US Class I Rail Process Wiki Engineering: Track, Structures & Signals › Vegetation, Drainage and Environmental Field Work
🗺 BPMN Process Flow
RR-06-11-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-06-11-01
Domain FamilyOPERATIONS
L1 DomainEngineering: Track, Structures & Signals
L2 Process GroupVegetation, Drainage and Environmental Field Work
TriggerScheduled maintenance or detection of vegetation encroachment via Wabtrax or ATIP inspections.
OutcomeCompleted vegetation, drainage, and environmental field work that meets regulatory standards and improves track safety.
SystemsNetControl Wabtrax PS Technology (PST) Umler
Regulatory Hooks49 CFR Part 213 49 CFR Part 236, Subpart I GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Initiate Work Order Track Supervisor NetControl Maintenance schedule or inspection report from Wabtrax/ATIP Work order with task details and safety protocols Work orders issued within 24 hours of detection Delays in issuing work orders can lead to increased risk. N Y
1.2 Assign Crew and Equipment Track Supervisor PS Technology (PST) Work order Crew assignment and equipment dispatch Equipment availability rate above 95% Inadequate equipment can delay work. N Y
1.3 Conduct Pre-Work Inspection Assistant Foreman (track) NetControl Crew assignment and equipment dispatch Pre-work inspection report Inspection compliance rate 100% Non-compliance can lead to safety hazards. Y Y
1.4 Perform Vegetation Management Roadmaster Wabtrax Pre-work inspection report Vegetation management report Vegetation clearance rate above 90% Inadequate vegetation control can obstruct tracks. Y Y
1.5 Perform Drainage Work Roadmaster Wabtrax Vegetation management report Drainage work report Drainage system integrity above 95% Poor drainage can cause track damage. Y Y
1.6 Conduct Post-Work Inspection Assistant Foreman (track) NetControl Drainage work report Post-work inspection report Inspection compliance rate 100% Non-compliance can lead to safety hazards. Y Y
1.7 Update Maintenance Records Track Supervisor Umler Post-work inspection report Updated maintenance records Record update accuracy rate above 98% Inaccurate records can lead to future safety issues. N Y
1.8 Review and Report Track Supervisor NetControl Updated maintenance records Maintenance report Report generation time under 4 hours Delayed reporting can hinder decision-making. Y Y
1.9 Close Work Order Track Supervisor NetControl Maintenance report Closed work order Work order closure rate above 95% Unresolved issues can lead to rework. N Y
1.10 Monitor and Adjust Track Supervisor Wabtrax Closed work order Continuous monitoring report Monitoring frequency rate above 90% Inadequate monitoring can lead to recurrence of issues. Y Y
📊 KPIs & Risk Register

KPIs

Work orders issued within 24 hours of detection Equipment availability rate above 95% Inspection compliance rate 100% Vegetation clearance rate above 90% Drainage system integrity above 95% Record update accuracy rate above 98% Report generation time under 4 hours Work order closure rate above 95% Monitoring frequency rate above 90%

Key Risks

Non-compliance with safety protocols during work Inadequate vegetation control leading to track obstructions Poor drainage causing track damage Delayed reporting affecting decision-making Unresolved issues requiring rework

Swim Lanes

Track Supervisor · 1.1, 1.2, 1.7, 1.8, 1.9 Assistant Foreman (track) · 1.3, 1.6 Roadmaster · 1.4, 1.5, 1.10