US Class I Rail Process Wiki Service Design & Network Planning › Locomotive Power Distribution Planning
🗺 BPMN Process Flow
RR-01-06-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-01-06-02
Domain FamilyNETWORK & PLANNING
L1 DomainService Design & Network Planning
L2 Process GroupLocomotive Power Distribution Planning
TriggerInitiated by the Service Design / Network Planning Analyst upon receiving updated demand forecasts or changes in operational requirements.
OutcomeSuccessful completion results in an optimized locomotive power distribution plan that meets service demands while adhering to regulatory and safety standards.
SystemsUnified Plan 2020 NetControl I-ETMS EHMS PS Technology
Regulatory Hooks49 CFR Part 232 GCOR
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Review Demand Forecasts Service Design / Network Planning Analyst Unified Plan 2020 Demand forecasts from various departments Updated demand forecast report Accuracy of demand forecast within 5% Inaccurate demand forecasts leading to over or under-provisioning of locomotives. N Y
1.2 Identify Available Locomotives VP Network Planning & Operations EHMS Current locomotive status and maintenance records Available locomotive list Percentage of available locomotives above 80% Insufficient available locomotives for planned operations. N Y
1.3 Allocate Locomotives to Trains Service Design / Network Planning Analyst NetControl Available locomotive list and demand forecast report Locomotive allocation plan Number of trains with allocated locomotives above 95% Inefficient allocation leading to delays or insufficient power. Y Y
1.4 Update Train Schedules Train Dispatcher NetControl / CADx Locomotive allocation plan Updated train schedules Train schedule adherence rate above 90% Misaligned schedules causing delays or conflicts. N Y
1.5 Conduct Pre-Departure Inspections Locomotive Engineer EHMS Updated train schedules Inspection report Pre-departure inspection completion rate above 98% Undetected issues leading to operational disruptions. Y Y
1.6 Monitor Train Performance Train Dispatcher I-ETMS Updated train schedules and inspection reports Performance monitoring report Average train speed above 20 mph Slow-moving trains causing delays. N Y
1.7 Adjust Locomotive Power Distribution VP Network Planning & Operations NetControl Performance monitoring report Adjusted locomotive power distribution plan Number of adjustments made within 24 hours of detection Inability to make timely adjustments leading to ongoing issues. Y Y
1.8 Notify Crews and Stakeholders Crew Caller / Crew Dispatcher PS Technology Adjusted locomotive power distribution plan Notification logs Notification response time below 30 minutes Delayed notifications causing confusion or operational delays. N Y
1.9 Review and Report Performance Service Design / Network Planning Analyst Unified Plan 2020 Performance monitoring report and notification logs Operational performance review report Number of operational issues resolved within 48 hours Persistent unresolved issues affecting service quality. Y Y
1.10 Update Maintenance Schedules VP Network Planning & Operations EHMS Operational performance review report Updated maintenance schedules Maintenance schedule adherence rate above 95% Inefficient maintenance leading to unexpected breakdowns. N Y
1.11 Conduct Post-Operational Review Train Dispatcher NetControl / CADx Updated maintenance schedules Post-operational review report Number of post-operative issues identified and addressed within 72 hours Undetected issues leading to future disruptions. Y Y
1.12 Update Demand Forecasts for Next Cycle Service Design / Network Planning Analyst Unified Plan 2020 Post-operational review report Updated demand forecasts Accuracy of updated demand forecast within 4% Inaccurate forecasts leading to ongoing inefficiencies. N Y
📊 KPIs & Risk Register

KPIs

Accuracy of demand forecast within 5% Percentage of available locomotives above 80% Number of trains with allocated locomotives above 95% Train schedule adherence rate above 90% Pre-departure inspection completion rate above 98% Average train speed above 20 mph Number of adjustments made within 24 hours of detection Notification response time below 30 minutes Number of operational issues resolved within 48 hours Maintenance schedule adherence rate above 95% Number of post-operative issues identified and addressed within 72 hours Accuracy of updated demand forecast within 4%

Key Risks

Insufficient available locomotives for planned operations. Inefficient allocation leading to delays or insufficient power. Undetected issues leading to operational disruptions. Slow-moving trains causing delays. Inability to make timely adjustments leading to ongoing issues.

Swim Lanes

Service Design / Network Planning Analyst · 1.1, 1.3, 1.9, 1.12 VP Network Planning & Operations · 1.2, 1.7, 1.10 Train Dispatcher · 1.4, 1.6, 1.11 Locomotive Engineer · 1.5 Crew Caller / Crew Dispatcher · 1.8