US Class I Rail Process Wiki Mechanical & Rolling Stock › Railcar Repair & Billing Repair Card Processing
🗺 BPMN Process Flow
RR-05-03-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-05-03-02
Domain FamilyOPERATIONS
L1 DomainMechanical & Rolling Stock
L2 Process GroupRailcar Repair & Billing Repair Card Processing
TriggerDetection of railcar defects by wayside defect detector networks or during routine inspections.
OutcomeA repaired and billed railcar ready for return to service, with accurate records maintained for regulatory compliance.
SystemsWayside defect detector network Downing B. Jenks Shop Umler TRAIN II NetControl I-ETMS
Regulatory Hooks49 CFR Part 232 49 CFR Part 215 AAR Interchange Rules (Rule 88 and related)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Defect Detection Notification Service Operator Wayside defect detector network Defect report from wayside detectors Notification to Downing B. Jenks Shop Time from detection to notification < 1 hour Delayed notifications due to network issues N Y
1.2 Initial Assessment Machinist Downing B. Jenks Shop Defect report and railcar details Assessment report with repair scope Assessment completed within 2 hours Inaccurate assessment leading to over/under repairs Y N
1.3 Repair Authorization Manager-Mechanical Maintenance Umler Assessment report Repair authorization order Authorization issued within 4 hours of assessment Delays in obtaining necessary authorizations Y Y
1.4 Repair Execution Machinist, Electrician (locomotive) Downing B. Jenks Shop Repair authorization order Completed repair report Repair completed within 24 hours of authorization Delays in obtaining necessary parts or tools N Y
1.5 Post-Repair Inspection Machinist, Electrician (locomotive) Downing B. Jenks Shop Completed repair report Inspection report with compliance status Inspection completed within 2 hours of repair completion Non-compliant repairs passing inspection Y N
1.6 Billing Preparation Manager-Mechanical Maintenance CHARM, TRAIN II Inspection report and repair details Billing invoice Invoice generated within 24 hours of inspection completion Incorrect billing due to missing or inaccurate data Y Y
1.7 Billing Review Senior Manager-Mechanical Engineering CHARM, TRAIN II Billing invoice Approved billing record Review completed within 48 hours of invoice generation Overcharging or undercharging due to errors Y N
1.8 Repair Card Update Service Operator Umler, TRAIN II Approved billing record Updated repair card Card updated within 24 hours of review approval Delayed updates affecting future maintenance planning N Y
1.9 Return to Service Notification Service Operator NetControl, I-ETMS Updated repair card Notification to train dispatcher Notification sent within 2 hours of card update Lost or delayed notifications affecting train schedules N Y
1.10 Service Confirmation Train Dispatcher, Control Operator NetControl, I-ETMS Return to service notification Confirmation of railcar readiness Confirmation received within 1 hour of notification Miscommunication leading to incorrect scheduling Y N
1.11 Final Inspection Machinist, Electrician (locomotive) Downing B. Jenks Shop Confirmation of railcar readiness Final inspection report Inspection completed within 2 hours of confirmation Non-compliant railcars passing final inspection Y Y
1.12 Completion Record Manager-Mechanical Maintenance Umler, TRAIN II Final inspection report Repair completion record Record updated within 24 hours of final inspection Delayed updates affecting future maintenance tracking N Y
📊 KPIs & Risk Register

KPIs

Time from detection to notification < 1 hour Assessment completed within 2 hours Authorization issued within 4 hours of assessment Repair completed within 24 hours of authorization Inspection completed within 2 hours of repair completion Invoice generated within 24 hours of inspection completion Review completed within 48 hours of invoice generation Card updated within 24 hours of review approval Notification sent within 2 hours of card update Confirmation received within 1 hour of notification Inspection completed within 2 hours of confirmation Record updated within 24 hours of final inspection

Key Risks

Non-compliant repairs passing inspection Overcharging or undercharging due to errors Miscommunication leading to incorrect scheduling Non-compliant railcars passing final inspection Delayed updates affecting future maintenance tracking

Swim Lanes

Service Operator · 1.1, 1.8, 1.9 Machinist, Electrician (locomotive) · 1.2, 1.4, 1.5, 1.11 Manager-Mechanical Maintenance · 1.3, 1.6, 1.12 Senior Manager-Mechanical Engineering · 1.7