US Class I Rail Process Wiki Terminal & Yard Operations › Local and Industry Switching
🗺 BPMN Process Flow
RR-03-04-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-03-04-01
Domain FamilyOPERATIONS
L1 DomainTerminal & Yard Operations
L2 Process GroupLocal and Industry Switching
TriggerArrival of an inbound train at Bailey Yard
OutcomeSuccessful sorting and assembly of outbound trains with minimal delays and adherence to safety regulations.
SystemsNetControl I-ETMS Hump yard classification technology EHMS Interline Settlement System (ISS) Wayside defect detector network
Regulatory Hooks49 CFR Part 232 GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Train Arrival Notification Yardmaster NetControl Arrival notification from Harriman Dispatching Center (HDC) Train arrival confirmation in NetControl Time to confirm train arrival under 5 minutes Delayed train arrival notifications N Y
1.2 Train Positioning Switchman/Switch Foreman Hump yard classification technology Train arrival confirmation in NetControl Train positioned for sorting Time to position train under 10 minutes Incorrect train positioning Y N
1.3 Car Sorting Switchman/Switch Foreman Hump yard classification technology Train positioned for sorting Sorted cars ready for assembly Cars sorted per hour above 100 Sorting errors leading to re-sorting Y Y
1.4 Train Assembly Switchman/Switch Foreman Hump yard classification technology Sorted cars ready for assembly Assembled outbound train Time to assemble train under 30 minutes Incomplete train assembly N Y
1.5 Train Departure Notification Yardmaster NetControl Assembled outbound train Departure notification to Harriman Dispatching Center (HDC) Time to notify departure under 5 minutes Delayed departure notifications N Y
1.6 Train Departure Locomotive Engineer I-ETMS Departure notification from NetControl Train departs Bailey Yard Train speed above 20 mph Slow train departures Y N
1.7 Car Inspection Car Inspector (Carman) EHMS Departing train manifest Inspection report Cars inspected per hour above 50 Undetected car defects Y Y
1.8 Settlement Data Exchange Switchman/Switch Foreman Interline Settlement System (ISS) Inspection report Settled data for car hire and revenue sharing Time to exchange settlement data under 10 minutes Data exchange errors N Y
1.9 Train Monitoring Control Operator I-ETMS Departing train data Train performance monitoring Train on-time rate above 95% Train delays Y N
1.10 Defect Detection Car Inspector (Carman) Wayside defect detector network Train performance monitoring Defect report Defect detection rate above 90% Undetected defects Y Y
1.11 Maintenance Scheduling Train Dispatcher EHMS Defect report Maintenance schedule Time to schedule maintenance under 24 hours Delayed maintenance Y N
1.12 Post-Departure Review Yardmaster NetControl Maintenance schedule Review report Review completion rate above 90% Incomplete reviews N Y
📊 KPIs & Risk Register

KPIs

Terminal dwell under 24 hours Train speed above 20 mph Cars sorted per hour above 100 Time to assemble train under 30 minutes Time to notify departure under 5 minutes Cars inspected per hour above 50 Time to exchange settlement data under 10 minutes Train on-time rate above 95% Defect detection rate above 90% Time to schedule maintenance under 24 hours Review completion rate above 90%

Key Risks

Air brake test defect released to the road Train derailment due to improper sorting Revenue loss from undetected car defects Maintenance delays affecting train schedules Data exchange errors leading to financial discrepancies

Swim Lanes

Yardmaster · 1.1, 1.5, 1.12 Switchman/Switch Foreman · 1.2, 1.3, 1.4, 1.8 Car Inspector (Carman) · 1.7, 1.10 Locomotive Engineer · 1.6 Control Operator · 1.9 Train Dispatcher · 1.11