US Class I Rail Process Wiki Terminal & Yard Operations › Yard Air, Utility and Ground Support
🗺 BPMN Process Flow
RR-03-09-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-03-09-02
Domain FamilyOPERATIONS
L1 DomainTerminal & Yard Operations
L2 Process GroupYard Air, Utility and Ground Support
TriggerArrival of a train at the Bailey Yard in North Platte, NE
OutcomeSuccessful completion of all yard air, utility, and ground support activities, with the train ready for departure and all records accurately updated.
SystemsNetControl I-ETMS Umler EHMS Wabtrax TRAIN II CHARM Interline Settlement System (ISS) wayside defect detector network
Regulatory Hooks49 CFR Part 232 GCOR
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Train Arrival Notification Yardmaster NetControl Train arrival notification from Harriman Dispatching Center (HDC) Updated train schedule in NetControl Time to update train schedule < 5 minutes Inaccurate train arrival times N N
1.2 Train Positioning Switchman/Switch Foreman I-ETMS Updated train schedule from NetControl Trains positioned in holding tracks Train positioning accuracy > 95% Incorrect track assignments N Y
1.3 Air Brake Test Car Inspector (Carman) EHMS Train schedule and train data from I-ETMS Air brake test report Defect rate < 1% Air brake failures Y Y
1.4 Utility Check Yardmaster Umler Air brake test report from EHMS Utility check report Utility availability > 98% Power outages N Y
1.5 Equipment Maintenance Mechanical Engineer Wabtrax Utility check report from Umler Maintenance log Maintenance completion rate > 90% Equipment breakdowns Y N
1.6 Train Departure Preparation Switchman/Switch Foreman I-ETMS Maintenance log from Wabtrax Departure checklist completed Departure readiness < 10 minutes Last-minute issues N Y
1.7 Train Departure Notification Yardmaster NetControl Departure checklist from I-ETMS Train departure notification to Harriman Dispatching Center (HDC) Time to notify HDC < 2 minutes Delayed notifications N N
1.8 Post-Departure Review Yardmaster TRAIN II Train departure notification from NetControl Post-departure review report Review completion rate > 95% Omissions in reviews N Y
1.9 Update Car Hire Accounting Car Inspector (Carman) CHARM Post-departure review report from TRAIN II Updated car hire records Accuracy of car hire records > 98% Incorrect record updates Y N
1.10 Update Interline Settlement System Switchman/Switch Foreman Interline Settlement System (ISS) Updated car hire records from CHARM Settlement data exchange completed Data exchange accuracy > 95% Data transmission errors N Y
1.11 Update Wayside Defect Detector Network Mechanical Engineer Wayside defect detector network Settlement data exchange from ISS Defect detection report Detection rate > 90% Missed defects Y N
1.12 Final Review and Documentation Yardmaster TRAIN II Defect detection report from wayside defect detector network Final operational report Report accuracy > 98% Incomplete reports N Y
📊 KPIs & Risk Register

KPIs

Terminal dwell under 24 hours Train speed above 20 mph Time to update train schedule < 5 minutes Train positioning accuracy > 95% Defect rate < 1% Utility availability > 98% Maintenance completion rate > 90% Departure readiness < 10 minutes Time to notify HDC < 2 minutes Review completion rate > 95% Accuracy of car hire records > 98% Data exchange accuracy > 95% Detection rate > 90% Report accuracy > 98%

Key Risks

Air brake test defect released to the road Power outages affecting utility operations Equipment breakdowns leading to delays Last-minute issues causing departure delays Omissions in post-departure reviews

Swim Lanes

Yardmaster · 1.1, 1.4, 1.7, 1.9, 1.12 Switchman/Switch Foreman · 1.2, 1.6, 1.10 Car Inspector (Carman) · 1.3, 1.9 Mechanical Engineer · 1.5, 1.11