US Class I Rail Process Wiki Mechanical & Rolling Stock › Wayside Detector Network (hot bearing, wheel impact, acoustic)
🗺 BPMN Process Flow
RR-05-05-01 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-05-05-01
Domain FamilyOPERATIONS
L1 DomainMechanical & Rolling Stock
L2 Process GroupWayside Detector Network (hot bearing, wheel impact, acoustic)
TriggerDetection of an anomaly by the wayside defect detector network (hot bearing, wheel impact, or acoustic).
OutcomeThe process ensures that detected anomalies are properly identified, reported, and addressed to maintain the safety and reliability of the railroad's rolling stock.
SystemsWayside defect detector network NetControl I-ETMS Umler EHMS TRAIN II CHARM
Regulatory Hooks49 CFR Part 229 49 CFR Part 215 49 CFR Part 231 49 CFR Part 1180 AAR Interchange Rules (Rule 88 and related)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Anomaly Detection Service Operator Wayside defect detector network Sensor data from wayside detectors Alert notification to the control center Detection accuracy rate above 95% False positives leading to unnecessary inspections N Y
1.2 Initial Assessment Train Dispatcher NetControl Alert notification Dispatch order for inspection train Response time to anomaly detection under 30 minutes Delayed response leading to potential safety hazards Y N
1.3 Inspection Train Dispatch Control Operator I-ETMS Dispatch order Train movement confirmation Train dispatch accuracy rate above 98% Incorrect train dispatch leading to operational delays N Y
1.4 On-Site Inspection Machinist Wabtec Modular Control Architecture Train movement confirmation Inspection report Inspection completion time under 2 hours Extended inspection times due to complex issues Y N
1.5 Defect Classification Electrician (locomotive) EHMS Inspection report Defect classification and repair plan Defect classification accuracy rate above 90% Misclassification leading to improper repairs N Y
1.6 Repair Planning Manager-Locomotive Maintenance Umler Defect classification and repair plan Work order for repair Repair planning time under 4 hours Delays in repair planning causing further operational disruptions Y N
1.7 Repair Execution Senior Director-System Locomotive Facility Downing B. Jenks Shop, North Platte, NE locomotive shop, Proviso Locomotive Shop, West Colton Yard and Shops Work order for repair Repair completion confirmation Repair execution time under 24 hours Extended repair times leading to increased downtime N Y
1.8 Post-Repair Inspection Service Operator Wayside defect detector network Repair completion confirmation Inspection report Post-repair inspection accuracy rate above 95% Missed defects during post-repair inspections Y N
1.9 Defect Resolution Reporting Manager-Mechanical Maintenance TRAIN II, CHARM Inspection report Defect resolution report Defect resolution reporting time under 24 hours Delayed reporting causing further operational issues N Y
1.10 System Update Senior Manager-Mechanical Engineering Wayside defect detector network Defect resolution report Updated system parameters System update accuracy rate above 90% Incorrect system updates leading to false negatives Y N
1.11 Training and Documentation Chairman, President and CEO NetControl, I-ETMS Defect resolution report Training materials and documentation updates Training completion rate above 95% Inadequate training leading to recurring issues N Y
1.12 Continuous Improvement Review VP Network Planning & Operations NetControl, I-ETMS Training materials and documentation updates Process improvement plan Continuous improvement review cycle time under 6 months Lack of continuous improvement leading to outdated processes Y N
📊 KPIs & Risk Register

KPIs

Detection accuracy rate above 95% Response time to anomaly detection under 30 minutes Train dispatch accuracy rate above 98% Inspection completion time under 2 hours Defect classification accuracy rate above 90% Repair planning time under 4 hours Repair execution time under 24 hours Post-repair inspection accuracy rate above 95% Defect resolution reporting time under 24 hours System update accuracy rate above 90% Training completion rate above 95% Continuous improvement review cycle time under 6 months

Key Risks

False positives leading to unnecessary inspections Delayed response leading to potential safety hazards Incorrect train dispatch leading to operational delays Misclassification leading to improper repairs Delays in repair planning causing further operational disruptions Extended repair times leading to increased downtime Missed defects during post-repair inspections Delayed reporting causing further operational issues Incorrect system updates leading to false negatives Inadequate training leading to recurring issues Lack of continuous improvement leading to outdated processes

Swim Lanes

Service Operator · 1.1, 1.2, 1.8 Train Dispatcher · 1.3 Control Operator · 1.4 Machinist · 1.5 Electrician (locomotive) · 1.6 Manager-Locomotive Maintenance · 1.7 Senior Director-System Locomotive Facility · 1.9 Manager-Mechanical Maintenance · 1.10 Chairman, President and CEO · 1.11 VP Network Planning & Operations · 1.12