US Class I Rail Process Wiki Interline, Equipment & Car Management › Empty Car Distribution and Fleet Allocation
🗺 BPMN Process Flow
RR-11-04-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-11-04-02
Domain FamilyNETWORK & PLANNING
L1 DomainInterline, Equipment & Car Management
L2 Process GroupEmpty Car Distribution and Fleet Allocation
TriggerThe process is initiated when an Interline Settlement Analyst identifies a shortage of empty cars in specific regions or terminals based on data from the CHARM system and the Interline Settlement System (ISS).
OutcomeSuccessful completion results in the timely distribution and allocation of empty cars to meet operational needs, ensuring compliance with regulatory standards and optimizing fleet utilization.
SystemsNetControl I-ETMS Umler TRAIN II EHMS ISS
Regulatory Hooks49 CFR Part 232 GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Identify Shortage Interline Settlement Analyst CHARM, ISS Demand data from CHARM, shortage alerts from ISS Shortage report Time to identify shortage < 2 hours Inaccurate demand forecasting leading to unmet needs N Y
1.2 Assess Fleet Availability Equipment Registration / Umler Data Analyst Umler, TRAIN II Fleet data from Umler, availability reports from TRAIN II Fleet availability report Accuracy of fleet assessment > 95% Outdated or incomplete fleet data N Y
1.3 Plan Distribution Strategy VP Network Planning & Operations NetControl, GCOR Shortage report, fleet availability report Distribution strategy plan Number of strategic plans developed per day > 5 Balancing operational needs with regulatory constraints Y N
1.4 Dispatch Empty Cars Train Dispatcher I-ETMS, PS Technology Distribution strategy plan Dispatch orders Average dispatch time < 30 minutes Traffic congestion affecting dispatch efficiency N Y
1.5 Monitor Train Movement Control Operator I-ETMS, NetControl Dispatch orders Train movement data Track utilization rate > 80% Unexpected delays due to unforeseen issues N Y
1.6 Conduct Pre-Departure Inspection Car Inspector (Carman) EHMS, Wabtrax Train movement data Inspection report Number of inspections per train > 2 Ensuring all cars meet safety standards Y N
1.7 Update Fleet Status Equipment Registration / Umler Data Analyst Umler, TRAIN II Inspection report Updated fleet status Time to update fleet status < 1 hour Data synchronization issues between systems N Y
1.8 Coordinate with Interline Partners Interline Settlement Analyst ISS, CHDX Updated fleet status Coordination report Number of coordination calls per day > 10 Effective communication with interline partners Y N
1.9 Review and Adjust Strategy VP Network Planning & Operations NetControl, GCOR Coordination report Adjusted distribution strategy Number of adjustments per day < 2 Dynamic changes in operational needs Y N
1.10 Finalize Distribution Train Dispatcher I-ETMS, PS Technology Adjusted distribution strategy Final dispatch orders Number of final dispatches per day > 20 Traffic congestion affecting final dispatch N Y
1.11 Monitor Terminal Operations Yardmaster I-ETMS, NetControl Final dispatch orders Terminal operations data Terminal dwell under 24 hours Efficient terminal management N Y
1.12 Report and Review Interline Settlement Analyst CHARM, ISS Terminal operations data Operational report Number of reports per week > 5 Comprehensive reporting for continuous improvement Y N
📊 KPIs & Risk Register

KPIs

Time to identify shortage < 2 hours Accuracy of fleet assessment > 95% Average dispatch time < 30 minutes Track utilization rate > 80% Number of inspections per train > 2 Time to update fleet status < 1 hour Number of coordination calls per day > 10 Number of adjustments per day < 2 Number of final dispatches per day > 20 Terminal dwell under 24 hours Number of reports per week > 5

Key Risks

Air brake test defect released to the road Traffic congestion affecting dispatch efficiency Unexpected delays due to unforeseen issues Ensuring all cars meet safety standards Data synchronization issues between systems Effective communication with interline partners Dynamic changes in operational needs Traffic congestion affecting final dispatch Efficient terminal management Comprehensive reporting for continuous improvement

Swim Lanes

Interline Settlement Analyst · 1.1, 1.3, 1.5, 1.7, 1.9, 1.12 Equipment Registration / Umler Data Analyst · 1.2, 1.4, 1.8, 1.10 VP Network Planning & Operations · 1.3, 1.9 Train Dispatcher · 1.4, 1.10 Control Operator · 1.5 Car Inspector (Carman) · 1.6 Yardmaster · 1.11