US Class I Rail Process Wiki Terminal & Yard Operations › Air Brake Tests & Departure Inspection
🗺 BPMN Process Flow
RR-03-05-03 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-03-05-03
Domain FamilyOPERATIONS
L1 DomainTerminal & Yard Operations
L2 Process GroupAir Brake Tests & Departure Inspection
TriggerThe arrival of a train into Bailey Yard
OutcomeA train passes all air brake tests and receives clearance to depart from Bailey Yard.
SystemsNetControl I-ETMS Umler Wabtrax HASTUS TRAIN II
Regulatory Hooks49 CFR Part 232 GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Train Arrival Notification Yardmaster NetControl Train arrival report Arrival confirmation in NetControl Time from train arrival to notification < 5 minutes Delayed notification affecting yard operations N N
1.2 Assign Car Inspector Yardmaster Umler Train schedule and crew availability Car Inspector assignment to train Assignment within 10 minutes of notification Insufficient inspectors available N N
1.3 Conduct Initial Inspection Car Inspector (Carman) Wabtrax Train manifest and safety checklist Inspection report Initial inspection completed within 15 minutes Missing or incomplete documentation Y N
1.4 Air Brake Test Preparation Car Inspector (Carman) HASTUS Inspection report and brake test protocol Prepared brake test plan Brake test preparation completed within 5 minutes Equipment failure during preparation N Y
1.5 Conduct Air Brake Test Car Inspector (Carman) Wabtrax Prepared brake test plan and train data Air brake test results Air brake test completed within 30 minutes Defective brakes not identified Y N
1.6 Review Test Results Car Inspector (Carman) Wabtrax Air brake test results and safety checklist Test result review report Review completed within 10 minutes Incorrect interpretation of test data Y N
1.7 Notify Yardmaster of Results Car Inspector (Carman) NetControl Test result review report Notification to Yardmaster Notification sent within 5 minutes Delayed notification affecting departure N Y
1.8 Prepare Departure Documentation Yardmaster TRAIN II Test result review report and train schedule Departure documentation Documentation prepared within 10 minutes Missing or incorrect documentation N N
1.9 Conduct Final Inspection Car Inspector (Carman) Wabtrax Departure documentation and safety checklist Final inspection report Final inspection completed within 15 minutes Safety issues not identified Y N
1.10 Approve Departure Yardmaster NetControl Final inspection report and departure documentation Departure approval Approval given within 5 minutes Incorrect approval process Y N
1.11 Update Train Schedule Yardmaster NetControl Departure approval and train schedule Updated train schedule Schedule updated within 5 minutes Incorrect schedule update N Y
1.12 Departure Notification to Dispatch Yardmaster Harriman Dispatching Center (HDC) Updated train schedule and departure approval Departure notification to dispatch Notification sent within 5 minutes Delayed notification affecting overall operations N Y
📊 KPIs & Risk Register

KPIs

Initial inspection completed within 15 minutes Air brake test completed within 30 minutes Review completed within 10 minutes Notification sent within 5 minutes Schedule updated within 5 minutes

Key Risks

Defective brakes released to the road Incorrect interpretation of test data Safety issues not identified Incorrect approval process Delayed notification affecting overall operations

Swim Lanes

Yardmaster · 1.1, 1.2, 1.7, 1.8, 1.10, 1.11, 1.12 Car Inspector (Carman) · 1.3, 1.4, 1.5, 1.6, 1.9