RR-07 RR-07-09-01 — STB Regulatory Filings and Annual Reporting
This process involves the preparation and submission of annual regulatory filings to the Surface Transportation Board (STB) by a US Class I freight railroad. It ensures compliance with STB regulations and includes data collection, review, and reporting.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-07-09-01 |
|---|---|
| Domain Family | CORPORATE |
| L1 Domain | Safety & Regulatory Compliance |
| L2 Process Group | STB Regulatory Filings and Annual Reporting |
| Trigger | The start of each calendar year or as required by STB notifications. |
| Outcome | Successful completion results in accurate and timely submission of all required regulatory filings to the STB, ensuring ongoing compliance and avoiding penalties. |
| Systems | NetControl I-ETMS C3RS GCOR TRAIN II CHARM |
| Regulatory Hooks | 49 CFR Part 1180 GCOR |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Initiate Annual Reporting Process | Chief Safety Officer / VP Safety | GCOR | Annual reporting guidelines from STB | Internal notification to start annual reporting process | Compliance with STB deadlines | Late initiation due to internal delays | N | N |
| 1.2 | Data Collection for Annual Report | Service Design / Network Planning Analyst | NetControl, I-ETMS | Operational data from various systems | Compiled annual report data | Accuracy of collected data | Data discrepancies or missing information | N | Y |
| 1.3 | Review and Validate Data | Rules Officer | C3RS, GCOR | Compiled annual report data | Validated annual report data | Data validation accuracy rate | Errors in data validation | Y | Y |
| 1.4 | Prepare Regulatory Filings | Train Dispatcher | TRAIN II, CHARM | Validated annual report data | Draft regulatory filings | Timeliness of filing preparation | Complexity in preparing multiple filings | N | Y |
| 1.5 | Review and Finalize Filings | Chief Dispatcher | GCOR, Umler | Draft regulatory filings | Finalized regulatory filings | Number of revisions required | Inconsistent data interpretation | Y | N |
| 1.6 | Submit Filings to STB | VP Network Planning & Operations | NetControl, I-ETMS | Finalized regulatory filings | Confirmation of submission | Submission accuracy rate | Technical issues during submission | N | Y |
| 1.7 | Monitor STB Response | Rules Instructor / Rules Officer | GCOR, C3RS | Confirmation of submission | STB response and feedback | Response time from STB | Delayed responses from STB | Y | N |
| 1.8 | Address STB Feedback | Service Design / Network Planning Analyst | NetControl, I-ETMS | STB response and feedback | Corrected filings if necessary | Number of corrections made | Complex STB feedback to address | Y | Y |
| 1.9 | Final Submission and Documentation | VP Network Planning & Operations | NetControl, I-ETMS | Corrected filings if necessary | Final submission to STB with documentation | Total time from initiation to final submission | Multiple submissions due to errors | N | Y |
| 1.10 | Internal Review and Approval | Chairman, President and CEO | GCOR | Final submission to STB with documentation | Approval for final submission | Time taken for internal review | Delays in obtaining senior management approval | Y | N |
| 1.11 | Final Submission to STB | VP Network Planning & Operations | NetControl, I-ETMS | Approval for final submission | Confirmation of final submission | Submission accuracy rate | Technical issues during final submission | N | Y |
| 1.12 | Post-Submission Review and Documentation | Rules Officer | GCOR, C3RS | Confirmation of final submission | Post-submission review documentation | Number of post-submission issues identified | Identifying and addressing post-submission issues | Y | N |
📊 KPIs & Risk Register
KPIs
Compliance with STB deadlines Accuracy of collected data Data validation accuracy rate Timeliness of filing preparation Number of revisions required Submission accuracy rate Response time from STB Number of corrections made Total time from initiation to final submission Time taken for internal review Number of post-submission issues identified
Key Risks
Data discrepancies or missing information Errors in data validation Complexity in preparing multiple filings Technical issues during submission Delays in obtaining senior management approval Identifying and addressing post-submission issues
Swim Lanes
Chief Safety Officer / VP Safety · 1.1, 1.3 Service Design / Network Planning Analyst · 1.2, 1.4, 1.8, 1.9, 1.11 Train Dispatcher · 1.4 Chief Dispatcher · 1.5, 1.7 Rules Instructor / Rules Officer · 1.3, 1.7, 1.12 VP Network Planning & Operations · 1.6, 1.9, 1.10, 1.11 Chairman, President and CEO · 1.10