US Class I Rail Process Wiki Service Design & Network Planning › Operating Plan Design
🗺 BPMN Process Flow
RR-01-01-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-01-01-01
Domain FamilyNETWORK & PLANNING
L1 DomainService Design & Network Planning
L2 Process GroupOperating Plan Design
TriggerAnnual review or update of the Unified Plan 2020 by the Manager of Train Operations
OutcomeA comprehensive operating plan that optimizes train schedules, minimizes delays, and ensures safety and efficiency across the network.
SystemsUnified Plan 2020 NetControl CADx I-ETMS EHMS
Regulatory Hooks49 CFR 232.205 GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Review Current Operating Plan Manager of Train Operations Unified Plan 2020 Current operating plan document Updated operating plan outline Number of trains on schedule above 95% Inconsistent train schedules leading to delays N N
1.2 Identify Network Constraints Train Dispatcher NetControl Network traffic data, track capacity reports List of network constraints and potential bottlenecks Number of identified constraints below 5% Overloaded tracks causing excessive delays Y N
1.3 Develop New Train Schedules Train Dispatcher NetControl / CADx Updated operating plan outline, network constraints list New train schedules Number of trains with optimized routes above 80% Inefficient routing leading to increased travel times Y N
1.4 Review and Validate Schedules Chief Dispatcher I-ETMS New train schedules, traffic data Validated train schedules Number of schedule conflicts below 2% Schedule conflicts causing delays and safety risks Y N
1.5 Update Equipment Health Records Mechanical Foreman EHMS Equipment maintenance logs, health check reports Updated equipment health records Number of trains with critical equipment issues below 1% Equipment failures leading to train delays Y N
1.6 Conduct Hazardous Material Review Hazmat Specialist TRANSCAER / GCOR Hazardous material manifests, safety protocols Safety compliance report Number of hazardous materials incidents below 0.5% Hazmat incidents causing delays and safety risks Y N
1.7 Implement New Operating Plan Manager of Train Operations Unified Plan 2020 / NetControl Validated train schedules, updated equipment health records, safety compliance report Implemented operating plan Number of trains running on schedule above 90% Implementation issues leading to delays N Y
1.8 Monitor and Adjust Operating Plan Train Dispatcher NetControl / CADx Real-time train data, network performance metrics Adjusted operating plan Number of adjustments below 10% Inability to adjust plans in real-time leading to delays Y N
1.9 Review and Report Performance Manager of Train Operations Unified Plan 2020 / NetControl Operating plan performance data, KPIs Performance report Number of KPI targets met above 85% Poor performance metrics leading to service issues N Y
1.10 Update Documentation and Procedures Train Dispatcher Unified Plan 2020 / NetControl Performance report, feedback from operations Updated documentation and procedures Number of updated documents above 95% Outdated procedures leading to inefficiencies N N
1.11 Conduct Safety Audit Safety Inspector EHMS / I-ETMS Operational data, safety protocols Safety audit report Number of safety violations below 1% Safety violations leading to accidents Y N
1.12 Finalize and Communicate Plan Manager of Train Operations Unified Plan 2020 / NetControl Implemented operating plan, safety audit report Finalized operating plan document Number of trains running on schedule above 95% Communication issues leading to misinterpretation of plans N Y
📊 KPIs & Risk Register

KPIs

Number of trains on schedule above 95% Number of trains with optimized routes above 80% Number of schedule conflicts below 2% Number of trains with critical equipment issues below 1% Number of hazardous materials incidents below 0.5% Number of adjustments below 10% Number of KPI targets met above 85% Number of safety violations below 1%

Key Risks

Inconsistent train schedules leading to delays Overloaded tracks causing excessive delays Equipment failures leading to train delays Hazmat incidents causing delays and safety risks Implementation issues leading to delays Safety violations leading to accidents

Swim Lanes

Manager of Train Operations · 1.1, 1.7, 1.9, 1.10, 1.12 Train Dispatcher · 1.2, 1.3, 1.4, 1.8 Chief Dispatcher · 1.5 Mechanical Foreman · 1.6 Hazmat Specialist ·