US Class I Rail Process Wiki Engineering: Track, Structures & Signals › Capital Program and Line Capacity Projects
🗺 BPMN Process Flow
RR-06-09-02 BPMN Diagram

Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG

📋 Process Attributes
Process IDRR-06-09-02
Domain FamilyOPERATIONS
L1 DomainEngineering: Track, Structures & Signals
L2 Process GroupCapital Program and Line Capacity Projects
TriggerInitiation by the Chief Engineer or VP Engineering based on identified infrastructure needs and strategic plans.
OutcomeSuccessful completion results in improved track conditions, enhanced signal systems, increased line capacity, and adherence to all relevant regulations.
SystemsNetControl I-ETMS Wabtrax FRA Automated Track Inspection Program (ATIP)
Regulatory Hooks49 CFR Part 236, Subpart I 49 CFR Part 232 GCOR 6.28
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Project Initiation Chief Engineer / VP Engineering Umler Capital Program Plan Project Proposal Project initiation within 30 days of identification Resource allocation and budget constraints Y N
1.2 Regulatory Compliance Check Chief Engineer / VP Engineering NetControl Project Proposal Compliance Report 100% compliance with 49 CFR Part 236, Subpart I Complex regulatory requirements and interpretations Y Y
1.3 Environmental Impact Assessment Service Design / Network Planning Analyst NetControl Compliance Report EIA Report EIA completed within 60 days of proposal approval Coordination with multiple stakeholders N Y
1.4 Design and Engineering Track Supervisor I-ETMS EIA Report Engineering Design Documents Design completed within 90 days of EIA approval Technical challenges and design complexities Y N
1.5 Bid Preparation and Tendering VP Network Planning & Operations NetControl Engineering Design Documents Tender Document Tender document issued within 30 days of design completion Vendor selection and contract negotiation N Y
1.6 Contract Award VP Network Planning & Operations NetControl Tender Responses Contract Agreement Contract award within 45 days of tender issuance Cost and quality trade-offs Y N
1.7 Construction Planning Track Supervisor I-ETMS Contract Agreement Construction Plan Construction plan finalized within 30 days of contract award Scheduling and resource allocation Y Y
1.8 Site Preparation Assistant Foreman (track) Wabtrax Construction Plan Site Preparation Report Site preparation completed within 60 days of plan approval Weather and environmental factors N Y
1.9 Construction Execution Assistant Foreman (track) Wabtrax Site Preparation Report Construction Progress Report Construction progress tracked daily with 95% accuracy Safety and quality control Y N
1.10 Quality Assurance Inspection Track Inspector FRA Automated Track Inspection Program (ATIP) Construction Progress Report QA Inspection Report 100% compliance with 49 CFR Part 232 Defect detection and correction Y Y
1.11 Final Acceptance Chief Engineer / VP Engineering I-ETMS QA Inspection Report Acceptance Certificate Project completion within 6 months of contract award Integration with existing infrastructure Y N
1.12 Post-Completion Review Chief Engineer / VP Engineering NetControl Acceptance Certificate Project Review Report 100% satisfaction with project outcomes from stakeholders Stakeholder feedback and continuous improvement N Y
📊 KPIs & Risk Register

KPIs

Project initiation within 30 days of identification 100% compliance with 49 CFR Part 236, Subpart I EIA completed within 60 days of proposal approval Design completed within 90 days of EIA approval Tender document issued within 30 days of design completion Contract award within 45 days of tender issuance Construction plan finalized within 30 days of contract award Site preparation completed within 60 days of plan approval Construction progress tracked daily with 95% accuracy 100% compliance with 49 CFR Part 232 Project completion within 6 months of contract award 100% satisfaction with project outcomes from stakeholders

Key Risks

Resource allocation and budget constraints Complex regulatory requirements and interpretations Coordination with multiple stakeholders Technical challenges and design complexities Vendor selection and contract negotiation Cost and quality trade-offs Scheduling and resource allocation Weather and environmental factors Safety and quality control Defect detection and correction Integration with existing infrastructure Stakeholder feedback and continuous improvement

Swim Lanes

Chief Engineer / VP Engineering · 1.1, 1.2, 1.4, 1.6, 1.10, 1.11 Service Design / Network Planning Analyst · 1.3 VP Network Planning & Operations · 1.5, 1.6 Track Supervisor · 1.4, 1.7, 1.8, 1.9 Assistant Foreman (track) · 1.8, 1.9 Track Inspector · 1.10