US Class I Rail Process Wiki Mechanical & Rolling Stock › Locomotive Running Repair & Servicing
🗺 BPMN Process Flow
RR-05-01-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-05-01-01
Domain FamilyOPERATIONS
L1 DomainMechanical & Rolling Stock
L2 Process GroupLocomotive Running Repair & Servicing
TriggerDetection of a hot bearing or wheel impact by the wayside defect detector network, or identification of a locomotive requiring maintenance during routine inspections.
OutcomeA fully serviced and repaired locomotive ready for return to active service with all safety systems operational.
SystemsWayside defect detector network NetControl I-ETMS Umler EHMS Wabtec Modular Control Architecture
Regulatory Hooks49 CFR Part 232 49 CFR Part 215 AAR Interchange Rules (Rule 88 and related)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Locomotive Identification Service Operator Wayside defect detector network Defect detection data Locomotive ID and maintenance order Time to identify locomotive under 5 minutes Delayed identification due to system malfunctions N Y
1.2 Locomotive Routing Manager-Locomotive Maintenance NetControl Locomotive ID and maintenance order Routing instructions to appropriate shop Routing time under 15 minutes Inefficient routing causing delays N Y
1.3 Locomotive Arrival at Shop Service Operator NetControl Routing instructions Locomotive arrives at designated shop Arrival time within 30 minutes of routing Traffic congestion causing delays N Y
1.4 Initial Inspection and Defect Identification Electrician (locomotive) EHMS Locomotive arrival notification Inspection report with defect list Completion of initial inspection within 1 hour Complex defects requiring extended diagnosis Y N
1.5 Defect Prioritization and Repair Planning Manager-Locomotive Maintenance Umler Inspection report with defect list Repair plan and schedule Repair planning completed within 2 hours Resource allocation conflicts Y N
1.6 Component Replacement or Repair Machinist Wabtec Modular Control Architecture Repair plan and schedule Repaired or replaced components Component replacement rate above 95% Difficult-to-reach parts N Y
1.7 Air Brake System Test Electrician (locomotive) I-ETMS Repaired components Air brake test results Pass rate of air brake tests above 98% Defective parts causing failed tests Y Y
1.8 Locomotive Reassembly and Final Inspection Electrician (locomotive) EHMS Air brake test results Final inspection report Completion of final inspection within 2 hours Hidden defects not caught in initial inspections N Y
1.9 Locomotive Testing and Readiness Check Service Operator NetControl Final inspection report Testing results and readiness status Readiness rate above 90% Undetected issues causing operational failures Y N
1.10 Locomotive Departure for Service Service Operator NetControl Testing results and readiness status Locomotive departs for service Departure time within 1 hour of final inspection Traffic delays causing departure delays N Y
📊 KPIs & Risk Register

KPIs

Time to identify locomotive under 5 minutes Routing time under 15 minutes Arrival time within 30 minutes of routing Completion of initial inspection within 1 hour Repair planning completed within 2 hours Component replacement rate above 95% Pass rate of air brake tests above 98% Completion of final inspection within 2 hours Readiness rate above 90% Departure time within 1 hour of final inspection

Key Risks

Air brake test defect released to the road Locomotive delays due to inefficient routing Traffic congestion causing delays Resource allocation conflicts Undetected issues causing operational failures

Swim Lanes

Service Operator · 1.1, 1.2, 1.3, 1.9, 1.10 Manager-Locomotive Maintenance · 1.4, 1.5 Electrician (locomotive) · 1.6, 1.7, 1.8