Process IDRR-03-01-03
Domain FamilyOPERATIONS
L1 DomainTerminal & Yard Operations
L2 Process GroupInbound Train Processing & Yarding
TriggerArrival notification from Harriman Dispatching Center (HDC) indicating an inbound train is approaching Bailey Yard.
OutcomeThe inbound train is properly classified, inspected, and prepared for outbound movement with all cars in the correct order and condition.
SystemsHarriman Dispatching Center (HDC) PS Technology (PST) NetControl Machine Vision portals Wabtrax CHARM car hire accounting Interline Settlement System (ISS) EHMS equipment health
Regulatory Hooks49 CFR Part 232 AAR Interchange Rules (Rule 88 and related)
📋 L4 Process Steps
StepNameRoleSystem InputOutputKPIPain Point / Risk Decision?Exception?
1.1 Receive Arrival Notification Train Dispatcher Harriman Dispatching Center (HDC) Arrival notification from HDC Acknowledgment of arrival Time to acknowledge arrival < 5 minutes Delayed acknowledgment due to system issues N Y
1.2 Assign Yard Crew Yardmaster PS Technology (PST) Arrival notification Assigned crew list Crew assignment within 10 minutes of arrival notification Insufficient available crew N Y
1.3 Prepare Track for Inbound Train Switchman/Switch Foreman NetControl Assigned crew list Track preparation report Track preparation completed within 20 minutes of arrival notification Obstructed tracks or equipment issues N Y
1.4 Conduct Pre-arrival Inspection Car Inspector (Carman) Machine Vision portals Train schedule and manifest Pre-inspection report Inspection completed within 15 minutes of arrival notification Inadequate visibility or inspection equipment failure Y N
1.5 Classify Cars Using Hump Yard Switchman/Switch Foreman Hump yard (generic classification technology) Pre-inspection report Classification report Cars classified within 30 minutes of arrival Track or equipment malfunctions N Y
1.6 Conduct Post-classification Inspection Car Inspector (Carman) Machine Vision portals Classification report Post-inspection report Inspection completed within 20 minutes of classification Inadequate visibility or inspection equipment failure Y N
1.7 Update Car Hire Accounting Car Inspector (Carman) CHARM car hire accounting Post-inspection report Updated car hire record Record updated within 10 minutes of inspection System downtime or connectivity issues N Y
1.8 Prepare Train for Outbound Movement Yardmaster NetControl Updated car hire record Outbound train preparation report Train prepared within 25 minutes of post-inspection Track or equipment malfunctions N Y
1.9 Conduct Final Air Brake Test Car Inspector (Carman) Wabtrax Outbound train preparation report Air brake test report Test completed within 15 minutes of preparation Defective air brakes or testing equipment failure Y N
1.10 Update Interline Settlement System Switchman/Switch Foreman Interline Settlement System (ISS) Air brake test report Updated settlement record Record updated within 10 minutes of air brake test System downtime or connectivity issues N Y
1.11 Notify HDC of Departure Train Dispatcher Harriman Dispatching Center (HDC) Updated settlement record Departure notification Notification sent within 5 minutes of departure Delayed notification due to system issues N Y
1.12 Update Equipment Health Management System Car Inspector (Carman) EHMS equipment health Air brake test report Updated equipment health record Record updated within 10 minutes of air brake test System downtime or connectivity issues N Y
📊 KPIs & Risk Register

KPIs

Terminal dwell under 24 hours Train speed above 20 mph Time to acknowledge arrival < 5 minutes Crew assignment within 10 minutes of arrival notification Track preparation completed within 20 minutes of arrival notification Inspection completed within 15 minutes of arrival notification Cars classified within 30 minutes of arrival Record updated within 10 minutes of inspection Train prepared within 25 minutes of post-inspection Test completed within 15 minutes of preparation Notification sent within 5 minutes of departure

Key Risks

Air brake test defect released to the road Insufficient available crew Track or equipment malfunctions Inadequate visibility or inspection equipment failure System downtime or connectivity issues

Swim Lanes

Train Dispatcher · 1.1, 1.11 Yardmaster · 1.2, 1.8 Switchman/Switch Foreman · 1.3, 1.5, 1.9, 1.10 Car Inspector (Carman) · 1.4, 1.6, 1.7, 1.12