RR-02 RR-02-05-02 — Enroute Exception Handling (PTC failure, mechanical, weather)
This process handles enroute exceptions for trains experiencing PTC failures, mechanical issues, or adverse weather conditions on a US Class I freight railroad.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-02-05-02 |
|---|---|
| Domain Family | NETWORK & PLANNING |
| L1 Domain | Dispatching & Train Movement |
| L2 Process Group | Enroute Exception Handling (PTC failure, mechanical, weather) |
| Trigger | Detection of a PTC failure, mechanical malfunction, or severe weather condition affecting train movement. |
| Outcome | Safe and efficient rerouting or resolution of the enroute exception to minimize delays and ensure compliance with regulations. |
| Systems | NetControl I-ETMS PS Technology |
| Regulatory Hooks | 49 CFR Part 232 GCOR 6.28 49 CFR Part 217 49 CFR Part 220 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Identify Exception | Train Dispatcher | NetControl / CADx | Real-time train data, sensor alerts | Exception report | Time to identify exception < 5 minutes | Delayed identification can lead to cascading effects on the network. | Y | N |
| 1.2 | Assess Impact | Chief Dispatcher | NetControl / CADx, I-ETMS | Exception report, current train schedule, network status | Impact assessment report | Time to assess impact < 10 minutes | Overlooking the true extent of the issue can lead to inadequate responses. | Y | N |
| 1.3 | Determine Mitigation Strategy | Train Dispatcher | NetControl / CADx, I-ETMS | Impact assessment report | Mitigation strategy plan | Time to determine strategy < 15 minutes | Inadequate mitigation can cause further disruptions. | Y | N |
| 1.4 | Notify Affected Parties | Train Dispatcher, Crew Caller / Crew Dispatcher | NetControl / CADx, PS Technology | Mitigation strategy plan | Notification to train crew and affected stations | Time to notify all parties < 20 minutes | Failure to notify can lead to confusion and unsafe operations. | N | Y |
| 1.5 | Execute Mitigation Strategy | Train Dispatcher, Yardmaster, Switchman/Switch Foreman | NetControl / CADx, I-ETMS | Mitigation strategy plan | Updated train schedule and status | Time to execute mitigation < 30 minutes | Poor execution can exacerbate the problem. | Y | N |
| 1.6 | Monitor and Adjust | Train Dispatcher, Control Operator | NetControl / CADx, I-ETMS | Real-time train data, sensor alerts | Adjustments to mitigation strategy if necessary | Continuous monitoring throughout the process | Lack of continuous monitoring can lead to unresolved issues. | Y | N |
| 1.7 | Verify Resolution | Train Dispatcher, Control Operator | NetControl / CADx, I-ETMS | Real-time train data, sensor alerts | Resolution verification report | Time to verify resolution < 5 minutes | Failure to verify can result in lingering issues. | Y | N |
| 1.8 | Document Incident | Train Dispatcher, Control Operator | NetControl / CADx, I-ETMS | Resolution verification report | Incident documentation | Time to document incident < 10 minutes | Incomplete documentation can lead to future incidents. | N | Y |
| 1.9 | Review and Improve | VP Network Planning & Operations, Service Design / Network Planning Analyst | NetControl (service design use), I-ETMS | Incident documentation | Process improvement recommendations | Time to review and improve < 2 weeks | Lack of process improvement can lead to recurring issues. | Y | N |
| 1.10 | Implement Improvements | VP Network Planning & Operations, Service Design / Network Planning Analyst | NetControl (service design use), I-ETMS | Process improvement recommendations | Updated process and procedures | Time to implement improvements < 4 weeks | Delayed implementation can result in continued inefficiencies. | N | Y |
| 1.11 | Conduct Post-Incident Review | Train Dispatcher, Control Operator | NetControl / CADx, I-ETMS | Incident documentation, process improvement recommendations | Post-incident review report | Time to conduct post-incident review < 1 week | Inadequate review can lead to missed opportunities for learning. | Y | N |
| 1.12 | Update Training Materials | Train Dispatcher, Control Operator | NetControl / CADx, I-ETMS | Post-incident review report | Updated training materials and procedures | Time to update training materials < 2 weeks | Outdated training can lead to future incidents. | N | Y |
📊 KPIs & Risk Register
KPIs
Time to identify exception < 5 minutes Time to assess impact < 10 minutes Time to determine strategy < 15 minutes Time to notify all parties < 20 minutes Time to execute mitigation < 30 minutes Continuous monitoring throughout the process Time to verify resolution < 5 minutes Time to document incident < 10 minutes Time to review and improve < 2 weeks Time to implement improvements < 4 weeks Time to conduct post-incident review < 1 week Time to update training materials < 2 weeks
Key Risks
Air brake test defect released to the road Inadequate communication leading to unsafe operations Failure to execute mitigation strategy effectively Lack of continuous monitoring during the process Delayed implementation of process improvements
Swim Lanes
Train Dispatcher · 1.1, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8 Chief Dispatcher · 1.2 Yardmaster · 1.5 Switchman/Switch Foreman · 1.5 VP Network Planning & Operations, Service Design / Network Planning Analyst · 1.9, 1.10