RR-11 RR-11-04-02 — Empty Car Distribution and Fleet Allocation
This process involves the distribution and allocation of empty cars across different interline operations within a US Class I freight railroad. It ensures that empty cars are efficiently managed to meet demand while adhering to regulatory requirements and optimizing operational efficiency.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-11-04-02 |
|---|---|
| Domain Family | NETWORK & PLANNING |
| L1 Domain | Interline, Equipment & Car Management |
| L2 Process Group | Empty Car Distribution and Fleet Allocation |
| Trigger | The process is initiated when an Interline Settlement Analyst identifies a shortage of empty cars in specific regions or terminals based on data from the CHARM system and the Interline Settlement System (ISS). |
| Outcome | Successful completion results in the timely distribution and allocation of empty cars to meet operational needs, ensuring compliance with regulatory standards and optimizing fleet utilization. |
| Systems | NetControl I-ETMS Umler TRAIN II EHMS ISS |
| Regulatory Hooks | 49 CFR Part 232 GCOR 6.28 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Identify Shortage | Interline Settlement Analyst | CHARM, ISS | Demand data from CHARM, shortage alerts from ISS | Shortage report | Time to identify shortage < 2 hours | Inaccurate demand forecasting leading to unmet needs | N | Y |
| 1.2 | Assess Fleet Availability | Equipment Registration / Umler Data Analyst | Umler, TRAIN II | Fleet data from Umler, availability reports from TRAIN II | Fleet availability report | Accuracy of fleet assessment > 95% | Outdated or incomplete fleet data | N | Y |
| 1.3 | Plan Distribution Strategy | VP Network Planning & Operations | NetControl, GCOR | Shortage report, fleet availability report | Distribution strategy plan | Number of strategic plans developed per day > 5 | Balancing operational needs with regulatory constraints | Y | N |
| 1.4 | Dispatch Empty Cars | Train Dispatcher | I-ETMS, PS Technology | Distribution strategy plan | Dispatch orders | Average dispatch time < 30 minutes | Traffic congestion affecting dispatch efficiency | N | Y |
| 1.5 | Monitor Train Movement | Control Operator | I-ETMS, NetControl | Dispatch orders | Train movement data | Track utilization rate > 80% | Unexpected delays due to unforeseen issues | N | Y |
| 1.6 | Conduct Pre-Departure Inspection | Car Inspector (Carman) | EHMS, Wabtrax | Train movement data | Inspection report | Number of inspections per train > 2 | Ensuring all cars meet safety standards | Y | N |
| 1.7 | Update Fleet Status | Equipment Registration / Umler Data Analyst | Umler, TRAIN II | Inspection report | Updated fleet status | Time to update fleet status < 1 hour | Data synchronization issues between systems | N | Y |
| 1.8 | Coordinate with Interline Partners | Interline Settlement Analyst | ISS, CHDX | Updated fleet status | Coordination report | Number of coordination calls per day > 10 | Effective communication with interline partners | Y | N |
| 1.9 | Review and Adjust Strategy | VP Network Planning & Operations | NetControl, GCOR | Coordination report | Adjusted distribution strategy | Number of adjustments per day < 2 | Dynamic changes in operational needs | Y | N |
| 1.10 | Finalize Distribution | Train Dispatcher | I-ETMS, PS Technology | Adjusted distribution strategy | Final dispatch orders | Number of final dispatches per day > 20 | Traffic congestion affecting final dispatch | N | Y |
| 1.11 | Monitor Terminal Operations | Yardmaster | I-ETMS, NetControl | Final dispatch orders | Terminal operations data | Terminal dwell under 24 hours | Efficient terminal management | N | Y |
| 1.12 | Report and Review | Interline Settlement Analyst | CHARM, ISS | Terminal operations data | Operational report | Number of reports per week > 5 | Comprehensive reporting for continuous improvement | Y | N |
📊 KPIs & Risk Register
KPIs
Time to identify shortage < 2 hours Accuracy of fleet assessment > 95% Average dispatch time < 30 minutes Track utilization rate > 80% Number of inspections per train > 2 Time to update fleet status < 1 hour Number of coordination calls per day > 10 Number of adjustments per day < 2 Number of final dispatches per day > 20 Terminal dwell under 24 hours Number of reports per week > 5
Key Risks
Air brake test defect released to the road Traffic congestion affecting dispatch efficiency Unexpected delays due to unforeseen issues Ensuring all cars meet safety standards Data synchronization issues between systems Effective communication with interline partners Dynamic changes in operational needs Traffic congestion affecting final dispatch Efficient terminal management Comprehensive reporting for continuous improvement
Swim Lanes
Interline Settlement Analyst · 1.1, 1.3, 1.5, 1.7, 1.9, 1.12 Equipment Registration / Umler Data Analyst · 1.2, 1.4, 1.8, 1.10 VP Network Planning & Operations · 1.3, 1.9 Train Dispatcher · 1.4, 1.10 Control Operator · 1.5 Car Inspector (Carman) · 1.6 Yardmaster · 1.11