RR-03 RR-03-05-01 — Air Brake Tests & Departure Inspection
The Air Brake Tests & Departure Inspection process ensures that all freight cars in the terminal are inspected for air brake compliance and safety before departure. This process involves multiple steps including visual inspection, testing, documentation, and clearance.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-03-05-01 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Terminal & Yard Operations |
| L2 Process Group | Air Brake Tests & Departure Inspection |
| Trigger | Train arrival at the Bailey Yard (North Platte, NE) with a manifest of freight cars requiring air brake tests. |
| Outcome | All freight cars pass the air brake test and receive necessary clearances for departure, ensuring compliance with safety regulations. |
| Systems | NetControl I-ETMS Umler PS Technology EHMS |
| Regulatory Hooks | 49 CFR Part 232 GCOR |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Train Arrival Notification | Yardmaster | NetControl | Train arrival manifest | Arrival notification to the Yardmaster's console | Time from train arrival to first car inspection < 10 minutes | Delayed train arrivals affecting yard operations | N | Y |
| 1.2 | Car Inspection Preparation | Car Inspector (Carman) | Umler | Train arrival manifest and Umler database | Inspection checklist for each car | 100% accurate inspection checklists generated within 5 minutes | Missing or inaccurate manifests | N | Y |
| 1.3 | Visual Inspection of Cars | Car Inspector (Carman) | Machine Vision portals | Inspection checklist and car images | Visual inspection report | 95% accuracy in visual inspections within 2 minutes per car | Defective brakes not immediately visible | N | Y |
| 1.4 | Air Brake Test Execution | Car Inspector (Carman) | Wabtrax | Visual inspection report and Wabtrax test equipment | Air brake test results | 100% successful air brake tests within 5 minutes per car | Defective brakes causing failed tests | Y | Y |
| 1.5 | Review of Air Brake Test Results | Car Inspector (Carman) | Umler | Air brake test results and Umler database | Test result summary | 90% accuracy in test result review within 3 minutes | Incorrect interpretation of test data | Y | Y |
| 1.6 | Defective Brake Repair Notification | Car Inspector (Carman) | PS Technology | Test result summary and PS Technology system | Repair notification to the Maintenance Department | 100% repair notifications within 2 minutes of identifying defects | Delayed repairs affecting train schedules | N | Y |
| 1.7 | Clearance for Departure | Yardmaster | NetControl | Test result summary and clearance request | Departure clearance order | 95% clearance orders issued within 1 minute of receiving results | Incorrect or delayed clearances | N | Y |
| 1.8 | Train Departure Preparation | Switchman/Switch Foreman | Hump yard (generic classification technology) | Departure clearance order and train schedule | Prepared departure track with all cars secured | 100% prepared tracks within 5 minutes of receiving clearance | Track preparation delays due to equipment issues | N | Y |
| 1.9 | Train Departure Notification | Yardmaster | NetControl | Prepared departure track and train schedule | Departure notification to the Harriman Dispatching Center (HDC) | 90% timely notifications within 2 minutes of departure | Delayed notifications affecting dispatch coordination | N | Y |
| 1.10 | Post-Departure Review | Car Inspector (Carman) | Umler | Departure notification and Umler database | Post-departure review report | 100% accurate post-departure reviews within 3 minutes of departure | Inaccurate or incomplete reviews | Y | Y |
| 1.11 | Update Maintenance Records | Car Inspector (Carman) | EHMS | Post-departure review report and EHMS system | Updated maintenance records for each car | 95% updated records within 1 minute of completing reviews | Delayed record updates affecting future inspections | N | Y |
| 1.12 | Final Departure Confirmation | Yardmaster | NetControl | Updated maintenance records and NetControl system | Final departure confirmation to the HDC | 90% final confirmations within 2 minutes of updating records | Delayed confirmations affecting overall yard operations | N | Y |
📊 KPIs & Risk Register
KPIs
Terminal dwell under 24 hours Train speed above 20 mph 95% accuracy in visual inspections within 2 minutes per car 100% successful air brake tests within 5 minutes per car 90% clearance orders issued within 1 minute of receiving results 100% prepared tracks within 5 minutes of receiving clearance
Key Risks
Air brake test defect released to the road Defective brakes causing failed tests Incorrect interpretation of test data Delayed repairs affecting train schedules Track preparation delays due to equipment issues Delayed notifications affecting dispatch coordination Inaccurate or incomplete reviews Delayed record updates affecting future inspections
Swim Lanes
Yardmaster · 1.1, 1.7, 1.9, 1.12 Car Inspector (Carman) · 1.2, 1.3, 1.4, 1.5, 1.6, 1.10, 1.11 Switchman/Switch Foreman · 1.8