US Class I Rail Process Wiki Dispatching & Train Movement › Territory Dispatching (CTC)
🗺 BPMN Process Flow
RR-02-01-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-02-01-01
Domain FamilyNETWORK & PLANNING
L1 DomainDispatching & Train Movement
L2 Process GroupTerritory Dispatching (CTC)
TriggerTrain arrival at a terminal or yard, or receipt of a new train manifest.
OutcomeSuccessful completion results in the timely departure of trains from the terminal or yard with accurate routing and scheduling.
SystemsNetControl CADx PS Technology (PST) EHMS
Regulatory Hooks49 CFR Part 232 GCOR
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Receive Train Manifest Train Dispatcher NetControl / CADx Train manifest Updated train schedule Train arrival time accuracy within 5 minutes Late or inaccurate train manifests N Y
1.2 Verify Train Status Control Operator NetControl / CADx Train schedule Train status report Train status verification completion within 10 minutes Inaccurate train status reporting Y N
1.3 Conduct Pre-Departure Inspection Car Inspector (Carman) EHMS Train schedule Inspection report Pre-departure inspection completion within 30 minutes Defective equipment release to the road Y Y
1.4 Update Train Schedule Train Dispatcher NetControl / CADx Inspection report Updated train schedule Schedule update completion within 5 minutes Inaccurate schedule updates N Y
1.5 Assign Crew Crew Caller / Crew Dispatcher PS Technology (PST) Updated train schedule Crew assignment confirmation Crew assignment completion within 15 minutes Inadequate crew availability Y N
1.6 Prepare Train for Departure Locomotive Engineer NetControl / CADx Crew assignment confirmation Train departure readiness report Train preparation completion within 20 minutes Equipment malfunction during preparation Y N
1.7 Conduct Air Brake Test Brakeman/Trainman NetControl / CADx Train departure readiness report Air brake test results Air brake test completion within 10 minutes Defective air brakes released to the road Y Y
1.8 Finalize Departure Train Dispatcher NetControl / CADx Air brake test results Departure authorization Departure authorization completion within 5 minutes Unauthorized train departures N Y
1.9 Monitor Train Movement Control Operator NetControl / CADx Departure authorization Train movement report Train movement monitoring completion within 5 minutes Lack of real-time train tracking Y N
1.10 Update Train Position Train Dispatcher NetControl / CADx Train movement report Updated train position Train position update completion within 5 minutes Inaccurate train positioning N Y
1.11 Conduct Post-Departure Inspection Car Inspector (Carman) EHMS Updated train position Post-departure inspection report Post-departure inspection completion within 30 minutes Defective equipment release to the road Y N
1.12 Update Train Status Control Operator NetControl / CADx Post-departure inspection report Updated train status Train status update completion within 5 minutes Inaccurate train status reporting N Y
📊 KPIs & Risk Register

KPIs

Train arrival time accuracy within 5 minutes Pre-departure inspection completion within 30 minutes Crew assignment completion within 15 minutes Train preparation completion within 20 minutes Air brake test completion within 10 minutes Departure authorization completion within 5 minutes Train movement monitoring completion within 5 minutes Train position update completion within 5 minutes Post-departure inspection completion within 30 minutes Train status update completion within 5 minutes

Key Risks

Defective equipment release to the road Inaccurate schedule updates Equipment malfunction during preparation Unauthorized train departures Lack of real-time train tracking

Swim Lanes

Train Dispatcher · 1.1, 1.4, 1.8, 1.10, 1.12 Control Operator · 1.2, 1.9 Car Inspector (Carman) · 1.3, 1.11 Crew Caller / Crew Dispatcher · 1.5 Locomotive Engineer · 1.6 Brakeman/Trainman · 1.7