RR-06 RR-06-01-03 — Visual and Walking Track Inspection
This process involves the visual and walking inspection of tracks by specialized teams to ensure compliance with safety standards and regulations. It includes planning, execution, data recording, and reporting phases.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-06-01-03 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Engineering: Track, Structures & Signals |
| L2 Process Group | Visual and Walking Track Inspection |
| Trigger | Scheduled maintenance cycle or detection of track anomalies through automated systems |
| Outcome | A comprehensive report detailing any issues found during the inspection, along with recommendations for remediation, ensuring safe operation of the railway tracks. |
| Systems | NetControl I-ETMS Wabtrax Umler PS Technology RailAI |
| Regulatory Hooks | 49 CFR Part 213 49 CFR Part 236, Subpart I GCOR 6.28 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Plan Inspection Route | Track Supervisor | NetControl | Maintenance schedule and track condition data | Inspection route plan | Time to complete route planning under 2 hours | Dynamic changes in maintenance schedules | Y | N |
| 1.2 | Assign Inspection Crew | Assistant Foreman (track) | Umler | Inspection route plan | Crew assignment and equipment checklist | Crew assigned within 1 hour of route planning completion | Availability of qualified personnel | N | Y |
| 2.1 | Conduct Visual Inspection | Roadmaster | Wabtrax | Inspection route plan and equipment checklist | Visual inspection report | Completion of visual inspection within 4 hours per mile | Weather conditions affecting visibility | Y | N |
| 2.2 | Conduct Walking Inspection | Signal Maintainer | Track geometry car | Visual inspection report and equipment checklist | Walking inspection report | Completion of walking inspection within 6 hours per mile | Obstacles on the track | Y | Y |
| 3.1 | Record Inspection Data | Employee-in-Charge (EIC) | RailAI | Visual and walking inspection reports | Digital inspection record | Data entry accuracy above 95% | Data input errors | N | Y |
| 3.2 | Analyze Inspection Data | Chief Engineer / VP Engineering | NetControl | Digital inspection record | Inspection analysis report | Analysis completion within 24 hours of data recording | Complexity in identifying critical issues | Y | N |
| 4.1 | Report Findings to Management | Track Supervisor | NetControl | Inspection analysis report | Management report | Report submission within 36 hours of analysis completion | Timely communication delays | N | Y |
| 4.2 | Plan Remediation Actions | Assistant Foreman (track) | Umler | Management report | Remediation plan | Remediation plan development within 48 hours of report submission | Resource allocation challenges | Y | N |
| 5.1 | Implement Remediation Actions | Roadmaster | PS Technology | Remediation plan | Remediation status update | Remediation completion within 7 days of implementation start | Field execution delays | Y | Y |
| 5.2 | Verify Remediation Effectiveness | Signal Maintainer | Wabtrax | Remediation status update | Verification report | Verification completion within 48 hours of remediation completion | Re-inspection challenges | N | Y |
| 6.1 | Update Maintenance Schedule | Employee-in-Charge (EIC) | NetControl | Verification report | Updated maintenance schedule | Schedule update accuracy above 90% | Scheduling conflicts | N | Y |
| 6.2 | Close Inspection Process | Chief Engineer / VP Engineering | NetControl | Updated maintenance schedule | Inspection closure report | Process closure within 1 week of verification completion | Final documentation errors | Y | N |
📊 KPIs & Risk Register
KPIs
Time to complete route planning under 2 hours Crew assigned within 1 hour of route planning completion Completion of visual inspection within 4 hours per mile Completion of walking inspection within 6 hours per mile Data entry accuracy above 95% Analysis completion within 24 hours of data recording Report submission within 36 hours of analysis completion Remediation plan development within 48 hours of report submission Remediation completion within 7 days of implementation start Verification completion within 48 hours of remediation completion
Key Risks
Inaccurate inspection data leading to missed issues Delayed remediation actions causing safety risks Resource allocation challenges affecting maintenance schedules Field execution delays impacting track safety Final documentation errors leading to compliance issues
Swim Lanes
Track Supervisor · 1.1, 4.1 Assistant Foreman (track) · 1.2, 4.2 Roadmaster · 2.1, 5.1 Signal Maintainer · 2.2, 5.2 Employee-in-Charge (EIC) · 3.1, 6.1 Chief Engineer / VP Engineering · 3.2, 6.2