RR-06 RR-06-09-02 — Capital Program and Line Capacity Projects
This process involves the planning, execution, and monitoring of capital projects related to track, structures, and signals on a US Class I freight railroad. It ensures compliance with regulatory requirements and aims to enhance line capacity and safety.
🗺 BPMN Process Flow
Click diagram to zoom & pan • Scroll to zoom • Drag to pan • Download SVG
📋 Process Attributes
| Process ID | RR-06-09-02 |
|---|---|
| Domain Family | OPERATIONS |
| L1 Domain | Engineering: Track, Structures & Signals |
| L2 Process Group | Capital Program and Line Capacity Projects |
| Trigger | Initiation by the Chief Engineer or VP Engineering based on identified infrastructure needs and strategic plans. |
| Outcome | Successful completion results in improved track conditions, enhanced signal systems, increased line capacity, and adherence to all relevant regulations. |
| Systems | NetControl I-ETMS Wabtrax FRA Automated Track Inspection Program (ATIP) |
| Regulatory Hooks | 49 CFR Part 236, Subpart I 49 CFR Part 232 GCOR 6.28 |
📋 L4 Process Steps
| Step | Name | Role | System | Input | Output | KPI | Pain Point / Risk | Decision? | Exception? |
|---|---|---|---|---|---|---|---|---|---|
| 1.1 | Project Initiation | Chief Engineer / VP Engineering | Umler | Capital Program Plan | Project Proposal | Project initiation within 30 days of identification | Resource allocation and budget constraints | Y | N |
| 1.2 | Regulatory Compliance Check | Chief Engineer / VP Engineering | NetControl | Project Proposal | Compliance Report | 100% compliance with 49 CFR Part 236, Subpart I | Complex regulatory requirements and interpretations | Y | Y |
| 1.3 | Environmental Impact Assessment | Service Design / Network Planning Analyst | NetControl | Compliance Report | EIA Report | EIA completed within 60 days of proposal approval | Coordination with multiple stakeholders | N | Y |
| 1.4 | Design and Engineering | Track Supervisor | I-ETMS | EIA Report | Engineering Design Documents | Design completed within 90 days of EIA approval | Technical challenges and design complexities | Y | N |
| 1.5 | Bid Preparation and Tendering | VP Network Planning & Operations | NetControl | Engineering Design Documents | Tender Document | Tender document issued within 30 days of design completion | Vendor selection and contract negotiation | N | Y |
| 1.6 | Contract Award | VP Network Planning & Operations | NetControl | Tender Responses | Contract Agreement | Contract award within 45 days of tender issuance | Cost and quality trade-offs | Y | N |
| 1.7 | Construction Planning | Track Supervisor | I-ETMS | Contract Agreement | Construction Plan | Construction plan finalized within 30 days of contract award | Scheduling and resource allocation | Y | Y |
| 1.8 | Site Preparation | Assistant Foreman (track) | Wabtrax | Construction Plan | Site Preparation Report | Site preparation completed within 60 days of plan approval | Weather and environmental factors | N | Y |
| 1.9 | Construction Execution | Assistant Foreman (track) | Wabtrax | Site Preparation Report | Construction Progress Report | Construction progress tracked daily with 95% accuracy | Safety and quality control | Y | N |
| 1.10 | Quality Assurance Inspection | Track Inspector | FRA Automated Track Inspection Program (ATIP) | Construction Progress Report | QA Inspection Report | 100% compliance with 49 CFR Part 232 | Defect detection and correction | Y | Y |
| 1.11 | Final Acceptance | Chief Engineer / VP Engineering | I-ETMS | QA Inspection Report | Acceptance Certificate | Project completion within 6 months of contract award | Integration with existing infrastructure | Y | N |
| 1.12 | Post-Completion Review | Chief Engineer / VP Engineering | NetControl | Acceptance Certificate | Project Review Report | 100% satisfaction with project outcomes from stakeholders | Stakeholder feedback and continuous improvement | N | Y |
📊 KPIs & Risk Register
KPIs
Project initiation within 30 days of identification 100% compliance with 49 CFR Part 236, Subpart I EIA completed within 60 days of proposal approval Design completed within 90 days of EIA approval Tender document issued within 30 days of design completion Contract award within 45 days of tender issuance Construction plan finalized within 30 days of contract award Site preparation completed within 60 days of plan approval Construction progress tracked daily with 95% accuracy 100% compliance with 49 CFR Part 232 Project completion within 6 months of contract award 100% satisfaction with project outcomes from stakeholders
Key Risks
Resource allocation and budget constraints Complex regulatory requirements and interpretations Coordination with multiple stakeholders Technical challenges and design complexities Vendor selection and contract negotiation Cost and quality trade-offs Scheduling and resource allocation Weather and environmental factors Safety and quality control Defect detection and correction Integration with existing infrastructure Stakeholder feedback and continuous improvement
Swim Lanes
Chief Engineer / VP Engineering · 1.1, 1.2, 1.4, 1.6, 1.10, 1.11 Service Design / Network Planning Analyst · 1.3 VP Network Planning & Operations · 1.5, 1.6 Track Supervisor · 1.4, 1.7, 1.8, 1.9 Assistant Foreman (track) · 1.8, 1.9 Track Inspector · 1.10