US Class I Rail Process Wiki Crew Management › Tie-up, Lodging and Crew Transportation
🗺 BPMN Process Flow
RR-04-09-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-04-09-02
Domain FamilyOPERATIONS
L1 DomainCrew Management
L2 Process GroupTie-up, Lodging and Crew Transportation
TriggerTrain schedule updates or changes in crew availability
OutcomeCrews are properly tied up, accommodated, and transported to their assigned trains on time, minimizing delays and operational disruptions.
SystemsNetControl PS Technology (PST) CloudMoyo Crew Management (CCM) HASTUS EHMS
Regulatory Hooks49 CFR Part 228 (Hours of Service) 49 CFR Part 232 (Brake Systems) GCOR (General Code of Operating Rules)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Receive Train Schedule Updates Train Dispatcher NetControl Train schedule changes Updated train schedule data Schedule update accuracy rate > 95% Inaccurate schedule updates leading to crew misassignments N N
1.2 Crew Assignment and Tie-up Trainmaster PS Technology (PST) Updated train schedule data, crew availability Assigned crews to trains Crew assignment accuracy rate > 98% Inadequate crew availability leading to overtime or delays Y Y
1.3 Lodging Arrangements Crew Caller / Crew Dispatcher CloudMoyo Crew Management (CCM) Assigned crews, travel plans Confirmed lodging reservations Lodging reservation confirmation rate > 90% Unavailability of suitable lodging options Y N
1.4 Transportation Coordination Crew Caller / Crew Dispatcher PS Technology (PST) Assigned crews, travel plans Confirmed transportation arrangements Transportation confirmation rate > 95% Transport delays affecting crew punctuality N Y
1.5 Pre-departure Briefing Trainmaster HASTUS Assigned crews, train details Briefing notes for crew members Crew briefing attendance rate > 95% Inadequate briefing leading to operational errors N N
1.6 Conduct Pre-trip Inspections Locomotive Engineer EHMS (Equipment Health Management System) Assigned locomotives, inspection checklists Inspection reports Pre-trip inspection compliance rate > 98% Undetected mechanical issues leading to train delays Y Y
1.7 Monitor Crew Hours of Service (HOS) Crew Caller / Crew Dispatcher trackHOS-class HOS monitoring tools Assigned crews, HOS regulations HOS compliance reports HOS compliance rate > 98% Non-compliance with HOS leading to fatigue-related incidents Y Y
1.8 Coordinate Train Departure Train Dispatcher NetControl Assigned crews, train status Departure confirmation On-time departure rate > 95% Delays affecting overall schedule adherence N Y
1.9 Post-trip Review and Reporting Trainmaster HASTUS, PS Technology (PST) Trip details, crew feedback Review reports, improvement suggestions Post-trip review completion rate > 95% Lack of detailed reviews hindering continuous improvement N N
1.10 Update Crew Records Crew Caller / Crew Dispatcher CloudMoyo Crew Management (CCM) Trip details, crew performance Updated crew records Crew record update accuracy rate > 98% Inaccurate records leading to mismanagement N N
1.11 Monitor Crew Well-being Superintendent (Division) CloudMoyo Crew Management (CCM) Crew health data, feedback Well-being reports Crew well-being monitoring rate > 95% Neglected crew well-being leading to high turnover Y N
1.12 Adjust Crew Scheduling for Next Shift Train Dispatcher NetControl, PS Technology (PST) Crew performance data, feedback Adjusted crew schedules Scheduling adjustment accuracy rate > 95% Inflexible scheduling leading to burnout Y N
📊 KPIs & Risk Register

KPIs

Crew assignment accuracy rate > 98% Lodging reservation confirmation rate > 90% Transportation confirmation rate > 95% Pre-trip inspection compliance rate > 98% HOS compliance rate > 98% On-time departure rate > 95% Post-trip review completion rate > 95% Crew record update accuracy rate > 98% Crew well-being monitoring rate > 95% Scheduling adjustment accuracy rate > 95%

Key Risks

Inadequate crew availability leading to overtime or delays Undetected mechanical issues leading to train delays Non-compliance with HOS leading to fatigue-related incidents Delays affecting overall schedule adherence Neglected crew well-being leading to high turnover

Swim Lanes

Train Dispatcher · 1.1, 1.8, 1.12 Trainmaster · 1.2, 1.5, 1.9 Crew Caller / Crew Dispatcher · 1.3, 1.4, 1.7, 1.10 Locomotive Engineer · 1.6