US Class I Rail Process Wiki Engineering: Track, Structures & Signals › Signal Design, Installation and Testing
🗺 BPMN Process Flow
RR-06-06-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-06-06-02
Domain FamilyOPERATIONS
L1 DomainEngineering: Track, Structures & Signals
L2 Process GroupSignal Design, Installation and Testing
TriggerInitiation by Track Supervisor upon identification of a need for new signaling infrastructure due to track expansion or upgrade.
OutcomeSuccessful completion results in the installation and testing of new signaling systems, ensuring they meet all regulatory requirements and are operational.
SystemsNetControl I-ETMS Wabtrax PTC Back Office Server (BOS) FRA Automated Track Inspection Program (ATIP) Umler
Regulatory Hooks49 CFR Part 236, Subpart I 49 CFR Part 1180
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Signal Design Review Track Supervisor NetControl Design specifications Approved design document Time to approval under 2 weeks Incompatibility with existing track infrastructure N Y
1.2 Signal Installation Planning Roadmaster I-ETMS Approved design document Installation plan Plan completion within 3 days Coordination with other track maintenance activities N Y
1.3 Signal Installation Signal Maintainer Wabtrax Installation plan Installed signaling equipment Equipment installation within 2 weeks Weather delays affecting installation N Y
1.4 Signal Testing Initial PTC Field Engineer / PTC Technician PTC Back Office Server (BOS) Installed signaling equipment Initial test report First test within 1 week of installation Technical issues with new equipment Y N
1.5 Signal Testing Final Chief Engineer / VP Engineering FRA Automated Track Inspection Program (ATIP) Initial test report Final test approval document Final testing within 2 weeks of initial test Regulatory compliance issues Y N
1.6 Signal Integration with Existing Systems Service Design / Network Planning Analyst NetControl (service design use) Final test approval document Integration plan Integration plan within 1 week of final testing Compatibility with existing signaling systems N Y
1.7 Signal System Training Employee-in-Charge (EIC) Umler Integration plan Training completion certificates Training completed within 2 weeks of integration Resource allocation for training sessions N Y
1.8 Signal System Activation Track Supervisor PS Technology (PST) Training completion certificates Activation report System activation within 1 week of training Operational disruptions during activation Y N
1.9 Signal System Monitoring Signal Maintainer EHMS (Equipment Health Management System) Activation report Monitoring report Continuous monitoring for 30 days post-activation Technical failures after activation N Y
1.10 Signal System Evaluation Chief Engineer / VP Engineering TRAIN II (Tele Rail Automated Information Network Phase 2) Monitoring report Evaluation report Evaluation completed within 1 month of activation Performance issues affecting train operations Y N
1.11 Signal System Maintenance Plan Roadmaster CHARM (Car Hire Accounting Rate Master) Evaluation report Maintenance plan Plan completion within 2 weeks of evaluation Resource allocation for maintenance activities N Y
1.12 Signal System Maintenance Execution Signal Maintainer Interline Settlement System (ISS) / Switching Settlement Data Exchange (SSDX) / Car Hire Data Exchange (CHDX) Maintenance plan Maintenance completion report Maintenance completed within 1 month of plan approval Operational disruptions during maintenance N Y
📊 KPIs & Risk Register

KPIs

Time to approval under 2 weeks Plan completion within 3 days Equipment installation within 2 weeks First test within 1 week of installation Final testing within 2 weeks of initial test Integration plan within 1 week of final testing Training completed within 2 weeks of integration System activation within 1 week of training Continuous monitoring for 30 days post-activation Evaluation completed within 1 month of activation

Key Risks

Technical issues with new equipment Regulatory compliance issues Compatibility with existing signaling systems Operational disruptions during activation and maintenance Performance issues affecting train operations

Swim Lanes

Track Supervisor · 1.1, 1.2, 1.8 Roadmaster · 1.2, 1.6, 1.10, 1.11 Signal Maintainer · 1.3, 1.4, 1.9, 1.12 PTC Field Engineer / PTC Technician · 1.4 Chief Engineer / VP Engineering · 1.5, 1.10 Service Design / Network Planning Analyst · 1.6 Employee-in-Charge (EIC) · 1.7