RR-06 RR-06-07-02 — PTC Wayside Assets and Subdivision Track Data File Management
This process manages the maintenance and updating of Positive Train Control (PTC) wayside assets and subdivision track data files for a US Class I freight railroad. It ensures accurate and up-to-date information is maintained to support safe and efficient rail operations.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-06-07-02 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Engineering: Track, Structures & Signals |
| L2 Process Group | PTC Wayside Assets and Subdivision Track Data File Management |
| Trigger | Scheduled maintenance or detection of an anomaly in PTC wayside assets or track data |
| Outcome | Accurate and updated PTC wayside asset and subdivision track data files, ensuring compliance with regulatory requirements and operational safety standards. |
| Systems | NetControl I-ETMS Wabtrax PTC Back Office Server (BOS) FRA Automated Track Inspection Program (ATIP) |
| Regulatory Hooks | 49 CFR Part 236, Subpart I 49 CFR Part 1180 49 CFR Part 213 49 CFR Part 234 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Initiate Maintenance Request | Track Supervisor | NetControl | Maintenance request form | Scheduled maintenance work order | Response time within 24 hours of detection | Delays in initiating the maintenance process | Y | N |
| 1.2 | Review and Approve Maintenance Plan | Chief Engineer / VP Engineering | Umler | Scheduled maintenance work order | Approved maintenance plan | Plan approval within 48 hours of initiation | Inconsistent review times leading to delays | Y | N |
| 1.3 | Conduct Track Inspection | Track Inspector | Wabtrax, FRA Automated Track Inspection Program (ATIP) | Approved maintenance plan | Inspection report | 100% coverage of inspection areas | Inaccurate or incomplete inspections | N | Y |
| 1.4 | Review Inspection Report | Track Supervisor | NetControl | Inspection report | Defect list and repair schedule | Defect identification accuracy above 95% | Missed or overlooked defects | Y | N |
| 1.5 | Schedule Repair Work | Track Supervisor | NetControl, I-ETMS | Defect list and repair schedule | Repair work order | Repair scheduling within 24 hours of inspection report review | Overlapping or conflicting repair schedules | N | Y |
| 1.6 | Perform Repair Work | Assistant Foreman (track) | NetControl, I-ETMS | Repair work order | Completion report | On-time repair completion rate above 90% | Delays in completing repairs | N | Y |
| 1.7 | Review Repair Completion | Track Supervisor | NetControl, I-ETMS | Completion report | Acceptance or rework order | First-time acceptance rate above 85% | Frequent reworks due to incomplete repairs | Y | N |
| 1.8 | Update PTC Data Files | PTC Field Engineer / PTC Technician | I-ETMS, PTC Back Office Server (BOS) | Acceptance or rework order | Updated PTC data files | Data file update accuracy above 98% | Incorrect or incomplete data updates | N | Y |
| 1.9 | Verify PTC Data File Update | Signal Maintainer | I-ETMS, PTC Back Office Server (BOS) | Updated PTC data files | Verification report | 100% verification accuracy | Data file discrepancies after update | Y | N |
| 1.10 | Close Maintenance Request | Track Supervisor | NetControl | Verification report | Closed maintenance request form | Maintenance closure within 24 hours of verification | Delayed closure due to unresolved issues | N | Y |
| 1.11 | Review Maintenance History | Chief Engineer / VP Engineering | NetControl, Umler | Closed maintenance request form | Maintenance history report | Historical data accuracy above 95% | Inaccurate historical records | Y | N |
| 1.12 | Plan Future Maintenance | Track Supervisor | NetControl, I-ETMS | Maintenance history report | Future maintenance plan | Proactive planning rate above 80% | Inadequate future planning | Y | N |
📊 KPIs & Risk Register
KPIs
Response time within 24 hours of detection Plan approval within 48 hours of initiation 100% coverage of inspection areas Defect identification accuracy above 95% On-time repair completion rate above 90% First-time acceptance rate above 85% Data file update accuracy above 98% 100% verification accuracy Maintenance closure within 24 hours of verification Historical data accuracy above 95% Proactive planning rate above 80%
Key Risks
Inaccurate or incomplete inspections leading to missed defects Overlapping or conflicting repair schedules causing delays Incorrect or incomplete data updates affecting PTC functionality Data file discrepancies after update impacting train operations Delayed closure due to unresolved issues
Swim Lanes
Track Supervisor · 1.1, 1.4, 1.5, 1.7, 1.10 Chief Engineer / VP Engineering · 1.2, 1.11 Track Inspector · 1.3 Assistant Foreman (track) · 1.6 PTC Field Engineer / PTC Technician · 1.8 Signal Maintainer · 1.9