RR-03 RR-03-04-03 — Local and Industry Switching
This process involves the local switching operations at Bailey Yard in North Platte, NE, where trains are reorganized to prepare for departure or further handling. It includes tasks such as train arrival, classification, and departure, ensuring compliance with safety regulations and operational efficiency.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-03-04-03 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Terminal & Yard Operations |
| L2 Process Group | Local and Industry Switching |
| Trigger | Train arrives at Bailey Yard |
| Outcome | Train is successfully classified and departed from the yard, ready for its next destination. |
| Systems | NetControl Hump yard classification technology PS Technology EHMS CHARM |
| Regulatory Hooks | 49 CFR Part 232 AAR Interchange Rules |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Receive Train Arrival Notification | Yardmaster | NetControl | Train arrival notification from Harriman Dispatching Center | Arrival record in NetControl | Time to receive and acknowledge train arrival < 10 minutes | Delayed notifications affecting yard operations | N | N |
| 1.2 | Assign Yard Crew | Yardmaster | PS Technology | Train arrival record | Crew assignment and schedule in PS Technology | Crew assigned within 5 minutes of train arrival | Insufficient crew availability | N | Y |
| 1.3 | Conduct Pre-Departure Inspection | Car Inspector (Carman) | EHMS | Train manifest and inspection checklist | Inspection report in EHMS | 100% compliance with inspection checklist | Defective equipment passing inspection | Y | Y |
| 1.4 | Prepare for Classification | Switchman/Switch Foreman | Hump yard classification technology | Inspection report and train manifest | Classification plan in Hump yard system | Train cars classified within 30 minutes | Technical issues with classification equipment | N | Y |
| 1.5 | Execute Classification | Switchman/Switch Foreman | Hump yard classification technology | Classification plan | Sorted train cars in designated tracks | Accuracy of car sorting > 95% | Misclassification leading to delays | Y | N |
| 1.6 | Conduct Post-Classification Inspection | Car Inspector (Carman) | EHMS | Sorted train cars and inspection checklist | Post-classification inspection report in EHMS | 100% compliance with post-inspection checklist | Defective equipment after classification | Y | Y |
| 1.7 | Prepare for Departure | Yardmaster | NetControl | Post-classification inspection report and train manifest | Departure schedule in NetControl | Train departure scheduled within 1 hour of classification completion | Late scheduling affecting yard throughput | N | Y |
| 1.8 | Conduct Departure Inspection | Car Inspector (Carman) | EHMS | Train manifest and inspection checklist | Departure inspection report in EHMS | 100% compliance with departure checklist | Defective equipment causing delays | Y | Y |
| 1.9 | Notify Dispatching Center of Departure | Yardmaster | NetControl | Departure inspection report and train manifest | Departure notification to Harriman Dispatching Center | Time to notify dispatch center < 5 minutes after departure | Delayed notifications affecting downstream operations | N | Y |
| 1.10 | Update Train Manifest and Accounting | Car Inspector (Carman) | CHARM | Departure inspection report and train manifest | Updated train manifest in CHARM | Manifest updated within 10 minutes of departure | Inaccurate manifest updates affecting billing | N | Y |
| 1.11 | Review and Adjust Yard Operations | Yardmaster | NetControl | Operational data from NetControl | Adjusted yard operation plan in NetControl | Terminal dwell under 24 hours | Extended terminal dwell affecting yard efficiency | Y | N |
| 1.12 | Finalize Yard Operations for the Day | Yardmaster | NetControl | Adjusted operation plan and final train departure data | Day-end report in NetControl | 100% yard operations documented and reported | Incomplete documentation affecting compliance | N | Y |
📊 KPIs & Risk Register
KPIs
Time to receive and acknowledge train arrival < 10 minutes Crew assigned within 5 minutes of train arrival Train cars classified within 30 minutes Accuracy of car sorting > 95% Manifest updated within 10 minutes of departure Terminal dwell under 24 hours Time to notify dispatch center < 5 minutes after departure 100% yard operations documented and reported
Key Risks
Air brake test defect released to the road Insufficient crew availability Technical issues with classification equipment Misclassification leading to delays Defective equipment causing delays Inaccurate manifest updates affecting billing Extended terminal dwell affecting yard efficiency Incomplete documentation affecting compliance
Swim Lanes
Yardmaster · 1.1, 1.2, 1.7, 1.9, 1.10, 1.11, 1.12 Switchman/Switch Foreman · 1.4, 1.5 Car Inspector (Carman) · 1.3, 1.6, 1.8