RR-15 RR-15-02-02 — Operating Plan and Service Assurance Plan
This process involves the development and implementation of an Operating Plan and Service Assurance Plan to ensure efficient rail operations and compliance with regulatory standards.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-15-02-02 |
|---|---|
| Domain Family | CORPORATE |
| L1 Domain | Merger & Network Integration |
| L2 Process Group | Operating Plan and Service Assurance Plan |
| Trigger | Initiated by the Chairman/CEO or Integration Program Management Office (PMO) lead following a merger or network integration event. |
| Outcome | Successful completion produces an optimized operating plan, enhanced service assurance measures, and improved operational efficiency. |
| Systems | NetControl I-ETMS Umler PS Technology EHMS |
| Regulatory Hooks | 49 CFR Part 232 GCOR 6.28 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Initiate Operating Plan Development | Integration Program Management Office (PMO) lead | NetControl | Merger or network integration report | Operating plan draft | Plan development completion within 30 days | Resource allocation for PMO team | N | Y |
| 1.2 | Review and Validate Plan | Chairman, President and CEO (plan sponsor level) | NetControl | Operating plan draft | Approved operating plan | Plan approval within 10 days of submission | Stakeholder alignment and buy-in | Y | N |
| 1.3 | Deploy Service Assurance Measures | VP Network Planning & Operations | I-ETMS, Umler, PS Technology | Approved operating plan | Service assurance implementation plan | 95% compliance with service standards within 6 months | Technical integration challenges | N | Y |
| 1.4 | Monitor Train Performance | Train Dispatcher, Control Operator | NetControl, I-ETMS | Service assurance implementation plan | Performance metrics report | Average train speed above 20 mph | Real-time data accuracy | N | Y |
| 1.5 | Conduct Regular Audits | Service Design / Network Planning Analyst, Car Inspector (Carman) | Umler, EHMS | Performance metrics report | Audit findings and recommendations | 100% audit coverage within 3 months | Resource constraints for audits | Y | N |
| 1.6 | Implement Corrective Actions | Chief Dispatcher, Yardmaster | NetControl, I-ETMS | Audit findings and recommendations | Corrective action plan | 90% corrective actions implemented within 2 weeks | Coordination across different departments | N | Y |
| 1.7 | Review and Update Plan | Integration Program Management Office (PMO) lead | NetControl, I-ETMS | Corrective action plan | Updated operating plan | Plan update cycle every 6 months | Continuous improvement process | Y | N |
| 1.8 | Ensure Regulatory Compliance | Train Dispatcher, Control Operator | NetControl, I-ETMS | Updated operating plan | Regulatory compliance report | 100% regulatory compliance with 49 CFR Part 232 | Compliance tracking and enforcement | N | Y |
| 1.9 | Optimize Terminal Operations | Switchman/Switch Foreman, Yardmaster | NetControl, Umler | Regulatory compliance report | Terminal operation optimization plan | Terminal dwell under 24 hours | Efficiency in terminal management | Y | N |
| 1.10 | Implement Optimization Plan | VP Network Planning & Operations, Train Dispatcher | NetControl, I-ETMS | Terminal operation optimization plan | Optimized terminal operations | 20% reduction in terminal dwell time within 3 months | Operational changes and disruptions | N | Y |
| 1.11 | Monitor and Report Performance | Service Design / Network Planning Analyst, Control Operator | NetControl, I-ETMS | Optimized terminal operations | Performance monitoring report | Continuous performance tracking and reporting | Data collection and analysis | N | Y |
| 1.12 | Review and Adjust Plans | Integration Program Management Office (PMO) lead, Chairman/CEO | NetControl, I-ETMS | Performance monitoring report | Adjusted operating plan | Plan adjustments based on performance data | Dynamic planning and adaptation | Y | N |
📊 KPIs & Risk Register
KPIs
Plan development completion within 30 days Plan approval within 10 days of submission 95% compliance with service standards within 6 months Average train speed above 20 mph 100% audit coverage within 3 months 90% corrective actions implemented within 2 weeks Plan update cycle every 6 months 100% regulatory compliance with 49 CFR Part 232 Terminal dwell under 24 hours 20% reduction in terminal dwell time within 3 months Continuous performance tracking and reporting Plan adjustments based on performance data
Key Risks
Resource allocation for PMO team Stakeholder alignment and buy-in Technical integration challenges Real-time data accuracy Resource constraints for audits Coordination across different departments Continuous improvement process Compliance tracking and enforcement Efficiency in terminal management Operational changes and disruptions Data collection and analysis Dynamic planning and adaptation
Swim Lanes
Integration Program Management Office (PMO) lead · 1.1, 1.7, 1.12 Chairman, President and CEO (plan sponsor level) · 1.2 VP Network Planning & Operations · 1.3, 1.6, 1.10 Train Dispatcher, Control Operator · 1.4, 1.8, 1.11 Service Design / Network Planning Analyst, Car Inspector (Carman) · 1.5 Chief Dispatcher, Yardmaster · 1.6, 1.9 Switchman/Switch Foreman, Yardmaster · 1.9, 1.10