US Class I Rail Process Wiki Intermodal & Automotive Operations › Lift and Stack Operations
🗺 BPMN Process Flow
RR-09-02-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-09-02-01
Domain FamilyOPERATIONS
L1 DomainIntermodal & Automotive Operations
L2 Process GroupLift and Stack Operations
TriggerReceipt of a train with intermodal containers at the ICTF
OutcomeSuccessful transfer and stacking of intermodal containers within the terminal, ready for outbound operations.
SystemsNetControl UPGo EHMS CHARM Interline Settlement System (ISS) Driver scanning / gate technology (generic 'Yard System')
Regulatory Hooks49 CFR Part 232 GCOR 6.28 C-TPAT (Customs-Trade Partnership Against Terrorism)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Train Arrival Notification Control Operator NetControl Train arrival notification from Harriman Dispatching Center Arrival confirmation in NetControl Time to acknowledge train arrival under 5 minutes Delayed train notifications N N
1.2 Container Inspection Car Inspector (Carman) EHMS Train manifest and container list Inspection report in EHMS 100% inspection accuracy Defective containers not identified Y Y
1.3 Lift and Stack Planning Intermodal Terminal Manager UPGo Inspection report, train manifest, yard layout Lift and stack plan in UPGo Plan completion within 15 minutes of inspection Inefficient planning leading to delays N Y
1.4 Crane Operator Assignment Crane/Lift Operator UPGo Lift and stack plan Assigned crane operator in UPGo 95% crane utilization rate Crane availability issues N Y
1.5 Container Lift and Stack Execution Crane/Lift Operator UPGo Lift and stack plan, crane operator assignment Completed lift and stack operations in UPGo 90% on-time container handling Handling delays due to equipment issues Y Y
1.6 Container Security Check Drayman / Draymen Driver scanning / gate technology (generic 'Yard System') Completed lift and stack operations Security clearance report 100% security checks passed Security breaches N Y
1.7 Train Departure Preparation Control Operator NetControl Completed lift and stack operations, security clearance report Departure preparation confirmation in NetControl Train departure readiness within 30 minutes of completion Preparation delays N Y
1.8 Final Inspection and Documentation Car Inspector (Carman) EHMS Departure preparation confirmation, train manifest Final inspection report in EHMS 95% final inspection accuracy Missed issues during final inspection Y Y
1.9 Train Departure Notification Control Operator NetControl Final inspection report Departure notification to Harriman Dispatching Center Time to notify departure under 5 minutes Delayed departure notifications N N
1.10 Container Settlement and Accounting Intermodal Terminal Manager CHARM, Interline Settlement System (ISS) Train manifest, final inspection report Settlement data in CHARM, ISS 98% accurate settlement data Incorrect billing due to errors Y Y
1.11 Post-Departure Review Intermodal Terminal Manager UPGo, EHMS Train departure data, final inspection report Operational review report in UPGo 100% review completion within 24 hours Inadequate post-departure reviews N Y
1.12 Continuous Improvement Actions Intermodal Terminal Manager UPGo, EHMS Operational review report Improvement plan in UPGo 90% implementation of improvement actions within 1 week Lack of follow-up on identified issues Y Y
📊 KPIs & Risk Register

KPIs

Time to acknowledge train arrival under 5 minutes 100% inspection accuracy Plan completion within 15 minutes of inspection 95% crane utilization rate 90% on-time container handling 100% security checks passed Train departure readiness within 30 minutes of completion 95% final inspection accuracy Time to notify departure under 5 minutes 98% accurate settlement data 100% review completion within 24 hours 90% implementation of improvement actions within 1 week

Key Risks

Defective containers not identified during inspection Inefficient planning leading to delays in lift and stack operations Handling delays due to equipment issues Security breaches Preparation delays for train departure Incorrect billing due to errors in settlement data Lack of follow-up on identified issues during post-departure reviews

Swim Lanes

Control Operator · 1.1, 1.7, 1.9 Car Inspector (Carman) · 1.2, 1.8 Crane/Lift Operator · 1.4, 1.5 Intermodal Terminal Manager · 1.3, 1.10, 1.12 Drayman / Draymen · 1.6