US Class I Rail Process Wiki Interline, Equipment & Car Management › Private and Foreign Car Handling
🗺 BPMN Process Flow
RR-11-05-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-11-05-01
Domain FamilyNETWORK & PLANNING
L1 DomainInterline, Equipment & Car Management
L2 Process GroupPrivate and Foreign Car Handling
TriggerReceipt of a manifest detailing private or foreign cars requiring handling at a terminal or yard.
OutcomeSuccessful completion involves the safe and efficient transfer, inspection, and settlement of private and foreign cars according to established protocols and regulatory requirements.
SystemsUmler CHARM TRAIN II EHMS Interline Settlement System (ISS) / Switching Settlement Data Exchange (SSDX) NetControl I-ETMS
Regulatory Hooks49 CFR Part 232 GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Receive Manifest Car Hire / Interline Settlement Analyst Umler Manifest detailing private or foreign cars Updated Umler record Manifest received within 1 hour of arrival Delayed manifest receipt affecting subsequent operations N Y
1.2 Inspect Cars Car Inspector (Carman) EHMS Private or foreign cars Inspection report 95% of inspections completed within 3 hours Inaccurate inspection reports leading to re-inspections Y N
1.3 Update Umler Record Equipment Registration / Umler Data Analyst Umler Inspection report Updated Umler record with inspection status 100% accurate updates within 2 hours of inspection completion Incorrect updates causing discrepancies in equipment tracking N Y
1.4 Prepare for Transfer Train Dispatcher NetControl Updated Umler record Service design plan 90% of transfers completed within 24 hours Inefficient service design leading to delays Y N
1.5 Conduct Air Brake Test Brakeman/Trainman Wabtrax Private or foreign cars Air brake test report 98% of air brake tests passed on first attempt Defective brakes released to the road causing safety hazards Y Y
1.6 Transfer Cars Locomotive Engineer I-ETMS Service design plan Train movement log Average train speed above 20 mph during transfer Slow-moving trains causing delays N Y
1.7 Settle Accounts Car Hire / Interline Settlement Analyst Interline Settlement System (ISS) / Switching Settlement Data Exchange (SSDX) Train movement log Settlement report 95% of settlements completed within 48 hours Delayed settlements affecting cash flow Y N
1.8 Update CHARM Record Car Hire / Interline Settlement Analyst CHARM Settlement report Updated CHARM record 100% accurate updates within 24 hours of settlement completion Incorrect updates causing discrepancies in accounting N Y
1.9 Review and Adjust VP Network Planning & Operations TRAIN II Settlement report, Umler record Adjusted service plan 90% of adjustments made within 7 days of review Inefficient adjustments leading to ongoing delays Y N
1.10 Final Inspection Car Inspector (Carman) EHMS Private or foreign cars after transfer Final inspection report 95% of final inspections completed within 2 hours Inaccurate final inspections leading to re-inspections Y N
1.11 Update Umler Record Again Equipment Registration / Umler Data Analyst Umler Final inspection report Updated Umler record with final status 100% accurate updates within 2 hours of final inspection completion Incorrect updates causing discrepancies in equipment tracking N Y
1.12 Close Process Car Hire / Interline Settlement Analyst Interline Settlement System (ISS) / Switching Settlement Data Exchange (SSDX) Final inspection report, updated Umler record Closed process record 100% of processes closed within 24 hours of final inspection Open processes causing ongoing tracking issues N Y
📊 KPIs & Risk Register

KPIs

Manifest received within 1 hour of arrival 95% of inspections completed within 3 hours 100% accurate updates within 2 hours of inspection completion 90% of transfers completed within 24 hours 98% of air brake tests passed on first attempt Average train speed above 20 mph during transfer 95% of settlements completed within 48 hours 100% accurate updates within 24 hours of settlement completion 90% of adjustments made within 7 days of review 95% of final inspections completed within 2 hours 100% accurate updates within 2 hours of final inspection completion 100% of processes closed within 24 hours of final inspection

Key Risks

Air brake test defect released to the road Inaccurate inspection reports leading to re-inspections Incorrect updates causing discrepancies in equipment tracking Inefficient service design leading to delays Slow-moving trains causing delays Delayed settlements affecting cash flow Incorrect updates causing discrepancies in accounting Inefficient adjustments leading to ongoing delays

Swim Lanes

Car Hire / Interline Settlement Analyst · 1.1, 1.7, 1.8, 1.12 Equipment Registration / Umler Data Analyst · 1.3, 1.11 Car Inspector (Carman) · 1.2, 1.10 Train Dispatcher · 1.4 Locomotive Engineer · 1.6 VP Network Planning & Operations · 1.9