RR-05 RR-05-03-03 — Railcar Repair & Billing Repair Card Processing
This process involves the repair and billing of railcars at various shops and yards, ensuring compliance with safety regulations and efficient operations.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-05-03-03 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Mechanical & Rolling Stock |
| L2 Process Group | Railcar Repair & Billing Repair Card Processing |
| Trigger | Detection of a defect in a railcar by the wayside defect detector network or during routine inspections. |
| Outcome | A repaired and billed railcar ready for return to service, with accurate records for financial tracking and regulatory compliance. |
| Systems | Wayside defect detector network Downing B. Jenks Shop Umler CHARM TRAIN II NetControl I-ETMS |
| Regulatory Hooks | 49 CFR Part 232 49 CFR Part 215 AAR Interchange Rules |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Defect Detection Notification | Service Operator | Wayside defect detector network | Defect report from the wayside detector | Notification to the Downing B. Jenks Shop | Time to notify shop under 1 hour | Delayed notification due to system failures | N | Y |
| 1.2 | Initial Assessment | Machinist | Downing B. Jenks Shop | Defect report and railcar details | Assessment report and repair plan | Repair assessment completed within 2 hours | Inaccurate initial assessments leading to additional repairs | Y | N |
| 1.3 | Repair Authorization | Manager-Mechanical Maintenance | Umler | Assessment report and repair plan | Authorized repair order | Authorization time under 4 hours | Delays in authorization due to complex cases | Y | Y |
| 1.4 | Repair Execution | Machinist | Downing B. Jenks Shop | Authorized repair order and railcar | Repaired railcar | Repair completion time under 24 hours | Extended repair times due to unforeseen issues | N | Y |
| 1.5 | Quality Inspection | Electrician (locomotive) | Downing B. Jenks Shop | Repaired railcar | Inspection report | Inspection time under 2 hours | Missed defects due to inadequate inspection | Y | N |
| 1.6 | Billing Preparation | Manager-Mechanical Maintenance | CHARM | Inspection report and repair details | Billing document | Billing preparation time under 4 hours | Errors in billing due to incorrect data entry | N | Y |
| 1.7 | Billing Approval | Senior Director-System Locomotive Facility | CHARM | Billing document | Approved billing record | Approval time under 24 hours | Delays in approval due to financial discrepancies | Y | N |
| 1.8 | Repair Card Generation | Service Operator | TRAIN II | Approved billing record and repair details | Repair card | Card generation time under 2 hours | Lost or damaged repair cards | N | Y |
| 1.9 | Return to Service Notification | Service Operator | NetControl | Repair card and railcar details | Notification to the train dispatcher | Return notification time under 1 hour | Incorrect notifications leading to service disruptions | N | Y |
| 1.10 | Service Readiness Check | Train Dispatcher | I-ETMS | Notification and railcar status | Readiness confirmation | Readiness check time under 3 hours | False positives in readiness checks | Y | N |
| 1.11 | Final Inspection | Electrician (locomotive) | Downing B. Jenks Shop | Repaired railcar and readiness confirmation | Final inspection report | Inspection time under 2 hours | Negligent final inspections | Y | N |
| 1.12 | Dispatch for Service | Train Dispatcher | NetControl | Final inspection report and railcar details | Dispatch order | Dispatch time under 1 hour | Incorrect dispatch orders leading to delays | N | Y |
📊 KPIs & Risk Register
KPIs
Time to notify shop under 1 hour Repair assessment completed within 2 hours Authorization time under 4 hours Repair completion time under 24 hours Inspection time under 2 hours Billing preparation time under 4 hours Approval time under 24 hours Card generation time under 2 hours Return notification time under 1 hour Readiness check time under 3 hours
Key Risks
Defective repairs leading to safety hazards Billing errors causing financial disputes Inaccurate readiness checks resulting in service delays Lost or damaged repair cards affecting traceability Incorrect dispatch orders disrupting train schedules
Swim Lanes
Service Operator · 1.1, 1.9 Machinist · 1.2, 1.4 Electrician (locomotive) · 1.5, 1.11 Manager-Mechanical Maintenance · 1.3, 1.6 Senior Director-System Locomotive Facility · 1.7 Train Dispatcher · 1.10, 1.12