US Class I Rail Process Wiki Technology, Data & Cybersecurity › Data Platform, Analytics and ML
🗺 BPMN Process Flow
RR-12-05-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-12-05-01
Domain FamilyCORPORATE
L1 DomainTechnology, Data & Cybersecurity
L2 Process GroupData Platform, Analytics and ML
TriggerScheduled maintenance or system upgrade
OutcomeEnhanced data-driven decision-making, improved train performance, and increased cybersecurity measures.
SystemsNetControl I-ETMS Umler PS Technology (PST) Physics Train Builder EHMS (Equipment Health Management System) TRAIN II (Tele Rail Automated Information Network Phase 2)
Regulatory Hooks49 CFR Part 232 GCOR 6.28 49 U.S.C. § 114(l)(2)(A) 49 CFR Part 220 49 CFR Part 228
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Data Collection Initiation Enterprise Architect / Platform Owner NetControl; PS Technology (PST); Physics Train Builder System configuration and maintenance schedule Data collection plan Data collection coverage rate > 95% Inconsistent data quality across systems Y N
1.2 Data Integration and Cleaning CIO NetControl; I-ETMS; Umler; PS Technology Raw data from various sources Cleaned and integrated dataset Data integration accuracy > 98% Handling missing or corrupted data N Y
1.3 Anomaly Detection and Reporting Service Design / Network Planning Analyst Commit (Situational Awareness Testing program); Machine Vision portals Integrated dataset Anomaly detection report Anomaly detection rate > 90% False positives in anomaly detection Y N
1.4 Security Assessment and Compliance Check Enterprise Architect / Platform Owner Cybersecurity — 'secure-by-design' approach (unbranded) Anomaly detection report Compliance assessment report Compliance rate with TSA Security Directive 1580/82-2022-01 > 95% Ensuring data privacy and security Y Y
1.5 Data Visualization and Reporting CIO NetControl; PS Technology (PST); Physics Train Builder Cleaned and integrated dataset Operational performance dashboard Dashboard usage rate > 80% User adoption of new reporting tools N Y
1.6 Predictive Maintenance Planning VP Network Planning & Operations EHMS (Equipment Health Management System); TRAIN II (Tele Rail Automated Information Network Phase 2) Operational performance dashboard Predictive maintenance plan Maintenance efficiency improvement > 10% Balancing predictive and reactive maintenance Y N
1.7 Resource Allocation Optimization Train Dispatcher; Control Operator; Chief Dispatcher NetControl; I-ETMS Predictive maintenance plan Optimized resource allocation schedule Resource utilization rate > 90% Dynamic scheduling challenges N Y
1.8 Operational Performance Review Chairman, President and CEO (plan sponsor level) NetControl; PS Technology (PST); Physics Train Builder Optimized resource allocation schedule Operational performance review report Train speed above 20 mph > 95% Meeting regulatory speed requirements Y N
1.9 Continuous Improvement Planning Enterprise Architect / Platform Owner NetControl; PS Technology (PST); Physics Train Builder Operational performance review report Continuous improvement plan Improvement cycle time < 30 days Identifying areas for continuous improvement Y Y
1.10 Implementation of Continuous Improvement Measures Service Design / Network Planning Analyst; VP Network Planning & Operations NetControl; I-ETMS Continuous improvement plan Implemented continuous improvement measures Improvement measure adoption rate > 85% Resistance to change N Y
1.11 Monitoring and Evaluation of Improvement Measures CIO; Enterprise Architect / Platform Owner NetControl; PS Technology (PST); Physics Train Builder Implemented continuous improvement measures Evaluation report Improvement measure effectiveness > 75% Measuring the impact of improvements Y N
1.12 Feedback Loop and Iteration Chairman, President and CEO (plan sponsor level) NetControl; PS Technology (PST); Physics Train Builder Evaluation report Updated continuous improvement plan Iteration cycle time < 60 days Iterative process challenges Y Y
📊 KPIs & Risk Register

KPIs

Data collection coverage rate > 95% Data integration accuracy > 98% Anomaly detection rate > 90% Compliance rate with TSA Security Directive 1580/82-2022-01 > 95% Dashboard usage rate > 80% Maintenance efficiency improvement > 10% Resource utilization rate > 90% Train speed above 20 mph > 95% Improvement measure adoption rate > 85% Improvement measure effectiveness > 75% Iteration cycle time < 60 days

Key Risks

Inconsistent data quality across systems Handling missing or corrupted data False positives in anomaly detection Ensuring data privacy and security User adoption of new reporting tools Balancing predictive and reactive maintenance Dynamic scheduling challenges Meeting regulatory speed requirements Resistance to change Measuring the impact of improvements

Swim Lanes

Enterprise Architect / Platform Owner · 1.1, 1.4, 1.9 CIO · 1.2, 1.5, 1.10, 1.11 Service Design / Network Planning Analyst · 1.3, 1.6, 1.12 VP Network Planning & Operations · 1.7 Train Dispatcher; Control Operator; Chief Dispatcher · 1.8 Chairman, President and CEO (plan sponsor level) · 1.12