RR-06 RR-06-03-01 — Maintenance-of-Way Programs (rail, tie, surfacing gangs)
This process outlines the maintenance-of-way (MOW) programs for rail, tie, and surfacing gangs on a US Class I freight railroad. It ensures that tracks are inspected, maintained, and repaired to meet safety standards and operational requirements.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-06-03-01 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Engineering: Track, Structures & Signals |
| L2 Process Group | Maintenance-of-Way Programs (rail, tie, surfacing gangs) |
| Trigger | Scheduled maintenance cycle or detection of track defects through automated systems |
| Outcome | Safe and compliant railway infrastructure with minimal service disruption |
| Systems | NetControl I-ETMS Wabtrax FRA ATIP Umler PS Technology EHMS |
| Regulatory Hooks | 49 CFR Part 213 49 CFR Part 236, Subpart I GCOR 6.28 49 CFR Part 1180 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Track Inspection Planning | Track Supervisor | NetControl, I-ETMS | Maintenance schedule, track geometry data, defect reports | Inspection plan and crew assignment | 100% adherence to planned maintenance schedule | Resource allocation for unexpected defects | N | N |
| 1.2 | Defect Detection by Automated Systems | Track Supervisor | Wabtrax, FRA ATIP | Automated track inspection data | Defect report and priority list | 95% accuracy in defect detection | False positives leading to unnecessary maintenance | Y | Y |
| 1.3 | Manual Track Inspection | Assistant Foreman (track) | NetControl, Umler | Defect report and inspection plan | Detailed inspection report with photos | 100% coverage of planned inspection routes | Weather conditions affecting visibility | N | Y |
| 1.4 | Defect Classification and Prioritization | Track Supervisor | NetControl, I-ETMS | Detailed inspection report | Prioritized defect list for repair | 90% accurate classification of defects | Complex defect interpretation | Y | N |
| 1.5 | Repair Crew Assignment | Track Supervisor | NetControl, PS Technology | Prioritized defect list | Crew assignment and repair schedule | 95% crew availability for scheduled repairs | Crew availability conflicts | N | Y |
| 1.6 | Track Repair Execution | Roadmaster | NetControl, EHMS | Repair schedule and crew assignment | Repair completion report with photos | 98% on-time repair completion | Material shortages during repairs | Y | N |
| 1.7 | Post-Repair Inspection | Assistant Foreman (track) | NetControl, Umler | Repair completion report | Post-repair inspection report | 95% successful repair verification | Hidden defects not detected | Y | Y |
| 1.8 | Defect Closure and Reporting | Track Supervisor | NetControl, I-ETMS | Post-repair inspection report | Closed defect record and service impact analysis | 100% closure of all reported defects | Incomplete repair documentation | N | Y |
| 1.9 | Maintenance Record Update | Track Supervisor | NetControl, Umler | Closed defect record and service impact analysis | Updated maintenance database | 98% accuracy in maintenance records | Data entry errors | N | Y |
| 1.10 | Continuous Improvement Review | Chief Engineer / VP Engineering | NetControl, I-ETMS | Maintenance records and service impact analysis | Improvement plan and training needs | 10% reduction in maintenance cycle time over 6 months | Resistance to change in maintenance practices | Y | N |
| 1.11 | Training and Development | Chief Engineer / VP Engineering | NetControl, PS Technology | Improvement plan and training needs | Training schedule and completion report | 90% attendance at scheduled training sessions | Employee availability for training | N | Y |
| 1.12 | Performance Review and Reporting | Chief Engineer / VP Engineering | NetControl, I-ETMS | Training completion report and maintenance records | Performance review report and action plan | 95% compliance with safety standards | Lack of clear performance metrics | Y | N |
📊 KPIs & Risk Register
KPIs
100% adherence to planned maintenance schedule 95% accuracy in defect detection 100% coverage of planned inspection routes 98% on-time repair completion 95% successful repair verification 100% closure of all reported defects 98% accuracy in maintenance records 10% reduction in maintenance cycle time over 6 months 90% attendance at scheduled training sessions 95% compliance with safety standards
Key Risks
Regulatory non-compliance due to missed inspections Safety incidents caused by undetected defects Service disruptions from prolonged maintenance activities Material shortages affecting repair schedules Employee fatigue leading to operational errors
Swim Lanes
Track Supervisor · 1.1, 1.2, 1.4, 1.5, 1.8, 1.9 Assistant Foreman (track) · 1.3, 1.7 Roadmaster · 1.6 Chief Engineer / VP Engineering · 1.10, 1.11, 1.12