US Class I Rail Process Wiki Service Design & Network Planning › Terminal Mission Design
🗺 BPMN Process Flow
RR-01-04-03 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-01-04-03
Domain FamilyNETWORK & PLANNING
L1 DomainService Design & Network Planning
L2 Process GroupTerminal Mission Design
TriggerInitiated by a Service Design / Network Planning Analyst upon receiving updated demand forecasts or changes in network conditions.
OutcomeSuccessful completion results in an optimized terminal mission plan that minimizes dwell times, maximizes train speeds, and ensures compliance with all relevant regulations.
SystemsUnified Plan 2020 NetControl CADx (Computer-Aided Dispatch) PS Technology (PST) EHMS (Equipment Health Management System)
Regulatory Hooks49 CFR Part 232 GCOR
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Analyze Terminal Capacity Service Design / Network Planning Analyst Unified Plan 2020 Demand forecasts, current terminal operations data Terminal capacity analysis report Terminal utilization rate above 85% Inaccurate demand forecasting leading to overcapacity or underutilization Y N
1.2 Design Terminal Layout Service Design / Network Planning Analyst Unified Plan 2020 Terminal capacity analysis report Terminal layout design document Train turnaround time reduced by 30 minutes Inefficient terminal layouts causing bottlenecks Y N
1.3 Develop Train Schedule Train Dispatcher NetControl Terminal layout design document, crew availability data Train schedule plan Train adherence to schedule above 95% Scheduling conflicts leading to delays Y N
1.4 Assign Crews and Equipment Crew Caller / Crew Dispatcher PS Technology (PST) Train schedule plan, crew availability data Crew assignment document Crew utilization rate above 80% Insufficient crew availability causing delays Y N
1.5 Conduct Pre-Departure Inspections Car Inspector (Carman) EHMS (Equipment Health Management System) Assigned equipment list, inspection checklists Pre-departure inspection report Defect rate below 1% Undetected defects leading to safety risks Y N
1.6 Monitor Train Operations Train Dispatcher NetControl / CADx (Computer-Aided Dispatch) Train schedule plan, real-time train data Operational status report Train speed above 20 mph Slow-moving trains causing delays Y N
1.7 Evaluate Terminal Performance Service Design / Network Planning Analyst Unified Plan 2020 Operational status report, performance metrics Performance evaluation report Terminal dwell under 24 hours Excessive terminal dwell times leading to inefficiencies Y N
1.8 Adjust Terminal Operations Service Design / Network Planning Analyst Unified Plan 2020 Performance evaluation report Adjusted terminal operations plan Terminal utilization rate above 85% Inflexible terminal operations causing inefficiencies Y N
1.9 Review Regulatory Compliance Service Design / Network Planning Analyst Unified Plan 2020 Adjusted terminal operations plan, regulatory guidelines Regulatory compliance report Compliance rate above 98% Non-compliance with regulations leading to fines Y N
1.10 Implement Changes Train Dispatcher NetControl / CADx (Computer-Aided Dispatch) Adjusted terminal operations plan, crew assignment document Change implementation report Implementation success rate above 90% Resistance to change causing delays Y N
1.11 Monitor Post-Change Performance Train Dispatcher NetControl / CADx (Computer-Aided Dispatch) Change implementation report, real-time train data Post-change performance report Train adherence to schedule above 95% Ineffective changes leading to continued inefficiencies Y N
1.12 Update Terminal Mission Plan Service Design / Network Planning Analyst Unified Plan 2020 Post-change performance report, feedback from stakeholders Updated terminal mission plan Continuous improvement rate above 5% Lack of continuous improvement leading to stagnation Y N
📊 KPIs & Risk Register

KPIs

Terminal utilization rate above 85% Train adherence to schedule above 95% Defect rate below 1% Train speed above 20 mph Terminal dwell under 24 hours Crew utilization rate above 80% Compliance rate above 98% Implementation success rate above 90% Continuous improvement rate above 5%

Key Risks

Air brake test defect released to the road Scheduling conflicts leading to delays Insufficient crew availability causing delays Undetected defects leading to safety risks Slow-moving trains causing delays

Swim Lanes

Service Design / Network Planning Analyst · 1.1, 1.2, 1.5, 1.7, 1.9, 1.12 Train Dispatcher · 1.3, 1.6, 1.8, 1.10, 1.11 Crew Caller / Crew Dispatcher · 1.4 Car Inspector (Carman) · 1.5