US Class I Rail Process Wiki Mechanical & Rolling Stock › Railcar Repair & Billing Repair Card Processing
🗺 BPMN Process Flow
RR-05-03-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-05-03-01
Domain FamilyOPERATIONS
L1 DomainMechanical & Rolling Stock
L2 Process GroupRailcar Repair & Billing Repair Card Processing
TriggerDetection of a railcar defect by the Wayside Defect Detector Network (hot bearing, wheel impact, acoustic).
OutcomeDefective railcar is safely removed from service, repaired, and returned to operational status with all necessary documentation completed.
SystemsWayside defect detector network NetControl PS Technology Downing B. Jenks Shop EHMS Umler TRAIN II Interline Settlement System
Regulatory Hooks49 CFR Part 232 49 CFR Part 215 AAR Interchange Rules
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Identify Defect Service Operator Wayside defect detector network Defect detection data Defect report Time to identify defect < 5 minutes False positives leading to unnecessary service disruptions N Y
1.2 Report Defect Service Operator NetControl Defect report Service order Time to report defect < 10 minutes Delayed reporting causing safety risks N Y
1.3 Assign Repair Crew Manager-Mechanical Maintenance PS Technology Service order Crew assignment Time to assign crew < 20 minutes Inadequate crew availability leading to delays Y Y
1.4 Inspect Railcar Machinist Wabtec Modular Control Architecture Railcar ID and defect report Inspection report Time to inspect railcar < 30 minutes Missed defects due to inadequate inspection procedures Y Y
1.5 Repair Railcar Machinist Downing B. Jenks Shop Inspection report and repair instructions Repaired railcar Time to repair railcar < 1 hour Substandard repairs leading to rework Y Y
1.6 Conduct Air Brake Test Electrician (locomotive) EHMS Repaired railcar Air brake test report Pass rate of air brake tests > 98% Defective brakes released to service Y Y
1.7 Update Railcar Status Manager-Mechanical Maintenance Umler Air brake test report Updated railcar status Time to update status < 5 minutes Inaccurate status updates causing confusion N Y
1.8 Prepare Repair Card Manager-Mechanical Maintenance TRAIN II Repair details and cost estimates Repair card Time to prepare repair card < 20 minutes Inaccurate billing due to incomplete documentation N Y
1.9 Bill Repair Costs Manager-Mechanical Maintenance Interline Settlement System Repair card Invoice Time to bill repair costs < 30 minutes Billing errors leading to disputes N Y
1.10 Release Railcar to Service Manager-Mechanical Maintenance NetControl Invoice and repair card approval Service order for release Time to release railcar < 5 minutes Railcars released with unresolved issues Y Y
1.11 Monitor Railcar Performance Service Operator Wayside defect detector network Service order for release Performance data Post-repair defect rate < 2% Persistent defects after repair Y Y
1.12 Review and Improve Process Senior Manager-Mechanical Engineering TRAIN II Performance data and feedback Process improvement plan Number of process improvements per quarter > 3 Ineffective process reviews leading to recurring issues N Y
📊 KPIs & Risk Register

KPIs

Time to identify defect < 5 minutes Time to report defect < 10 minutes Time to assign crew < 20 minutes Time to inspect railcar < 30 minutes Time to repair railcar < 1 hour Pass rate of air brake tests > 98% Time to update status < 5 minutes Time to prepare repair card < 20 minutes Time to bill repair costs < 30 minutes Time to release railcar < 5 minutes Post-repair defect rate < 2% Number of process improvements per quarter > 3

Key Risks

Defective brakes released to service Inadequate crew availability leading to delays Missed defects due to inadequate inspection procedures Substandard repairs leading to rework Persistent defects after repair

Swim Lanes

Service Operator · 1.1, 1.2, 1.10, 1.11 Manager-Mechanical Maintenance · 1.3, 1.5, 1.7, 1.8, 1.9 Machinist · 1.4, 1.5 Electrician (locomotive) · 1.6 Senior Manager-Mechanical Engineering · 1.12