US Class I Rail Process Wiki Crew Management › Rest, Attendance and Predictable Scheduling Programs
🗺 BPMN Process Flow
RR-04-04-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-04-04-02
Domain FamilyOPERATIONS
L1 DomainCrew Management
L2 Process GroupRest, Attendance and Predictable Scheduling Programs
TriggerWeekly schedule review initiated by the Trainmaster or Superintendent (Division).
OutcomeA well-rested crew ready for duty, accurate attendance records, and a predictable scheduling plan that adheres to regulatory requirements and maximizes productivity.
SystemsCrewPro trackHOS-class HOS monitoring tools NetControl I-ETMS EHMS PS Technology (PST)
Regulatory Hooks49 CFR Part 228 49 CFR Part 232 FRA Train Crew Staffing Rule (2024) Railway Labor Act (45 U.S.C. § 151 et seq.)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Review Crew Schedules Trainmaster CrewPro Weekly schedule template Updated crew schedules Schedule adherence rate above 95% Balancing rest periods with operational needs Y N
1.2 Conduct Rest Compliance Check Crew Caller / Crew Dispatcher trackHOS-class HOS monitoring tools Updated crew schedules Rest compliance report Rest compliance rate above 98% Handling non-compliance due to unforeseen circumstances N Y
1.3 Update Attendance Records Train Dispatcher CrewPro Rest compliance report Updated attendance records Attendance accuracy rate above 99% Accurate tracking of crew movements N N
1.4 Review Terminal Dwell Times Yardmaster NetControl Updated attendance records Terminal dwell analysis report Terminal dwell under 24 hours Minimizing terminal delays Y N
1.5 Adjust Schedules Based on Dwell Times Superintendent (Division) CrewPro Terminal dwell analysis report Adjusted crew schedules Schedule flexibility index above 80% Balancing schedule adjustments with operational constraints Y Y
1.6 Monitor Train Speeds Train Dispatcher I-ETMS Adjusted crew schedules Train speed monitoring report Train speed above 20 mph Ensuring safe and efficient train operations N Y
1.7 Update Equipment Health Records Locomotive Engineer EHMS Train speed monitoring report Updated equipment health records Equipment reliability rate above 95% Maintaining optimal equipment performance N N
1.8 Review Crew Attendance for the Week Trainmaster CrewPro Updated equipment health records Weekly attendance summary Attendance consistency rate above 97% Managing crew absences and tardiness Y N
1.9 Adjust Schedules for Next Week Superintendent (Division) CrewPro Weekly attendance summary Adjusted crew schedules for next week Predictable scheduling adherence rate above 90% Ensuring consistent and predictable crew rotations Y Y
1.10 Finalize Schedules for Next Week Train Dispatcher CrewPro Adjusted crew schedules for next week Finalized crew schedules for next week Schedule finalization time under 24 hours Efficiently preparing schedules for the upcoming week N N
1.11 Notify Crews of Schedule Changes Crew Caller / Crew Dispatcher PS Technology (PST) Finalized crew schedules for next week Notification logs Notification accuracy rate above 98% Ensuring all crews receive accurate and timely notifications N Y
1.12 Review and Report on Process Performance Superintendent (Division) CrewPro Notification logs Process performance report Overall process efficiency index above 85% Continuous improvement of the rest, attendance, and scheduling process Y N
📊 KPIs & Risk Register

KPIs

Schedule adherence rate above 95% Rest compliance rate above 98% Attendance accuracy rate above 99% Terminal dwell under 24 hours Train speed above 20 mph Equipment reliability rate above 95% Attendance consistency rate above 97% Predictable scheduling adherence rate above 90% Schedule finalization time under 24 hours Notification accuracy rate above 98% Overall process efficiency index above 85%

Key Risks

Non-compliance with rest periods leading to fatigue and reduced productivity Terminal delays affecting overall schedule adherence Equipment failures due to inadequate maintenance Crew absences impacting operational continuity Inaccurate notifications causing confusion among crew members

Swim Lanes

Trainmaster · 1.1, 1.8 Crew Caller / Crew Dispatcher · 1.2, 1.11 Train Dispatcher · 1.3, 1.6, 1.10 Yardmaster · 1.4 Superintendent (Division) · 1.5, 1.9 Locomotive Engineer · 1.7