y N
1.6 Update Maintenance Records Employee-in-Charge (EIC) Umler Environmental impact assessment Updated maintenance records Accuracy of maintenance records Data entry errors N Y
1.7 Report Findings to Management Chief Engineer / VP Engineering NetControl Updated maintenance records Management report Time to generate management report Communication delays N Y
1.8 Plan Corrective Actions Track Supervisor PS Technology Management report Corrective action plan Number of corrective actions identified per day Resource allocation issues Y N
1.9 Implement Corrective Actions Assistant Foreman (track) Wabtrax Corrective action plan Corrective action report Time to implement corrective actions Equipment availability N Y
1.10 Verify Corrective Actions Roadmaster Track geometry car Corrective action report Verification report Number of verifications per day Field verification challenges Y N
1.11 Update Regulatory Compliance Records Signal Maintainer Umler Verification report Regulatory compliance records Accuracy of regulatory compliance records Data entry errors N Y
1.12 Close Process Employee-in-Charge (EIC) NetControl Regulatory compliance records Process closure report Time to close process Communication delays N Y
📊 KPIs & Risk Register

KPIs

Number of tracks inspected per day Area covered per day Number of drainage systems inspected per day Time to review environmental impact Accuracy of maintenance records Time to generate management report Number of corrective actions identified per day Time to implement corrective actions Number of verifications per day Accuracy of regulatory compliance records Time to close process

Key Risks

Inadequate resources for vegetation control Equipment malfunctions Weather conditions affecting visibility Access to remote areas Data interpretation challenges Data entry errors Communication delays Resource allocation issues Equipment availability Field verification challenges

Swim Lanes

Track Supervisor · 1.1, 1.8 Assistant Foreman (track) · 1.2, 1.9 Roadmaster · 1.4, 1.10 Signal Maintainer · 1.5, 1.11 Employee-in-Charge (EIC) · 1.6, 1.12