US Class I Rail Process Wiki Engineering: Track, Structures & Signals › Visual and Walking Track Inspection
🗺 BPMN Process Flow
RR-06-01-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-06-01-02
Domain FamilyOPERATIONS
L1 DomainEngineering: Track, Structures & Signals
L2 Process GroupVisual and Walking Track Inspection
TriggerScheduled maintenance window or after a derailment incident
OutcomeA comprehensive report detailing any issues found during the inspection, along with recommended corrective actions.
SystemsNetControl Wabtrax Track geometry car RailAI Umler
Regulatory Hooks49 CFR Part 213 49 CFR Part 236, Subpart I GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Plan Inspection Route Track Supervisor NetControl Maintenance schedule and track geometry data Inspection route plan Time to complete planning under 2 hours Inaccurate or outdated track geometry data N Y
1.2 Conduct Initial Visual Inspection Assistant Foreman (track) Wabtrax Inspection route plan Visual inspection report Number of visual inspections per hour Poor visibility conditions Y N
1.3 Perform Walking Inspection Roadmaster Track geometry car Visual inspection report Walking inspection report Distance walked per hour Unpredictable track conditions Y Y
1.4 Analyze Inspection Data Track Supervisor RailAI Walking inspection report Data analysis report Time to analyze data under 3 hours Inadequate AI model accuracy N Y
1.5 Identify Defects and Prioritize Repairs Assistant Foreman (track) Umler Data analysis report Defect prioritization list Number of defects identified per inspection Resource allocation constraints Y N
1.6 Report Defects to Maintenance Team Track Supervisor NetControl Defect prioritization list Maintenance work order Time to generate work orders under 1 hour Communication delays N Y
1.7 Verify Defect Corrections Roadmaster Wabtrax Maintenance work order Verification report Number of verified corrections per day Access to repair sites Y N
1.8 Update Track Geometry Data Track Supervisor Track geometry car Verification report Updated track geometry data Time to update data under 2 hours Data synchronization issues N Y
1.9 Generate Comprehensive Report Assistant Foreman (track) NetControl Updated track geometry data Comprehensive inspection report Time to generate report under 4 hours Report formatting issues N Y
1.10 Review and Approve Report Track Supervisor NetControl Comprehensive inspection report Approved inspection report Time to review report under 2 hours Insufficient oversight Y N
1.11 Archive Inspection Data Track Supervisor NetControl Approved inspection report Archived inspection data Time to archive data under 1 hour Data storage capacity issues N Y
1.12 Notify Stakeholders Track Supervisor NetControl Archived inspection data Stakeholder notification Time to notify stakeholders under 30 minutes Notification delivery failures N Y
📊 KPIs & Risk Register

KPIs

Time to complete planning under 2 hours Number of visual inspections per hour Distance walked per hour Time to analyze data under 3 hours Number of defects identified per inspection Time to generate work orders under 1 hour Number of verified corrections per day Time to update data under 2 hours Time to generate report under 4 hours Time to review report under 2 hours Time to archive data under 1 hour Time to notify stakeholders under 30 minutes

Key Risks

Inaccurate or outdated track geometry data Poor visibility conditions Unpredictable track conditions Resource allocation constraints Communication delays Access to repair sites Data synchronization issues Report formatting issues Insufficient oversight Data storage capacity issues Notification delivery failures

Swim Lanes

Track Supervisor · 1.1, 1.4, 1.6, 1.8, 1.9, 1.10, 1.11, 1.12 Assistant Foreman (track) · 1.2, 1.5, 1.7 Roadmaster · 1.3, 1.7