US Class I Rail Process Wiki Crew Management › Hours of Service Compliance & Records
🗺 BPMN Process Flow
RR-04-03-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-04-03-01
Domain FamilyOPERATIONS
L1 DomainCrew Management
L2 Process GroupHours of Service Compliance & Records
TriggerThe initiation of a new train crew assignment or the start of a shift.
OutcomeSuccessful completion produces accurate HOS records, ensuring adherence to regulatory requirements and maintaining crew safety and productivity.
SystemsNetControl I-ETMS PS Technology (PST) HASTUS CloudMoyo Crew Management (CCM)
Regulatory Hooks49 CFR Part 228 GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Crew Assignment Train Dispatcher NetControl Shift schedule and crew availability data Assigned train crew roster On-time crew assignment rate > 95% Inadequate crew availability leading to delays N Y
1.2 HOS Log Initialization Crew Caller / Crew Dispatcher PS Technology (PST) Assigned train crew roster Initialized HOS log for the shift Complete HOS logs within 10 minutes of assignment > 98% Delayed log initialization affecting real-time monitoring N Y
1.3 Train Departure Notification Locomotive Engineer I-ETMS Departure time and train details Updated HOS log with departure timestamp Accurate departure time recording > 99% Incorrect or missing timestamps affecting compliance N Y
1.4 Duty Status Update Conductor HASTUS Current duty status (e.g., on-duty, off-duty) Updated HOS log with duty status Real-time duty status updates > 95% Inaccurate or delayed status updates leading to violations Y Y
1.5 Break Notification Brakeman/Trainman PS Technology (PST) Break start and end times Updated HOS log with break details Complete break records within 5 minutes > 98% Omitted or incorrect break records affecting compliance Y Y
1.6 Train Arrival Notification Locomotive Engineer I-ETMS Arrival time and train details Updated HOS log with arrival timestamp Accurate arrival time recording > 99% Incorrect or missing timestamps affecting compliance N Y
1.7 Daily Log Review Trainmaster CloudMoyo Crew Management (CCM) HOS log for the day Compliance report and any necessary corrections Daily log review completion rate > 98% Incomplete or inaccurate logs requiring extensive manual correction Y Y
1.8 Exception Handling Crew Caller / Crew Dispatcher PS Technology (PST) Compliance report and exceptions Corrected HOS log with exception notes Exception resolution rate within 24 hours > 95% Delayed exception handling leading to potential violations Y N
1.9 Weekly Compliance Report Superintendent (Division) CloudMoyo Crew Management (CCM) Daily compliance reports Weekly HOS compliance summary Weekly report accuracy > 98% Inaccurate or incomplete weekly summaries affecting management oversight N Y
1.10 Monthly Review Meeting Local Chairman / General Chairman (union) NetControl Weekly compliance summary and any issues Action plan for addressing non-compliance issues Participation rate in monthly review meetings > 95% Low participation leading to missed opportunities for improvement Y N
1.11 Annual Audit Chairman, President and CEO (plan sponsor level) CloudMoyo Crew Management (CCM) Monthly review meeting outcomes and compliance data Annual HOS audit report and recommendations Audit completion rate > 98% Delayed audits affecting overall regulatory compliance Y N
1.12 Continuous Improvement Plan VP Network Planning & Operations NetControl Annual audit report and recommendations Updated HOS management plan Plan update rate > 95% Stale plans leading to ongoing compliance issues Y N
📊 KPIs & Risk Register

KPIs

On-time crew assignment rate > 95% Complete HOS logs within 10 minutes of assignment > 98% Accurate departure time recording > 99% Real-time duty status updates > 95% Complete break records within 5 minutes > 98% Accurate arrival time recording > 99% Daily log review completion rate > 98% Exception resolution rate within 24 hours > 95% Weekly report accuracy > 98% Participation rate in monthly review meetings > 95% Audit completion rate > 98% Plan update rate > 95%

Key Risks

Air brake test defect released to the road Inadequate crew availability leading to delays Incorrect or missing timestamps affecting compliance Omitted or incorrect break records affecting compliance Incomplete or inaccurate weekly summaries affecting management oversight

Swim Lanes

Train Dispatcher · 1.1, 1.3 Crew Caller / Crew Dispatcher · 1.2, 1.5, 1.8 Locomotive Engineer · 1.3, 1.6 Conductor · 1.4 Brakeman/Trainman · 1.5 Trainmaster · 1.7 Superintendent (Division) · 1.9 Local Chairman / General Chairman (union) · 1.10 Chairman, President and CEO (plan sponsor level) · 1.11 VP Network Planning & Operations · 1.12