US Class I Rail Process Wiki Crew Management › Rest, Attendance and Predictable Scheduling Programs
🗺 BPMN Process Flow
RR-04-04-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-04-04-01
Domain FamilyOPERATIONS
L1 DomainCrew Management
L2 Process GroupRest, Attendance and Predictable Scheduling Programs
TriggerWeekly Crew Management Review Meeting
OutcomeA well-rested, punctual, and scheduled crew ready for their assigned duties, ensuring safe and efficient rail operations.
SystemsPS Technology (PST) trackHOS-class HOS monitoring tools NetControl CloudMoyo Crew Management (CCM) HASTUS EHMS (Equipment Health Management System)
Regulatory Hooks49 CFR Part 232 49 CFR Part 228 Railway Labor Act (45 U.S.C. § 151 et seq.) FRA Train Crew Staffing Rule (2024)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Crew Scheduling Trainmaster PS Technology (PST) Weekly Crew Management Review Meeting Notes Scheduled Crew Manifest Crew adherence to schedule > 95% Balancing crew availability with operational needs Y N
1.2 Rest Period Verification Crew Caller / Crew Dispatcher trackHOS-class HOS monitoring tools Scheduled Crew Manifest Verified Rest Period Log Proper rest periods observed > 98% Ensuring compliance with Hours of Service (HOS) regulations Y Y
1.3 Attendance Monitoring Train Dispatcher NetControl Verified Rest Period Log Attendance Report Crew attendance rate > 97% Managing crew absences and scheduling replacements Y N
1.4 Predictable Scheduling Adjustment Superintendent (Division) CloudMoyo Crew Management (CCM) Attendance Report Adjusted Schedule Scheduling adjustments within 24 hours of report > 90% Adjusting schedules to accommodate unexpected changes Y Y
1.5 Crew Training Review Local Chairman / General Chairman (union) HASTUS Adjusted Schedule Training Needs Assessment Crew training completion rate > 95% Identifying and addressing skill gaps Y N
1.6 Equipment Health Check Locomotive Engineer EHMS (Equipment Health Management System) Training Needs Assessment Health Report Equipment readiness rate > 98% Ensuring all equipment is in good working condition Y Y
1.7 Interline Settlement Review Train Dispatcher Interline Settlement System (ISS) Health Report Settlement Agreement Settlement agreements finalized within 24 hours > 95% Coordinating with other railroads for interline operations Y N
1.8 Track Geometry Inspection Track Inspector FRA Automated Track Inspection Program Settlement Agreement Inspection Report Defect-free track sections > 97% Identifying and addressing track defects Y Y
1.9 Crew Feedback Collection Conductor AskRail Inspection Report Feedback Summary Positive feedback rate > 85% Gathering crew input for continuous improvement Y N
1.10 Crew Performance Evaluation Trainmaster PS Technology (PST) Feedback Summary Performance Report Performance evaluations completed within 7 days > 95% Evaluating crew performance and providing constructive feedback Y Y
1.11 Crew Training Update Local Chairman / General Chairman (union) HASTUS Performance Report Updated Training Plan Training updates implemented within 30 days > 95% Updating training programs based on performance feedback Y N
1.12 Final Review and Approval Superintendent (Division) CloudMoyo Crew Management (CCM) Updated Training Plan Approved Schedule Schedules approved within 48 hours > 90% Finalizing schedules with all necessary approvals Y Y
📊 KPIs & Risk Register

KPIs

Crew adherence to schedule > 95% Proper rest periods observed > 98% Crew attendance rate > 97% Scheduling adjustments within 24 hours of report > 90% Crew training completion rate > 95% Equipment readiness rate > 98% Settlement agreements finalized within 24 hours > 95% Defect-free track sections > 97% Positive feedback rate > 85% Performance evaluations completed within 7 days > 95% Training updates implemented within 30 days > 95% Schedules approved within 48 hours > 90%

Key Risks

Non-compliance with Hours of Service (HOS) regulations Equipment failure due to inadequate maintenance Settlement disputes between railroads Track defects leading to delays or accidents Crew dissatisfaction affecting performance

Swim Lanes

Trainmaster · 1.1, 1.4, 1.10, 1.12 Crew Caller / Crew Dispatcher · 1.2 Train Dispatcher · 1.3, 1.7 Superintendent (Division) · 1.4, 1.12 Local Chairman / General Chairman (union) · 1.5, 1.9, 1.11 Locomotive Engineer · 1.6 Track Inspector · 1.8