RR-08 RR-08-02-01 — TIH/PIH Handling and Route Risk Analysis
This process involves the handling of hazardous materials (TIH/PIH) and conducting route risk analysis for trains operating on US Class I freight railroad tracks. It ensures compliance with regulations, safety standards, and environmental protocols.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-08-02-01 |
|---|---|
| Domain Family | CORPORATE |
| L1 Domain | Hazardous Materials & Environmental |
| L2 Process Group | TIH/PIH Handling and Route Risk Analysis |
| Trigger | Initiation by a Hazmat Compliance Officer upon receiving notification of a train carrying hazardous materials or upon identifying a potential route risk. |
| Outcome | Successful completion results in the safe transportation of hazardous materials, identification and mitigation of route risks, and adherence to all relevant regulations and safety standards. |
| Systems | NetControl I-ETMS TRANSCAER SERTC EHMS |
| Regulatory Hooks | 49 CFR Part 172-174 AAR Circular OT-55 (key train / TIH-PIH handling) |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Identify TIH/PIH Train | Hazmat Compliance Officer | AskRail | Train manifest or notification of hazardous materials | TIH/PIH train identification report | Time to identify TIH/PIH train < 1 hour | Inaccurate manifest data leading to misidentification | Y | N |
| 1.2 | Review Route Risk | Emergency Response Coordinator | TRANSCAER | TIH/PIH train identification report | Route risk assessment report | Route risk review completed within 2 hours | Inadequate route data affecting risk assessment | Y | Y |
| 1.3 | Update Train Schedule | Train Dispatcher | NetControl | Route risk assessment report | Updated train schedule with safety precautions | Schedule update completed within 1 hour | Traffic congestion affecting schedule updates | N | Y |
| 1.4 | Conduct Pre-Departure Inspection | Car Inspector (Carman) | EHMS | Updated train schedule | Pre-departure inspection report | Inspection completed within 30 minutes | Equipment failure during inspection | Y | N |
| 1.5 | Monitor Train Movement | Control Operator | I-ETMS | Pre-departure inspection report | Train movement monitoring report | Continuous monitoring without interruption | System failure affecting monitoring | N | Y |
| 1.6 | Assess Environmental Impact | Hazmat Compliance Officer | TRANSCAER | Train movement monitoring report | Environmental impact assessment report | Impact assessment completed within 4 hours | Data collection errors affecting assessment | Y | N |
| 1.7 | Update Emergency Response Plan | Emergency Response Coordinator | SERTC | Environmental impact assessment report | Updated emergency response plan | Plan update completed within 2 hours | Resource allocation issues affecting plan updates | N | Y |
| 1.8 | Review and Approve Route Changes | VP Network Planning & Operations | NetControl | Updated emergency response plan | Route change approval document | Approval process completed within 1 hour | Complex route changes requiring extensive review | Y | N |
| 1.9 | Implement Safety Precautions | Train Dispatcher | NetControl | Route change approval document | Safety precautions implementation report | Precautions implemented within 30 minutes | Coordination issues between departments | N | Y |
| 1.10 | Monitor Train Performance | Control Operator | I-ETMS | Safety precautions implementation report | Train performance monitoring report | Continuous performance monitoring without interruption | System failure affecting monitoring | N | Y |
| 1.11 | Review and Adjust Route Risk | Emergency Response Coordinator | TRANSCAER | Train performance monitoring report | Adjusted route risk assessment report | Risk review completed within 2 hours | Inadequate data affecting risk assessment | Y | N |
| 1.12 | Finalize Route and Safety Measures | Train Dispatcher | NetControl | Adjusted route risk assessment report | Finalized route and safety measures document | Finalization process completed within 1 hour | Coordination issues between departments | N | Y |
📊 KPIs & Risk Register
KPIs
Time to identify TIH/PIH train < 1 hour Route risk review completed within 2 hours Schedule update completed within 1 hour Inspection completed within 30 minutes Continuous monitoring without interruption Impact assessment completed within 4 hours Plan update completed within 2 hours Approval process completed within 1 hour Precautions implemented within 30 minutes Risk review completed within 2 hours Finalization process completed within 1 hour
Key Risks
Inaccurate manifest data leading to misidentification Traffic congestion affecting schedule updates Equipment failure during inspection System failure affecting monitoring Data collection errors affecting assessment Resource allocation issues affecting plan updates Coordination issues between departments
Swim Lanes
Hazmat Compliance Officer · 1.1, 1.6 Emergency Response Coordinator · 1.2, 1.7, 1.11 Train Dispatcher · 1.3, 1.9, 1.12 Control Operator · 1.5, 1.10 Car Inspector (Carman) · 1.4