RR-08 RR-08-01-02 — Hazmat Acceptance, Documentation and Placarding
This process involves the acceptance, documentation, and placarding of hazardous materials (Hazmat) for transportation by a US Class I freight railroad. It ensures compliance with federal regulations and industry standards to safely transport hazmat across the network.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-08-01-02 |
|---|---|
| Domain Family | CORPORATE |
| L1 Domain | Hazardous Materials & Environmental |
| L2 Process Group | Hazmat Acceptance, Documentation and Placarding |
| Trigger | Receipt of a hazmat shipment at a terminal or yard |
| Outcome | Properly documented and placarded hazmat shipment ready for dispatch, ensuring regulatory compliance and safety |
| Systems | AskRail TRANSCAER SERTC NetControl I-ETMS Umler PS Technology (PST) EHMS Interline Settlement System (ISS) |
| Regulatory Hooks | 49 CFR Part 172 AAR Circular OT-55 49 CFR Part 232 GCOR 6.28 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Initial Hazmat Shipment Review | Hazmat Compliance Officer | AskRail | Shipment manifest and hazmat classification data | Classification report | Time to classify shipment under 1 hour | Inaccurate classification leading to rework | Y | N |
| 1.2 | Documentation Preparation | Hazmat Compliance Officer | TRANSCAER | Classification report | Hazmat documentation package | Documentation completed within 2 hours | Missing or incomplete documents causing delays | N | Y |
| 1.3 | Placarding Application Review | Car Inspector (Carman) | Umler | Hazmat documentation package | Placard application status report | Placards applied correctly on first attempt | Incorrect placarding leading to rework | Y | N |
| 1.4 | Hazmat Acceptance Decision | Train Dispatcher | NetControl | Placard application status report | Acceptance decision | Decision made within 30 minutes | Incorrect acceptance leading to safety risks | Y | Y |
| 1.5 | Hazmat Shipment Routing | Service Design / Network Planning Analyst | I-ETMS | Acceptance decision | Route plan | Optimal route selected within 1 hour | Suboptimal routing leading to delays | N | Y |
| 1.6 | Hazmat Shipment Dispatch | Train Dispatcher | Harriman Dispatching Center (HDC) | Route plan | Dispatch order | Shipment dispatched within 30 minutes of acceptance | Delayed dispatch causing customer dissatisfaction | N | Y |
| 1.7 | Hazmat Shipment Monitoring | Control Operator | Wabtrax | Dispatch order | Monitoring report | Continuous monitoring with no critical issues detected | Undetected issues leading to safety risks | Y | N |
| 1.8 | Hazmat Shipment Arrival Notification | Yardmaster | NetControl | Monitoring report | Arrival notification | Notification sent within 5 minutes of arrival | Delayed notifications causing operational disruptions | N | Y |
| 1.9 | Hazmat Shipment Unloading | Switchman/Switch Foreman | PS Technology (PST) | Arrival notification | Unloading report | Unloading completed within 2 hours of arrival | Inefficient unloading causing delays | Y | N |
| 1.10 | Hazmat Shipment Final Inspection | Car Inspector (Carman) | EHMS | Unloading report | Final inspection report | Inspection completed within 30 minutes of unloading | Undetected issues leading to safety risks | Y | Y |
| 1.11 | Hazmat Shipment Settlement | VP Network Planning & Operations | Interline Settlement System (ISS) | Final inspection report | Settlement agreement | Settlement finalized within 1 hour of inspection | Delayed settlements causing financial issues | N | Y |
| 1.12 | Hazmat Shipment Closure | Emergency Response Coordinator | TRANSCAER | Settlement agreement | Closure report | Closure completed within 30 minutes of settlement | Incomplete closure leading to regulatory issues | N | Y |
📊 KPIs & Risk Register
KPIs
Time to classify shipment under 1 hour Documentation completed within 2 hours Placards applied correctly on first attempt Decision made within 30 minutes Optimal route selected within 1 hour Shipment dispatched within 30 minutes of acceptance Continuous monitoring with no critical issues detected Notification sent within 5 minutes of arrival Unloading completed within 2 hours of arrival Inspection completed within 30 minutes of unloading Settlement finalized within 1 hour of inspection Closure completed within 30 minutes of settlement
Key Risks
Incorrect classification leading to rework Missing or incomplete documents causing delays Incorrect placarding leading to safety risks Incorrect acceptance leading to safety risks Suboptimal routing leading to delays Delayed dispatch causing customer dissatisfaction Undetected issues leading to safety risks Delayed notifications causing operational disruptions Inefficient unloading causing delays Undetected issues leading to safety risks Delayed settlements causing financial issues Incomplete closure leading to regulatory issues
Swim Lanes
Hazmat Compliance Officer · 1.1, 1.2 Car Inspector (Carman) · 1.3, 1.10 Train Dispatcher · 1.4, 1.6 Service Design / Network Planning Analyst · 1.5 Control Operator · 1.7 Yardmaster · 1.8 Switchman/Switch Foreman · 1.9 VP Network Planning & Operations · 1.11 Emergency Response Coordinator · 1.12