RR-01 RR-01-06-02 — Locomotive Power Distribution Planning
This process involves the planning and distribution of locomotive power to ensure efficient train operations across the network.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-01-06-02 |
|---|---|
| Domain Family | NETWORK & PLANNING |
| L1 Domain | Service Design & Network Planning |
| L2 Process Group | Locomotive Power Distribution Planning |
| Trigger | Initiated by the Service Design / Network Planning Analyst upon receiving updated demand forecasts or changes in operational requirements. |
| Outcome | Successful completion results in an optimized locomotive power distribution plan that meets service demands while adhering to regulatory and safety standards. |
| Systems | Unified Plan 2020 NetControl I-ETMS EHMS PS Technology |
| Regulatory Hooks | 49 CFR Part 232 GCOR |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Review Demand Forecasts | Service Design / Network Planning Analyst | Unified Plan 2020 | Demand forecasts from various departments | Updated demand forecast report | Accuracy of demand forecast within 5% | Inaccurate demand forecasts leading to over or under-provisioning of locomotives. | N | Y |
| 1.2 | Identify Available Locomotives | VP Network Planning & Operations | EHMS | Current locomotive status and maintenance records | Available locomotive list | Percentage of available locomotives above 80% | Insufficient available locomotives for planned operations. | N | Y |
| 1.3 | Allocate Locomotives to Trains | Service Design / Network Planning Analyst | NetControl | Available locomotive list and demand forecast report | Locomotive allocation plan | Number of trains with allocated locomotives above 95% | Inefficient allocation leading to delays or insufficient power. | Y | Y |
| 1.4 | Update Train Schedules | Train Dispatcher | NetControl / CADx | Locomotive allocation plan | Updated train schedules | Train schedule adherence rate above 90% | Misaligned schedules causing delays or conflicts. | N | Y |
| 1.5 | Conduct Pre-Departure Inspections | Locomotive Engineer | EHMS | Updated train schedules | Inspection report | Pre-departure inspection completion rate above 98% | Undetected issues leading to operational disruptions. | Y | Y |
| 1.6 | Monitor Train Performance | Train Dispatcher | I-ETMS | Updated train schedules and inspection reports | Performance monitoring report | Average train speed above 20 mph | Slow-moving trains causing delays. | N | Y |
| 1.7 | Adjust Locomotive Power Distribution | VP Network Planning & Operations | NetControl | Performance monitoring report | Adjusted locomotive power distribution plan | Number of adjustments made within 24 hours of detection | Inability to make timely adjustments leading to ongoing issues. | Y | Y |
| 1.8 | Notify Crews and Stakeholders | Crew Caller / Crew Dispatcher | PS Technology | Adjusted locomotive power distribution plan | Notification logs | Notification response time below 30 minutes | Delayed notifications causing confusion or operational delays. | N | Y |
| 1.9 | Review and Report Performance | Service Design / Network Planning Analyst | Unified Plan 2020 | Performance monitoring report and notification logs | Operational performance review report | Number of operational issues resolved within 48 hours | Persistent unresolved issues affecting service quality. | Y | Y |
| 1.10 | Update Maintenance Schedules | VP Network Planning & Operations | EHMS | Operational performance review report | Updated maintenance schedules | Maintenance schedule adherence rate above 95% | Inefficient maintenance leading to unexpected breakdowns. | N | Y |
| 1.11 | Conduct Post-Operational Review | Train Dispatcher | NetControl / CADx | Updated maintenance schedules | Post-operational review report | Number of post-operative issues identified and addressed within 72 hours | Undetected issues leading to future disruptions. | Y | Y |
| 1.12 | Update Demand Forecasts for Next Cycle | Service Design / Network Planning Analyst | Unified Plan 2020 | Post-operational review report | Updated demand forecasts | Accuracy of updated demand forecast within 4% | Inaccurate forecasts leading to ongoing inefficiencies. | N | Y |
📊 KPIs & Risk Register
KPIs
Accuracy of demand forecast within 5% Percentage of available locomotives above 80% Number of trains with allocated locomotives above 95% Train schedule adherence rate above 90% Pre-departure inspection completion rate above 98% Average train speed above 20 mph Number of adjustments made within 24 hours of detection Notification response time below 30 minutes Number of operational issues resolved within 48 hours Maintenance schedule adherence rate above 95% Number of post-operative issues identified and addressed within 72 hours Accuracy of updated demand forecast within 4%
Key Risks
Insufficient available locomotives for planned operations. Inefficient allocation leading to delays or insufficient power. Undetected issues leading to operational disruptions. Slow-moving trains causing delays. Inability to make timely adjustments leading to ongoing issues.
Swim Lanes
Service Design / Network Planning Analyst · 1.1, 1.3, 1.9, 1.12 VP Network Planning & Operations · 1.2, 1.7, 1.10 Train Dispatcher · 1.4, 1.6, 1.11 Locomotive Engineer · 1.5 Crew Caller / Crew Dispatcher · 1.8