US Class I Rail Process Wiki Dispatching & Train Movement › Territory Dispatching (CTC)
🗺 BPMN Process Flow
RR-02-01-03 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-02-01-03
Domain FamilyNETWORK & PLANNING
L1 DomainDispatching & Train Movement
L2 Process GroupTerritory Dispatching (CTC)
TriggerTrain arrival at terminal or yard with completed operations
OutcomeTrains are dispatched from the terminal or yard to their next destination following all regulatory requirements and operational standards.
SystemsNetControl CADx I-ETMS
Regulatory Hooks49 CFR Part 232 GCOR
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Receive Train Arrival Notification Train Dispatcher NetControl / CADx Train arrival report from yardmaster or switchman Updated train schedule in NetControl Train arrival notification within 5 minutes of actual arrival Delayed notifications affecting subsequent train movements N N
1.2 Conduct Pre-Dispatch Review Train Dispatcher NetControl / CADx Train schedule and status from NetControl Pre-dispatch review report 100% accuracy in pre-dispatch review Errors in the train schedule leading to delays Y N
1.3 Initiate Train Dispatch Train Dispatcher NetControl / CADx Approved dispatch plan from pre-dispatch review Dispatch order sent to train crew Train dispatched within 10 minutes of approval Delayed dispatch causing schedule disruptions N Y
1.4 Monitor Train Movement Control Operator NetControl / CADx Train movement data from NetControl Real-time train status updates 95% accuracy in real-time tracking Loss of communication with the train crew Y N
1.5 Adjust Train Schedule Train Dispatcher NetControl / CADx Real-time status updates from Control Operator Adjusted dispatch schedule in NetControl 90% reduction in schedule adjustments due to unforeseen delays Frequent schedule changes affecting overall efficiency Y Y
1.6 Ensure Train Safety Train Dispatcher NetControl / CADx, I-ETMS Safety data from I-ETMS and NetControl Safety compliance report 100% adherence to safety protocols Non-compliance with safety regulations leading to incidents Y N
1.7 Coordinate Interline Operations Train Dispatcher NetControl / CADx, ISS / SSDX / CHDX Interline data from ISS Coordinated interline schedule 98% successful coordination of interline operations Miscommunication between railroads causing delays Y Y
1.8 Update Train Status Control Operator NetControl / CADx Train status updates from train crew Updated train schedule in NetControl 95% accuracy in updating train status Inaccurate status updates leading to mismanagement N Y
1.9 Conduct Post-Dispatch Review Train Dispatcher NetControl / CADx Final train schedule and status from NetControl Post-dispatch review report 100% completion of post-dispatch reviews Omissions in the post-dispatch review process Y N
1.10 Prepare for Next Train Arrival Train Dispatcher NetControl / CADx Post-dispatch review report Preparedness plan for next train arrival 95% readiness for next train arrival Lack of preparedness leading to delays N Y
📊 KPIs & Risk Register

KPIs

Train arrival notification within 5 minutes of actual arrival 100% accuracy in pre-dispatch review Train dispatched within 10 minutes of approval 95% accuracy in real-time tracking 90% reduction in schedule adjustments due to unforeseen delays 100% adherence to safety protocols 98% successful coordination of interline operations 95% accuracy in updating train status 100% completion of post-dispatch reviews 95% readiness for next train arrival

Key Risks

Air brake test defect released to the road Non-compliance with safety regulations leading to incidents Miscommunication between railroads causing delays Inaccurate status updates leading to mismanagement Lack of preparedness leading to delays

Swim Lanes

Train Dispatcher · 1.1, 1.2, 1.3, 1.5, 1.6, 1.7, 1.9, 1.10 Control Operator · 1.4, 1.8