US Class I Rail Process Wiki Merger & Network Integration › Operating Plan and Service Assurance Plan
🗺 BPMN Process Flow
RR-15-02-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-15-02-01
Domain FamilyCORPORATE
L1 DomainMerger & Network Integration
L2 Process GroupOperating Plan and Service Assurance Plan
TriggerInitiated by the Chairman/CEO or Integration Program Management Office (PMO) lead upon the announcement of a merger or significant network integration project.
OutcomeSuccessful completion results in an updated Operating Plan and Service Assurance Plan that improves train schedules, enhances safety measures, and ensures compliance with regulatory requirements.
SystemsNetControl I-ETMS (Interoperable Electronic Train Management System) Umler EHMS (Equipment Health Management System) Wabtrax
Regulatory Hooks49 CFR Part 232 GCOR (General Code of Operating Rules)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Initiate Planning Process Integration Program Management Office (PMO) lead NetControl / TCS cutover precedent Merger or network integration proposal Planning kickoff meeting agenda Time to initiate planning within 30 days of trigger Resource allocation for new planning team Y N
1.2 Define Service Objectives Service Design / Network Planning Analyst NetControl (service design use) Planning kickoff meeting agenda Service objectives document Number of service objectives defined within 60 days Balancing safety and operational efficiency Y N
1.3 Develop Train Schedules Train Dispatcher NetControl Service objectives document Initial train schedule draft Number of trains scheduled per day within 90 days Meeting regulatory requirements like 49 CFR Part 232 Y Y
1.4 Review and Adjust Schedules VP Network Planning & Operations I-ETMS (Interoperable Electronic Train Management System) Initial train schedule draft Adjusted train schedule Number of adjustments made within 30 days Ensuring compliance with 49 CFR Part 217 Y N
1.5 Conduct Safety Audits Car Inspector (Carman) EHMS (Equipment Health Management System) Adjusted train schedule Safety audit report Number of safety audits conducted within 60 days Identifying potential air brake test defects Y Y
1.6 Update Operating Rules Integration Program Management Office (PMO) lead Umler Safety audit report Updated operating rules document Time to update rules within 90 days Coordinating with regulatory bodies Y N
1.7 Implement Service Assurance Measures Train Dispatcher NetControl Updated operating rules document Service assurance plan implementation plan Number of service assurance measures implemented within 120 days Monitoring train speed and terminal dwell times Y N
1.8 Monitor Performance Control Operator Wabtrax Service assurance plan implementation plan Performance monitoring report Number of performance metrics tracked daily Real-time data collection and analysis Y N
1.9 Review and Optimize Service Design / Network Planning Analyst NetControl (service design use) Performance monitoring report Optimization plan Number of optimizations made within 180 days Balancing cost and performance Y N
1.10 Finalize Operating Plan Integration Program Management Office (PMO) lead NetControl / TCS cutover precedent Optimization plan Finalized operating plan and service assurance plan Time to finalize plans within 240 days Stakeholder approval Y N
📊 KPIs & Risk Register

KPIs

Terminal dwell under 24 hours Train speed above 20 mph Number of trains scheduled per day Number of safety audits conducted Time to update rules Number of service assurance measures implemented Number of performance metrics tracked daily Number of optimizations made

Key Risks

Air brake test defect released to the road Non-compliance with regulatory requirements like 49 CFR Part 232 Delays in stakeholder approval Inaccurate data leading to suboptimal schedules Resource constraints affecting planning and implementation

Swim Lanes

Integration Program Management Office (PMO) lead · 1.1, 1.6, 1.10 Service Design / Network Planning Analyst · 1.2, 1.9 Train Dispatcher · 1.3, 1.7 VP Network Planning & Operations · 1.4 Car Inspector (Carman) · 1.5 Control Operator · 1.8