RR-07 RR-07-06-02 — Confidential Close Call Reporting
This process involves reporting confidential close calls within the US Class I freight railroad operations to ensure safety and regulatory compliance.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-07-06-02 |
|---|---|
| Domain Family | CORPORATE |
| L1 Domain | Safety & Regulatory Compliance |
| L2 Process Group | Confidential Close Call Reporting |
| Trigger | A crew member or supervisor identifies a potential safety hazard or incident that does not meet the criteria for a formal accident but requires immediate attention. |
| Outcome | The confidential close call is documented, reviewed, and addressed to prevent similar incidents in the future. The railroad ensures compliance with relevant regulations and internal policies. |
| Systems | NetControl C3RS Umler |
| Regulatory Hooks | 49 CFR Part 217 GCOR |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Identify Close Call | Locomotive Engineer | NetControl | Incident report form | Reported incident details | Time to identify and report a close call under 10 minutes | Delayed reporting can lead to oversight of potential safety issues. | Y | N |
| 1.2 | Report Close Call | Train Dispatcher | C3RS | Reported incident details | Confidential close call report | Close call reports submitted within 24 hours of occurrence | Missing or incomplete reports can hinder safety investigations. | N | Y |
| 1.3 | Review Close Call | Chief Safety Officer / VP Safety | C3RS | Confidential close call report | Reviewed incident summary | Incident review completed within 48 hours of reporting | Delayed reviews can delay necessary corrective actions. | Y | N |
| 1.4 | Determine Root Cause | Rules Instructor / Rules Officer | Umler | Reviewed incident summary | Root cause analysis report | Root cause identified within 72 hours of review completion | Inaccurate root cause identification can lead to ineffective corrective measures. | Y | N |
| 1.5 | Develop Corrective Actions | Service Design / Network Planning Analyst | NetControl | Root cause analysis report | Corrective action plan | Corrective actions developed within 1 week of root cause identification | Lack of effective corrective actions can result in recurring incidents. | N | Y |
| 1.6 | Implement Corrective Actions | VP Network Planning & Operations | NetControl | Corrective action plan | Implemented corrective actions | Corrective actions implemented within 2 weeks of development | Delayed implementation can prolong the risk period. | Y | N |
| 1.7 | Monitor Corrective Actions | Train Dispatcher | NetControl | Implemented corrective actions | Monitoring report | Corrective actions monitored weekly for effectiveness | Inadequate monitoring can lead to unaddressed issues. | N | Y |
| 1.8 | Review and Update Policies | Chief Safety Officer / VP Safety | C3RS | Monitoring report | Updated safety policies | Policies reviewed and updated within 1 month of monitoring completion | Outdated policies can fail to address emerging safety concerns. | Y | N |
| 1.9 | Notify Affected Parties | Rules Officer | C3RS | Updated safety policies | Notification of affected parties | Notifications sent within 2 weeks of policy update | Non-communication can lead to confusion and non-compliance. | N | Y |
| 1.10 | Close Incident Case | Chief Safety Officer / VP Safety | C3RS | Notification of affected parties | Closed incident case | Incident cases closed within 3 months of initial report | Open cases can lead to ongoing safety risks. | Y | N |
| 1.11 | Conduct Post-Incident Review | Rules Instructor / Rules Officer | Umler | Closed incident case | Post-incident review report | Post-incident reviews conducted biannually | Lack of periodic reviews can miss evolving safety issues. | Y | N |
| 1.12 | Update Training Programs | Service Design / Network Planning Analyst | NetControl | Post-incident review report | Updated training programs | Training programs updated within 6 months of post-incident review | Outdated training can result in staff not being adequately prepared. | N | Y |
📊 KPIs & Risk Register
KPIs
Time to identify and report a close call under 10 minutes Close call reports submitted within 24 hours of occurrence Incident review completed within 48 hours of reporting Root cause identified within 72 hours of review completion Corrective actions developed within 1 week of root cause identification Corrective actions implemented within 2 weeks of development Corrective actions monitored weekly for effectiveness Policies reviewed and updated within 1 month of monitoring completion Notifications sent within 2 weeks of policy update Incident cases closed within 3 months of initial report Post-incident reviews conducted biannually Training programs updated within 6 months of post-incident review
Key Risks
Delayed reporting can lead to oversight of potential safety issues. Missing or incomplete reports can hinder safety investigations. Inaccurate root cause identification can lead to ineffective corrective measures. Lack of effective corrective actions can result in recurring incidents. Non-communication can lead to confusion and non-compliance.
Swim Lanes
Locomotive Engineer · 1.1 Train Dispatcher · 1.2, 1.6, 1.9 Chief Safety Officer / VP Safety · 1.3, 1.8 Rules Instructor / Rules Officer · 1.4, 1.11 Service Design / Network Planning Analyst · 1.5, 1.12