US Class I Rail Process Wiki Service Design & Network Planning › Network Performance Metrics & STB Weekly Performance Reporting
🗺 BPMN Process Flow
RR-01-07-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-01-07-01
Domain FamilyNETWORK & PLANNING
L1 DomainService Design & Network Planning
L2 Process GroupNetwork Performance Metrics & STB Weekly Performance Reporting
TriggerWeekly reporting cycle initiated by the Service Design / Network Planning Analyst at the beginning of each week.
OutcomeSuccessful completion produces a comprehensive report detailing network performance metrics, regulatory compliance status, and recommendations for improvement. The report is submitted to the Chairman, President and CEO, and shared with the Surface Transportation Board (STB).
SystemsNetControl I-ETMS Unified Plan 2020
Regulatory Hooks49 CFR Part 232 GCOR
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Data Collection from NetControl Service Design / Network Planning Analyst NetControl Train movement data, terminal dwell times, and speed records Collected data file Terminal dwell under 24 hours (target: 95%) Inaccurate or incomplete data from NetControl N Y
1.2 Data Integration with I-ETMS Service Design / Network Planning Analyst I-ETMS Collected data file Integrated data file Train speed above 20 mph (target: 98%) Data synchronization issues between NetControl and I-ETMS N Y
1.3 Regulatory Compliance Check Service Design / Network Planning Analyst NetControl, I-ETMS Integrated data file Compliance report Regulatory compliance (target: 100%) Non-compliance with regulatory requirements Y N
1.4 Analyze Terminal Dwell Times Service Design / Network Planning Analyst NetControl, I-ETMS Integrated data file Terminal dwell analysis report Terminal dwell under 24 hours (target: 95%) Long terminal dwell times affecting train schedules Y N
1.5 Analyze Train Speeds Service Design / Network Planning Analyst NetControl, I-ETMS Integrated data file Train speed analysis report Train speed above 20 mph (target: 98%) Slower than expected train speeds reducing overall network efficiency Y N
1.6 Generate Performance Report Service Design / Network Planning Analyst NetControl, I-ETMS Compliance report, terminal dwell analysis report, train speed analysis report Weekly performance report Report accuracy (target: 99%) Errors or omissions in the final report N Y
1.7 Review and Approve Report VP Network Planning & Operations NetControl, I-ETMS Weekly performance report Approved weekly performance report Report approval time (target: 24 hours) Delays in approving the final report Y N
1.8 Submit Report to STB Service Design / Network Planning Analyst NetControl, I-ETMS Approved weekly performance report Submitted report confirmation Report submission time (target: 48 hours) Submission errors or delays N Y
1.9 Review STB Feedback Service Design / Network Planning Analyst NetControl, I-ETMS STB feedback Feedback analysis report Feedback response time (target: 72 hours) Inadequate or unclear feedback from STB Y N
1.10 Update Network Plan Service Design / Network Planning Analyst Unified Plan 2020, NetControl Feedback analysis report Updated network plan Plan update frequency (target: monthly) Resistance to change in the network plan Y N
1.11 Implement Plan Changes Service Design / Network Planning Analyst Unified Plan 2020, NetControl Updated network plan Plan implementation status report Implementation completion time (target: 3 weeks) Challenges in implementing changes across the network Y N
1.12 Monitor Plan Effectiveness Service Design / Network Planning Analyst Unified Plan 2020, NetControl Plan implementation status report Effectiveness analysis report Plan effectiveness (target: 90%) Ineffectiveness of implemented changes Y N
📊 KPIs & Risk Register

KPIs

Terminal dwell under 24 hours (target: 95%) Train speed above 20 mph (target: 98%) Regulatory compliance (target: 100%) Report accuracy (target: 99%) Report approval time (target: 24 hours) Report submission time (target: 48 hours) Feedback response time (target: 72 hours) Plan update frequency (target: monthly) Implementation completion time (target: 3 weeks) Plan effectiveness (target: 90%)

Key Risks

Non-compliance with regulatory requirements Long terminal dwell times affecting train schedules Slower than expected train speeds reducing overall network efficiency Errors or omissions in the final report Delays in approving the final report Submission errors or delays Inadequate or unclear feedback from STB Resistance to change in the network plan Challenges in implementing changes across the network Ineffectiveness of implemented changes

Swim Lanes

Service Design / Network Planning Analyst · 1.1, 1.2, 1.3, 1.4, 1.5, 1.6 VP Network Planning & Operations · 1.7